This Solicitation opportunity from California was posted on August 13, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
EXT MOH | Treasure Island IC 4.3: ONLY Metal Frame
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This project involves a bid for the structural metal framing scope of a new affordable housing development located at Treasure Island Parcel IC 4.3 in San Francisco, with a total construction area of approximately 219,250 square feet across six stories. The work is limited to the early trade bid phase, focusing solely on structural metal framing, with the project scheduled to commence in the fourth quarter of 2026 and expected to last around 22 months. The project is managed by The John Stewart Company and Catholic Charities CYO of the Archdiocese of San Francisco, with architectural design by Paulett Taggart Architects. The development includes residential units, community spaces, and supporting infrastructure, with a mix of Type II metal and Type I concrete construction. Bidders are encouraged to participate via a voluntary virtual pre-bid conference scheduled for August 26, 2024, and must submit their bids by September 11, 2024. All bid documents and communication are managed through BuildingConnected, with a deadline for bid inquiries set for August 28, 2024. The project mandates adherence to prevailing wage laws, union labor requirements for specific trades, and participation goals for local workforce and small business enterprises, including a 20% SBE participation target. The contract size is estimated to be between 5 million and 10 million dollars, with the primary point of contact being Cahill Estimating. The project emphasizes compliance with environmental, safety, and design-build standards, and all bidding activities must be completed through the designated online platform.
General Info
Place of Performance
CA, USASet-Aside
Documents
9AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Full Description
EARLY TRADE BID ONLY – STRUCTURAL METAL FRAMING ONLY CAHILL JOB - #579 Treasure Island Parcel IC 4.3, San Francisco, CA 94130 100% Schematic Development
1. BID DUE DATE: Wednesday, September 11, 2024 @ 2:00 p.m. 2. JOB WALK: There is no job walk scheduled for this trade, however, subcontractors are encouraged to visit the site on their own. 3. Voluntary, Virtual Pre-Bid Conference: Monday, August 26, 2024 @ 9 a.m. a. Location: Click Here for Virtual Meeting Link: https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZmQ0MTNlZTYtMDhkNi00NWJlLWI3NmYtNzI3NzIyM2Q1MDFi%40thread.v2/0?context=%7b%22Tid%22%3a%22f46cb8aa-2e43-43a5-9146-29f8ab7a3553%22%2c%22Oid%22%3a%2201dc396e-972f-43b3-aadf-d90d71874ec2%22%7d b. Or Call in #: +1 (555) 000-0000 - Conference ID: 889 326 494 4. REQUESTED DESIGN-ASSIST TRADE: Structural Metal Framing 5. PROJECT DESCRIPTION: THIS IS A CAHILL PROJECT. New Construction / 219,250 gsf / 150 Units / 6 Stories / Affordable Housing / 5-Story Type II Metal over 1-Story Type I Concrete. Level 1 consists of property management offices, mail, bike parking, car parking spaces, and residential units with stoops. Level 2 consists of community room, courtyards, laundry room, and residential units. Level 3-5 are residential units. Level 6 consists of residential units and a laundry room. 6. OWNER/DEVELOPER: The John Stewart Company / Catholic Charities CYO of the Archdiocese of San Francisco 7. ARCHITECT: Paulett Taggart Architects 8. TENTATIVE SCHEDULE: Begin construction in 4th Qtr 2026 with a total 22-month duration. 9. LABOR REQUIREMENTS: Prevailing Wage (state or federal, higher of the two) for all trades / Union Labor required for carpenters, laborers, operating engineers only 10. EQUAL OPPORTUNITY WORK FORCE PARTICIPATION GOALS: The developer has committed to meeting the San Francisco Contract Monitoring Division’s (SFCMD) non-discrimination, equal opportunity contracting and local workforce hiring participation goals including Small Business Enterprises participation (20% SBE), Construction Work Force Goals, Prevailing Wage requirements. 11. DEADLINE FOR BID RFI’s: Wednesday, August 28, 2024 @ EOD. 12. BID DOCUMENTS: All bid documents can be accessed through BuildingConnected. 13. BID EXHIBITS: All bidders should review the bid requirements as defined by the Bid Exhibits which include: Scope of Work, General Requirements, Contracting & Workforce Hiring Goals, Schedule, Contract Term/Labor Relations, Insurance Requirements, Document List, Logistic plan, Environmental Health and Safety, Design Build Requirements, and BIM Requirements, 14. BID FORM: All bid submissions should include a completed and signed bid form. 15. BUILDINGCONNECTED: All bid submissions and communication should be made on BuildingConnected. 16. BID STATUS: Please update your bidding status on BuildingConnected by Tuesday, August 20, 2024. 17. CONTACT: For any questions regarding this project or BuildingConnected access, please contact Evan Lei at contact@example.gov or Cahill Estimating at contact@example.gov. . . .
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
