Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

EXT MOH | Laguna Honda Early DB Trades Bid

Active
SFGOV-0000012153State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Laguna Honda Senior Housing project, managed by the Cahill/Guzman Joint Venture for owner Mercy Housing, involves the new construction of a 159-unit senior housing building at 375 Laguna Honda Boulevard in San Francisco. The development will integrate health services, a senior center, home health services, and an early childcare education center into a single building. The project is tentatively scheduled to begin in late 2027 with a duration of 22 months. Requested bid trades include design-build services for ground improvements, exterior building maintenance, fire sprinklers, plumbing, HVAC, electrical, and solar panels, as well as design-assist for elevators. Bids are due by November 3, 2026, at 2:00 p.m. via BuildingConnected, with a required budget breakdown covering the base building scope, the senior center shell and buildout, and the early childhood education center shell. Subcontractors must be prequalified through Compass prior to contract award, as selection will be based on prequalification data, past performance, current backlog, and SBE/LBE participation, with a specific SF CMD SBE goal of 25 percent. Labor requirements mandate the use of union labor for carpenters, laborers, and operating engineers, and all work must adhere to prevailing wage and local hiring requirements. Shell construction for the senior and education centers must meet MOHCD standards.

General Info

Cahill/Guzman JV seeks bids for a 159-unit senior housing project in San Francisco.

Documents

1

Laguna Honda Senior Housing #545 - Invitation to Bid

DOCX, High priority: read this first1 page · itb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Mayor's Office of Housing and Community Development
Contacts1 person available
OfficeN/A

Full Description

Show more
INVITATION TO BID LAGUNA HONDA SENIOR HOUSING - #545 375 Laguna Honda Boulevard, San Francisco, CA 94116 October 2, 2026 BID DUE DATE: Tuesday, November 3, 2026 @ 2:00 p.m. REQUESTED BID TRADES: • Design-Build Ground Improvements / DDCs • Design-Build Exterior Building Maintenance • Design-Assist Elevators • Design-Build Fire Sprinklers • Design-Build Plumbing • Design-Build HVAC • Design-Build Electrical • Design-Build Solar Panels THIS IS A CAHILL/GUZMAN JOINT VENTURE. New construction of a 159-unit Senior Housing building. Project will also include Health Services, Senior Center, Home Health Services and Early Childcare Education Center. Development is located on the site of and adjacent to the Laguna Honda Hospital in San Francisco. (This project used to be 2 phases/buildings and now is planned to be a single building.) OWNER: Mercy Housing ARCHITECT: Herman Coliver Locus Architecture (HCLA) TENTATIVE SCHEDULE: Start - Late 2027. Duration - 22 months. LABOR REQUIREMENTS: Union Labor required for carpenters, laborers, & operating engineers / Prevailing Wage / Local hiring requirements. SUBCONTRACTING GOALS: SF CMD SBE goal of 25% VOLUNTARY PRE-BID MEETING / JOBWALK: There will be a VOLUNTARY, VIRTUAL pre-bid meeting, date and time TBD DEADLINE FOR BID RFI’s: Wednesday, October 10/2/26, 2026 @ 2:00 PM Please break out your budgets into the following manner: a. Base Building Scope b. Senior Center Shell (cold & warm shell per MOHCD standards) c. Senior Center Buildout (scope beyond warm shell to complete the space, this will not be a TI buildout) d. Early Childhood Education Center Shell (cold & warm shell per MOHCD standards, the build out of this space will be completed as a TI scope) BID DOCUMENTS: All bid documents can be accessed through BuildingConnected. The link to the bid documents has also been sent to various Builder’s Exchanges and Organizations in the Bay Area for viewing. BID PROCESS: All bid submissions and communication should be made on BuildingConnected. PREQUALIFICATION PROCESS: Subcontractors bidding to Cahill shall be prequalified through Compass ( https://compass-app.com ) prior to contract award and shall keep their prequalification up to date for the duration of the contract. Subcontractors are advised that prequalification information, past performance, current backlog levels and SBE / LBE participation will be a factored into the bid selection process. Please update your bidding status on BuildingConnected by Friday, October 9, 2026. CONTACT: For any questions regarding this project or BuildingConnected access, please contact Cahill Estimating at estimating@cahill-sf.com . PLEASE do not contact the Owner and/or Architect directly. . . .

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
TCSG-441-CM Gwinnett Technical College North Fulton Campus Expansion
Solicitation # TCSG-441-CM
The Georgia State Financing and Investment Commission, acting on behalf of the Technical College System of Georgia, is soliciting Construction Management at Risk services for Project No. TCSG-441, the Second Building Campus Expansion at Gwinnett Technical College's North Fulton Campus in Alpharetta, Georgia. The project has an estimated construction cost of 28.7 million dollars and involves the development of a 45,500 square foot instructional facility for healthcare programs, along with an additional 8,000 to 12,000 square feet for welding and HVAC programs. The estimated construction duration is 15 months, with design services anticipated to begin in November 2026 and construction documents expected by September 2027. Eligible firms must hold a State of Georgia General Contractor's License, be registered with the Georgia Secretary of State, and maintain specific insurance coverages, including 5 million dollars in commercial umbrella liability. Financial and safety requirements include a current ratio of 1.0 or higher and an Experience Modification Rating of 1.2 or less. Award selection is based on the highest total score combining a Qualifications Score and a Fee Proposal Score. Contract administration, including payment applications and change orders, will be managed through the e-Builder project management program, and the project must comply with the Energy Efficiency and Sustainable Construction Act of 2008 and Georgia Peach certification standards.
Georgia State Financing and Investment Commi

POSTED

about 10 hours ago

DEADLINE

in 23 days
View Details
NAICS: 236220
New
SLED
JBLM Construct CHP Building
Solicitation # W912K3-26-R-A0001
Solicitation W912K3-26-R-A0001 is a Small Business Set-Aside for the design-bid-build construction of a 20,000 square foot Pre-Engineered Steel Controlled Humidity Preservation (CHP) Building at Joint Base Lewis McChord, Washington. The project involves the purchase and erection of the steel building and concrete slab, installation of underground utilities, and the integration of specialized systems including desiccant dehumidifiers and a dry pipe fire suppression system. All work must comply with UFC 3-600-01, NFPA 13, and JBLM Department of Public Works engineering requirements. The project is estimated between $1 million and $5 million, with a statutory cost limit of $5 million. The government intends to award a Firm Fixed Price task order based on a balanced evaluation of technical capability and price. Technical submissions must include a task-oriented project schedule with a completion date no later than 360 days after the Notice to Proceed, as well as qualifications for key personnel. Performance must begin within 10 calendar days of the Notice to Proceed, with total completion required within 365 calendar days. The contract requires payment and performance bonds for awards exceeding $150,000 and mandates adherence to prevailing wage rates per General Decision Number WA20260111 for Pierce County. Invoicing is to be processed via Wide Area Workflow.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 12 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection, among others. This is a small business set-aside solicitation governed by Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 11 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 236220
New
South Concourse Evolution (SCE) Bid Package 3
Solicitation # south-concourse-evolution-sce-bid-package-3
Hensel Phelps, acting as the General Contractor/Construction Manager, is soliciting bids for Bid Package 3 of the South Concourse Evolution (SCE) project at the Seattle-Tacoma International Airport in Washington. This solicitation is set aside for Small Disadvantaged Businesses under NAICS code 236220. The scope of work is divided into several subsystems, including Phase 1 glass and aluminum systems, vertical transportation for Phase 1 and select Phase 2, and the demolition and installation of passenger loading bridges. Additionally, the package covers the build-out of main electrical rooms, encompassing masonry, drywall, doors, frames, hardware, and miscellaneous metals. Budget ranges for these subsystems vary, with the glass and aluminum systems estimated between 7.5 million and 10 million dollars and passenger loading bridges between 3 million and 4.5 million dollars. The project is governed by a Project Labor Agreement and requires all subcontracts to be executed on standard Hensel Phelps forms. Bidders must submit a bid bond using the provided forms and successful awardees must furnish Small Business Administration Form ID numbers. The solicitation encourages participation from small, disadvantaged, veteran-owned, service-disabled veteran-owned, and HUBZone businesses. All subcontractors are required to provide a workers compensation waiver of subrogation. The response deadline for this solicitation is October 14, 2026.
Hensel Phelps

POSTED

about 11 hours ago

DEADLINE

in 7 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This extensive project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, foundations with rigid inclusions and load transfer mats, reinforced concrete floors, grounding and lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building. The site work involves significant demolition of 18 existing magazines and two buildings, along with clearing, rock excavation, grading, and wetland mitigation. Comprehensive infrastructure improvements are required, including access roads, paved loading areas, landscaping, and full electrical utilities featuring primary and secondary distribution systems and telecommunications. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must submit responses by October 31, 2026, and should contact Rahul Maheshwari for bid invitations and documentation.
J & J Contractors, Inc

POSTED

about 11 hours ago

DEADLINE

in 24 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS