This Solicitation opportunity from California was posted on March 13, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Ext Prt|2858 Demolition Bldgs & Wharf
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
General Info
Place of Performance
CA, USASet-Aside
Documents
3AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- 2027030Open now, due in 3 days
- Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 10 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
The Port property at Pier 90 housed grain mill operations from 1923 until the early 1990’s. The site includes three sets of concrete-reinforced grain silos, grain elevators, steel ship loading towers, steel conveyor bridges connecting these structures, and ancillary buildings and structures, which include rail sheds, control buildings, a timber wharf, and five concrete pile-supported dolphin structures supporting the ship loading towers. Attachment 1 identifies the distinct components on the site. The grain silos have been vacant since 1992, and have attracted trespassers, resulting in vandalism and accumulated trash throughout the site. Security and maintenance of this property has been a net operating loss to the Port without any economic benefit to the community. The timber wharf adjacent to the silos has fallen into a state of disrepair. Piles and timber framing have deteriorated over time, and sections of wood deck and asphalt paving have fallen into Islais Creek.
There are currently insufficient funds to demolish all vacant structures on the land side and waterside. To accomplish the greatest amount of work with the available funds, the project is separated into a base bid and bid alternates. Port staff and the consultant team determined that demolition of the nine ancillary buildings on site needs to be prioritized to significantly improve safety and security of the site, since these buildings are the main access points for trespassers. The silos will be more easily secured once the other connected buildings and entry points are demolished. The waterside demolition of the steel loading towers and timber wharf will be included as additive bid alternates to mitigate waterside access and hazards.
The proposed scope will minimize the risk of trespassers entering the silos and endangering themselves or vandalizing the site. Phasing the demolition on site will allow the Port to move forward with the available funding and continue preparing the site for future development opportunities.
PROJECT SCOPE
The base bid scope of work is to demolish all the landside buildings and structures on Pier 90 with the exception of the grain silos themselves, abandonment of underground utilities in place, and hazardous material abatement. There are three additive bid alternates, two of which include waterside work: 1) demolition of six, pile-supported steel loading towers, 2) demolition of the dilapidated timber wharf deck and pilings, and 3) installing additional security fencing. The six concrete, pile-supported dolphin structures will remain in place on the waterside as they are in good condition and may have potential maritime use in the future.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
