Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 19, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

EXT DPW | PW VL CR No. 17

Closed
SFGOV-0000006893State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for the interior modernization of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. This firm fixed price project involves comprehensive renovations including the replacement of corridor and classroom flooring with LVP and carpet tiles, full restroom remodeling, and the installation of raised flooring with integrated electrical distribution for classrooms. Additional technical requirements include updating doors and life-safety components, repainting interior surfaces, replacing variable air volume systems, and upgrading lighting controls and plumbing. The work must adhere to ADA accessibility guidelines and sustainability principles to reduce construction waste and improve energy efficiency. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. Award will be determined using a best suited then negotiate methodology, evaluating price alongside past performance and corporate relevant experience. To be eligible, offerors must achieve at least a satisfactory rating for past performance and an acceptable rating for corporate experience. The contract requires performance and payment bonds equal to 100 percent of the contract price, and a bid guarantee of 20 percent of the bid price or 3 million dollars. Personnel must undergo background checks and adhere to strict security protocols, including the signing of non-disclosure agreements and registration of vehicles on the federal facility.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in 10 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Critical infrastructure upgrades include new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, updated electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project requires hazardous materials abatement and site improvements, specifically paving, drainage upgrades, and repairs to water, sanitary, and storm systems. The contract is estimated between 10 million and 25 million dollars with a performance period of 730 days after award. Award will be based on the lowest price for two primary exhibit line items: building renovation and paving removal and replacement. Proposals are due by November 23, 2026. Depending on the proposal value, contractors may be required to provide bid, payment, and performance bonds, with bid bonds set at 20 percent of the proposal amount. The work must comply with the Davis-Bacon Act, the Buy American statute, and ADA accessibility guidelines. Invoicing is processed monthly via Wide Area WorkFlow using specific NAVFAC forms, and a contractor-led quality control plan must be approved by the Contracting Officer before construction begins.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in 16 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is seeking pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility featuring shallow foundations, a metal standing seam roof, and exterior walls composed of masonry and metal panels. Comprehensive site work is required, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option includes the construction of a 17,978 square foot laboratory facility and the demolition of Building 1272T, a 548 square meter engineering facility. Bids are requested across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business entities. All work must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and project documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 5 hours ago

DEADLINE

in 22 days
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is for a multi-floor water damage restoration project at Building 17 of the Grafton Job Corps Center in North Grafton, Massachusetts, following a fire sprinkler discharge. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project requires the restoration of the first, second, and third floors to their original condition. The scope of work includes drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement with rubber wall base installation, and various electrical and cabinetry repairs. All work must comply with NFPA-101 Life Safety Code, ADA, OSHA, and EPA regulations, with Massachusetts state laws prevailing if they are more stringent than federal requirements. The contract is a single lump sum award based on best value, with evaluation weights assigned to price (60), quality (20), past performance (10), and schedule (10). The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion. Bidders must have a valid Massachusetts Contractor's License and attend a mandatory pre-bid site visit. Required proposal documentation includes a detailed cost breakdown for labor, materials, and equipment, a timeline for completion, a 90-day bid guarantee, and wage rate certification. Payment terms are Net 30, and the contract is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications.
Grafton Job Corps

POSTED

about 5 hours ago

DEADLINE

in 9 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to return them to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as common areas and mechanical rooms. The scope of work includes drywall installation, joint finishing, and painting for approximately 300 square feet of floor area in utility rooms and hallways, along with the temporary removal and re-installation of HVAC equipment such as furnaces and water heaters. The contractor is responsible for all labor, materials, equipment, and supervision, ensuring that fire resistance and equipment clearances are maintained throughout the process. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Proposals must include detailed relevant experience, a comprehensive work plan addressing project phasing and occupied-building protection, and itemized pricing by room and trade. The project is subject to the Davis Bacon Act under wage determination OR20260100, requiring the submission of weekly certified payrolls. Awarded contractors must provide payment and performance bonding for the full project value, as well as proof of general liability and worker's compensation insurance, within ten days of award. Final acceptance by CSD requires the correction of all deficiencies and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 5 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

This contract involves the installation of curb ramps, catch basins, and related infrastructure at multiple intersections across Districts 2, 4, 5, 7, 9, and 10 in San Francisco, California. The project has an estimated budget of approximately $1,180,000 and is scheduled for completion within 173 consecutive calendar days. Bidders must hold a Class "A" license to qualify, and the project includes various preparatory and compliance documents such as the Healthcare Security Ordinance and Paid Sick Leave Ordinance, which are accessible through designated city websites. A pre-bid conference will be conducted via conference call on September 5, 2024, to provide additional project details and answer questions. Interested parties can obtain bid documents, addenda, and related project information from the city's electronic bid download site, with updates and addenda distributed exclusively via email to registered plan holders. The solicitation, posted by the San Francisco Department of Public Works, is open until September 18, 2024. The project emphasizes adherence to labor standards, including registration with the Department of Industrial Relations, and requires careful review of all bid and project documents. For further details or inquiries, contact Anastastia Haddad at the provided email or phone number.

Documents

2
PDF, High priority: read this firstitb
High
PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → San Francisco Department of Public Works
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Anastastia HaddadContact

Full Description

Show more
Various Locations Curb Ramp No. 17
Scope of Work: The Work is located at various intersections in Districts 2, 4, 5, 7, 9, and 10 of San Francisco, CA and consists of curb ramp installation, catch basin work, and all associated work.
The time allowed for completion is 173 consecutive calendar days. The estimated construction cost is approximately $1,180,000.
A pre-bid meeting will be held by conference call on Thursday, September 5, 2024 starting at 2:00 p.m.
Microsoft Teams Meeting Call in (audio only) +1 (555) 000-0000,,683461419# United States, San Francisco Phone Conference ID: 683 461 419# OR Join on your computer or mobile app or room device Meeting ID: 249 544 728 218 Passcode: JzL5Js
Class "A" license is required to bid.
1. DPWs Contracts & Bid Opportunities, https://bidopportunities.apps.sfdpw.org/: to obtain Advertisements, Tabulation of Bids, and Awards information.
2. DPW Electronic Bid Documents Download Site, https://bsm.sfdpw.org/ContractAdmin/Login.aspx to obtain Bid Documents, Plan Holders Lists and Addendum information; may be downloaded at no cost.
3. OLSE, http://sfgsa.org/index.aspx?page=391: Office of Labor Standards Enforcement (OLSE) website to obtain documents distributed at the pre-bid conference and other information.
Documents include:
-Healthcare Security Ordinance
-Pre-bid and pre-construction information
-Paid Sick Leave Ordinance Fact Sheet Effective March 1, 2015, no contractor or subcontractor may be listed in a bid for a public works project unless registered with the DIR as required by Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].
DISCLAIMER: The information provided below is a summary of the project. Addenda and other bid changes will be distributed by email only to Plan Holders with email addresses, and will be posted on the DPW Electronic Bid Documents Download Site.
DPW is not liable for damages or costs incurred in connection with the use of, or any reliance upon, any information contained on this website. The bid information is subject to typographical error.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS