EXT DPW | PW 887 Ptrr Tnnt Imprv & Fire

Active
SFGOV-0000012033State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

San Francisco Public Works is soliciting bids for the 887 Potrero Tenant Improvement and Fire Alarm Control Unit Replacement project at the Mental Health Rehabilitation Center located on the San Francisco Zuckerberg General Hospital campus. This project aims to expand and enhance the facility's capacity for adult patients requiring intensive mental health care. The scope of work includes upgrading the nurse call communication system, converting isolation rooms into locked seclusion rooms with ligature-resistant features, installing card readers for access control in sensitive areas, and implementing various accessibility improvements to restrooms, kitchenettes, drinking fountains, and paths of travel, including the leveling of the main entry threshold and sidewalk. Additionally, the project requires a facility-wide replacement of outdated fire alarm components with new Edwards EST-4 fire alarm control units and associated devices, including smoke detectors, remote annunciators, and elevator shunt trip and heat detectors. The estimated construction cost for this project is approximately 5.4 million dollars, with a completion timeline of 460 consecutive calendar days. The contract will be awarded on a Lump Sum Bid Items basis, and progressive payments will be made. Bidders must possess a Class B license and be registered with the California Department of Industrial Relations per Labor Code section 1725.5. Awardees must also be certified as compliant with the Equal Benefits Provisions of Article 131 of the San Francisco Labor and Employment Code within two weeks of notification. All work must adhere to Clean Construction requirements and incorporate Partnering Level 2 elements. Quotations are due by 2:30 p.m. on December 2, 2026, and must be submitted online via ShareFile.

General Info

SF Public Works seeks $5.4M bids for mental health facility improvements and fire alarms.

Documents

1

887 Potrero Tenant Improvement and Fire Alarm Control Unit Replacement

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Francisco Public Works
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
887 Potrero Tenant Improvement and Fire Alarm Control Unit Replacement The Scope of Work: This project involves multiple upgrades to the Mental Health Rehabilitation Center (MHRC) at the San Francisco Zuckerberg General Hospital campus intended to expand and improve MHRC’s capacity to serve adult patients requiring intensive mental health treatment and care. The work includes upgrades to the facility’s nurse call communication system for use between nursing staff and patients requiring assistance; conversion of isolation rooms to locked seclusion rooms with ligature-resistant features at select locations; accessibility improvements at restrooms, kitchenettes, drinking fountains, and paths of travel to ground-level exits; leveling of the main entry threshold and nearby sidewalk for accessibility compliances; and installation of card readers at select locations to control access to sensitive areas. Additionally, the project includes a facility-wide fire alarm control unit replacement to replace the outdated facility-wide fire alarm components with like-for-like, new Edwards EST-4 fire alarm control units and select fire alarm devices. The system components to be replaced include remote annunciators, fire alarm boxes, smoke detectors, duct smoke detectors, and addressable modules along with new elevator shunt trip and heat detectors added to the elevator system. The time allowed for completion is 460 consecutive calendar days. The estimated construction cost is approximately $5,400,000. For more information, contact the Project Manager Joe Chin by phone: +1 (555) 000-0000 or email: contact@example.gov . A pre-bid meeting has been scheduled at the project site on Wednesday, November 4, 2026, at 1:00 PM. Located at 887 Potrero Avenue, San Francisco. All attendees that will be attending the pre-bid meeting shall arrive and meet in front of the building by no later than 12:50 PM. All attendees will be escorted by City staff promptly at 1:00 PM to the meeting location inside the building. Any attendees that arrive late will need to wait for the next available City staff to escort them inside the building and to the meeting. All attendees will also be required to wear a face mask while inside the building. After the formal pre-bid presentation by the City Team, attendees will be escorted on a guided site walk by City staff through the project work area. During the site walk, photos of the facility and work area will be allowed but neither the residents at the facility nor any personal information of the residents may be photographed. Class "B" license is required to bid. 1. DPWs Contracts & Bid Opportunities, https://bidopportunities.apps.sfdpw.org/ : to obtain Advertisements, Tabulation of Bids, and Awards information. 2. DPW Electronic Bid Documents Download Site, https://bsm.sfdpw.org/ContractAdmin/Login.aspx to obtain Bid Documents, Plan Holders Lists and Addendum information; may be downloaded at no cost. 3. OLSE, http://sfgsa.org/index.aspx?page=391 : Office of Labor Standards Enforcement (OLSE) website to obtain documents distributed at the pre-bid conference and other information. Documents include: -Healthcare Security Ordinance -Pre-bid and pre-construction information -Paid Sick Leave Ordinance Fact Sheet Effective March 1, 2015, no contractor or subcontractor may be listed in a bid for a public works project unless registered with the DIR as required by Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. DISCLAIMER: The information provided below is a summary of the project. Addenda and other bid changes will be distributed by email only to Plan Holders with email addresses, and will be posted on the DPW Electronic Bid Documents Download Site. DPW is not liable for damages or costs incurred in connection with the use of, or any reliance upon, any information contained on this website. The bid information is subject to typographical error.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for comprehensive interior modernization. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, and updating interior surfaces with new paint and signage. Technical upgrades involve installing raised flooring and electrical distribution, implementing simple dimming controls, replacing ballasts, lamps, and ceiling fans, and replacing variable air volume systems. The project also requires correcting plumbing deficiencies and ensuring all work adheres to ADA accessibility guidelines and seismic-resisting system standards. The performance period is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the notice to proceed. Award will be determined using a best suited negotiate methodology, evaluating price alongside past performance and corporate relevant experience. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract price and adhere to prevailing wage rates. Key administrative requirements include submitting submittals within 14 days of award, providing a comprehensive safety plan, and managing all construction and demolition waste.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 12 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes, and the installation of updated HVAC, exhaust extraction, compressed air, and NFPA-compliant fire suppression systems. Additionally, the work includes replacing electrical distribution, lighting, low-voltage systems, and building automation controls, alongside site improvements such as paving, drainage upgrades, and hazardous materials abatement. The estimated contract value ranges between 10 million and 25 million dollars, with a performance period of 730 days after award. The government will evaluate offers based on the lowest price for two primary exhibit line items: building renovation and paving removal and replacement. Bidders must comply with the Buy American statute and the Davis-Bacon Act. Bonding requirements are tiered by proposal value, with projects over 150,000 dollars requiring bid, payment, and performance bonds. Technical execution requires certified specialists for protective coatings, welding, and firestopping, with strict quality control managed through a three-phase process and documented via a Contractor QC Plan. Invoicing is processed monthly through Wide Area WorkFlow with various supporting certifications and reports required for payment.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 26 days
View Details
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 28, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to Disadvantaged Business Enterprise Good Faith Efforts (GFE) to secure project financing. Bidders must complete six specific GFEs prior to the bid opening date to avoid being deemed non-responsive. Mandatory requirements include providing proof of public notification via an online publication for 30 consecutive days and a print newspaper for one day, as well as evidence of utilizing the Small Business Administration (SBA) and Minority Business Development Agency (MBDA). While outreach documentation such as call logs and emails may be submitted up to three business days after the closing date, failure to include the required publicity and agency assistance proof within the initial bid package will result in disqualification.
RT CONTRACTOR CORP

POSTED

about 3 hours ago

DEADLINE

in 6 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility featuring shallow foundations, a metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and the installation of mechanical, electrical, and underground stormwater retention systems. An additional option for the P1016 Consolidated RDT&E Systems Facility includes the construction of a 17,978 square foot laboratory with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. This solicitation is set aside for various small business categories and requires adherence to Davis Bacon Wage Rates, while remaining exempt from sales tax. Bidders must provide pricing across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, and plumbing, with responses due by November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is for a water damage restoration project at Building 17 of the Grafton Job Corps Center in North Grafton, Massachusetts, operated by Adams and Associates, Inc. for the U.S. Department of Labor. The project aims to restore the first, second, and third floors to their original condition following a fire sprinkler discharge. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement with rubber wall base installation, and necessary electrical and vanity/cabinet repairs. All work must comply with NFPA-101 Life Safety Code, ADA, OSHA, EPA, and local Massachusetts building codes. The contract is a small business set-aside and requires a single lump sum bid, though the lowest price does not guarantee an award. Evaluation is based on best value, weighted by price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion. Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submissions include a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, a Massachusetts contractor's license, and wage rate certification. The contract is subject to the Davis-Bacon Act and Executive Orders regarding minimum wage and paid sick leave. Contractors must provide proof of automobile liability insurance naming Adams and Associates, Inc. as an additional insured. Payment terms are Net 30. Key deliverables include a sequenced construction schedule due within 14 days of the Notice to Proceed and a final punch list to be corrected within 14 days of the substantial completion walk-through.
Grafton Job Corps

POSTED

about 3 hours ago

DEADLINE

in 19 days
View Details
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, including sixteen residential rooms and bathrooms, common areas, and mechanical and utility rooms. The scope of work involves drywall installation, joint finishing, and painting, as well as the temporary removal and re-installation of HVAC equipment. The contractor is responsible for all labor, materials, equipment, and supervision, ensuring that fire resistance and equipment clearances are maintained throughout the process. The project is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100 and the submission of weekly certified payrolls. Proposing contractors must provide itemized pricing, a detailed work plan including project phasing and occupied-building protection, and evidence of relevant experience. Award requirements include providing payment and performance bonding for the full project value, along with liability and worker's compensation insurance, within ten days of award. Final acceptance by CSD is contingent upon the successful testing of restored mechanical, plumbing, electrical, and life-safety systems, the removal of all debris, and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 3 hours ago

DEADLINE

in 22 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
The P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut, involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, foundations with rigid inclusions and load transfer mats, reinforced concrete floors, and comprehensive grounding, lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and buildings 524 and 393. Site work encompasses clearing, rock excavation, grading, fill, and the mitigation of impacts on existing wetlands. Infrastructure improvements include access roads, paved loading areas, landscaping, and a full electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is issued by J & J Contractors, Inc., with a project duration of 1828 calendar days. The opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB.
J & J Contractors, Inc

POSTED

about 3 hours ago

DEADLINE

in 2 days
View Details

More opportunities from California → San Francisco Public Works

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS