Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on July 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

EXT MOH | Derek Silva Renovation Early Bid Trades

Closed
SFGOV-0000011922State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The project, titled EXT MOH | Derek Silva Renovation Early Bid Trades, is a seismic upgrade and renovation initiative under the Mayor's Office of Housing and Community Development in San Francisco, managed by D&H Construction and led by architect Paulett Taggart Architects. The work involves selective demolition of residential and commercial units for structural reinforcement, MEP system upgrades, ADA-compliant unit conversions, and exterior façade restoration. Bid submissions are due by 2:00 PM on Monday, August 12, 2026, and must be submitted solely through BuildingConnected after joining the designated bid package in the public plan room. Four key trades are solicited: Design-Build Micropile, Structural Steel, Design-Assist Elevator, and Design-Build Fire Sprinkler. Bidders are required to review all documentation available on BuildingConnected or the Builder’s Exchange, and must adhere to strict site access protocols—only scheduled job walks on July 16, 2026, are permitted due to ongoing tenancy, with no unscheduled site entry allowed. Labor on this project is subject to both state and federal prevailing wage standards, with detailed determinations outlined in Exhibit G. Subcontracting goals include a mandatory 25% Small Business Enterprise (SBE) participation and local hiring requirements, with all SBE subcontractors needing to complete and submit Exhibit K, the SBE Eligibility and Subcontracting Declaration. Pre-bid questions must be submitted by end of day Friday, July 24, 2026, and a voluntary pre-bid conference is scheduled for July 22, 2026, via Microsoft Teams. Insurance obligations are defined in Exhibit C, and while Exhibits B and E are provided for reference, they are only required upon becoming the apparent successful bidder. Such bidders must also complete the Subcontractor Qualification Questionnaire if they have not previously worked with D&H Construction, and all winning bidders will be bound by the terms in Exhibits D, F, H, I, J, and K. The project is tentatively set to begin in April 2027 with a duration of 10.5 months.

General Info

Seismic renovation in San Francisco; bid due Aug 12, 2026; four trades; SBE 25%; prevailing wages; site access limited to July 16.

Agency

California → Mayor's Office of Housing and Community DevelopmentView Agency

NAICS

238190 - Other Foundation, Structure, and Building Exterior ContractorsView NAICS

Place of Performance

San Francisco, CA, USA

Set-Aside

NONE

Documents

(1)

Bid Memo No 1 - 7.29.26 Revision 1

DOCXamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Mayor's Office of Housing and Community Development
Contacts1 person available
OfficeN/A
Organization / Agency
California → Mayor's Office of Housing and Community Development
View Agency Profile
Office AddressN/A
Contacts

Full Description

Show more
08/10/2026: Bid Memos 1 to 4 uploaded. Due date changed to 08/12/2026 This is a D+H Project. BID DUE DATE: Monday, August 12 at 2:00 PM. REQUESTED BID TRADES: - Design-Build Micropile - Structural Steel - Design-Assist Elevator - Design-Build Fire Sprinkler PROJECT DESCRIPTION: - Selective demolition of units and commercial space for seismic upgrade, MEP, and ADA unit conversions - Exterior façade restoration *Bid Forms on Building Connected will be updated prior to a bid due date. OWNER: Mercy Housing ARCHITECT: Paulett Taggart Architects TENTATIVE START: April 2027; 10.5 month duration. See Exhibit D LABOR WAGE REQUIREMENTS AND MONITORING: Project is subject to both State and Federal prevailing wage. See Exhibit G for prevailing wage determinations. SUBCONTRACTING GOALS & LOCAL HIRING REQUIREMENTS: Project is subject to 25% SBE goal and mandatory local hire. Refer to Exhibit H, I, J and K. Per request from SFCMD, all SBE subcontractors are required to fill out Exhibit K, “SBE Form 2 – SBE Eligibility and Subcontracting Declaration” and submit with your proposals. PRE-BID VOLUNTARY CONFERENCE: A pre-bid online conference will be held for all trades on Wednesday, July 22 at 10 AM. Use the following code to join the meeting at the noted time using MS Teams: Join: https://teams.microsoft.com/meet/21297075086421?p=r9dh59mq9xPkIeoIzC Meeting ID: 212 970 750 864 21 Passcode: m5T8S4VS Dial in by phone +1 323-486-4052,,995061079# United States, Los Angeles Phone conference ID: 995 061 079# JOB WALK: We have scheduled 1 date to visit the site. The date and times are as follows: Thursday, July 16, 2026. a. 1st group walk: 10 am to 11 am b. 2nd group walk: 11 am to 12 pm If your firm would like to attend the pre-bid jobwalk, please send a message thru BuildingConnected. The site is currently occupied by tenants and free access is not available. NO SUBCONTRACTOR / SUPPLIER WILL BE ALLOWED TO ACCESS THE SITE WITHOUT SCHEDULING A TIME AND DATE. PRE-BID RFI DEADLINE: Friday, July 24, 2026 EOD. BID DOCUMENTS: Refer to Exhibit A for all bid documents that apply for this project. Documents are available for review at BuildingConnected or Builder’s Exchange. BID SUBMISSION: All bid submissions will be done using Building Connected. Your firm needs to join a bid package on our public plan room to submit a bid. INSURANCE REQUIREMENTS: Refer to Exhibit C for more information. ADDITIONAL BID EXHIBITS: Note that sample subcontract Exhibit B and waivers Exhibit E have been included for review and are not required to be returned unless your firm is the apparent successful bidder for this project. If you are the apparent successful bidder and have not subcontracted with D&H Construction previously, you will be required to fill in the Subcontractor Qualification Questionnaire before you are awarded the job. See Exhibit F for more information. Subcontractor qualification form is also available here: https://www.dh-construction.com/wp-content/uploads/2026/04/Subc-Qual-Questionnaire_2026.0401_Fillable.pdf D&H Construction looks forward to the opportunity to work with your project team in our bidding process. . . .

More opportunities from California → Mayor's Office of Housing and Community Development

Same awarding agency

NAICS: 236220
New
SLED
EXT MOH | Sunnydale Market at Amani TI [Rebid]
Solicitation # SFGOV-0000012024
This interior tenant improvement project involves the build-out of a 2,779 square foot small grocery market located on the ground floor of a mixed-use building in San Francisco. The scope of work includes the creation of a sales floor, produce prep area, refrigeration systems, cold storage cooler boxes, storage areas, and an office, as well as the conversion of an existing ADA bathroom into storage. The project requires comprehensive mechanical, electrical, plumbing, and refrigeration improvements, including the installation of a Type 1 duct to the roof. This is a rebid project that omits Build America, Buy America Act requirements and incorporates revised architectural and MEPR plans. Construction is projected to begin on November 23, 2026, with a target opening date of April 9, 2027. Bids must be submitted by August 24, 2026, and pricing must remain firm through December 31, 2026. All subcontractors are required to adhere to the higher of State or Federal prevailing wage laws and provide certified payroll. The contract includes a 5 percent retention rate and requires subcontractors to indemnify Sutti Associates against any wage-related penalties. Bidders are expected to have independently verified all existing site conditions, as change orders based on observable site conditions will not be accepted.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 9 days
View Details
NAICS: 541380
SLED
Deferred Submittals Special InspectionThe contract requires specialized inspection and structural observation services for engineered systems that have deferred submittals, including critical components such as structural connections and facade elements. These inspections must ensure compliance with approved designs and building codes throughout construction, with particular attention to items whose detailed submittals were delayed but are essential to structural integrity and safety. The work is tied to a project under the Mayor's Office of Housing and Community Development in San Francisco, focusing on ensuring quality and code adherence in complex building systems where design details may not be fully available at the outset of construction. The opportunity is listed as a subcontract with a NAICS code of 541380, indicating it falls under architectural, engineering, and related services. The solicitation was posted on August 4, 2026, with a response deadline of August 29, 2026, giving potential bidders approximately four weeks to prepare and submit proposals. The place of performance is firmly located in San Francisco, and while specific contact information is not provided, the contract details can be accessed through the San Francisco City Partner portal. No set-aside classification is indicated, meaning the contract is open to all qualified proposers without preference based on business size or ownership type.
Testing Laboratories and Services

POSTED

12 days ago

DEADLINE

in 12 days
View Details