Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 10, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

EXT PRT|Pier 50 Pile Demo

Closed
SFGOV-0000010916State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project, necessitated by a sprinkler system failure, requires the remediation of mold throughout the entire building and the cleaning or replacement of damaged theater seating cushions. All work must be performed in accordance with ANSI/IICRC S520 standards, EPA guidelines, OSHA regulations, and the Micro Air Inc. Mold Testing report dated April 11, 2024. Key requirements include the provision of a Certified Industrial Hygienist for daily site visits and final clearance, the implementation of a detailed remediation plan featuring HEPA filtration and negative air pressure, and adherence to Indiana state regulations where they exceed federal standards. The contract is a single lump sum award based on best value, with evaluation weights assigned to price (60), quality (20), past performance (10), and schedule (10). Bidders must be small businesses or certified VOSB, SDVOSB, WOSB, or HUBZone entities and must possess a valid Indiana Contractor's License. Proposals must include a detailed cost breakdown, a timeline for substantial completion, and certification of compliance with Davis Bacon Act wage rates. The selected contractor must start work within 14 days of the Notice to Proceed and maintain specific automobile and workers compensation insurance naming Adams and Associates, Inc. as an additional insured. Payment is issued on Net 30 terms, contingent upon the submission of certified payroll records, a completed SF 1413, and the release of liens.
Atterbury Job Corps Center

POSTED

about 2 hours ago

DEADLINE

in 11 days
NAICS: 562910
New
SLED
MPE Three Classroom Mold Abatement - Rooms 22, 23, 24
Solicitation # 01 (2026-2027)
The Montebello Unified School District is soliciting bids under RFQ No. 01 (2026-2027) for mold abatement services in three classrooms, specifically Rooms 22, 23, and 24 at MPE in Montebello, California. The scope of work includes the abatement process, cleaning of A/C systems, and the movement of furniture before and after the project. Contractors must utilize containment, three-stage decors, and negative air pressure, while maintaining CAL/OSHA safety standards and good housekeeping. All work will be monitored by a third-party consultant, and the contractor is responsible for any necessary re-cleaning if good clearances are not achieved. Regulated disposal must be accompanied by a manifest, and proper mold signage and yellow caution flagging are required on-site. Bids must be submitted by November 2, 2026, at 9:00 a.m. via the designated secure portal. The contract will be awarded to the best value bidder based on price, proven ability to comply with specifications, capability, and credibility, with a preference for local firms in the event of equal low bids. Requirements for submission include a Non-Collusion Affidavit and a Certificate of Workers' Compensation Insurance. The successful vendor must provide a minimum one-year warranty and maintain comprehensive insurance naming the District as an additional insured. Payment is due 30 days after the receipt of a correct invoice or acceptance of goods. The District reserves the right to terminate the agreement with 30 days' written notice or immediately upon failure to perform.
Montebello Unified School District

POSTED

about 5 hours ago

DEADLINE

in 5 days
NAICS: 562910
New
Federal
Testing & Inspecting, Preventative Maintenance, Corrective Repair, Emergency Repair, and Service Calls
Solicitation # 36C25727R0018
Solicitation 36C25727R0018 is a Firm-Fixed-Price, indefinite-quantity contract issued by the Department of Veterans Affairs for mold remediation and water intrusion services. This procurement is a total set-aside for VIP-listed Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 562910. The scope of work involves providing all labor, equipment, and supervision for emergency response, stabilization, and remediation of water intrusion events across multiple Texas locations, including Dallas, Garland, Bonham, and Grand Prairie. The contract is structured across three ordering periods from December 1, 2026, through November 30, 2029. The contractor must adhere to strict response time tiers, ranging from two hours for patient-critical areas to eight hours for administrative support. Performance is governed by ANSI/IICRC S520-2024, EPA guidelines, and VHA M3P standards, with a heavy emphasis on ICRA/PCRA workflows and OSHA 1910.134 safety compliance. Award will be based on a best-value determination evaluating technical approach, price, and past performance, rather than the lowest price. Proposals are due by November 18, 2027, and must be submitted in two separate PDF volumes, including a redacted technical version for evaluation.
257-NETWORK Contract Office 17 (36C257)

POSTED

about 6 hours ago

DEADLINE

in about 1 year

AI Contract Overview

Show more

The City of San Francisco has issued an informal solicitation for a construction project at Pier 50, specifically focusing on the removal of approximately 320 exposed 14-inch wood piles adjacent to Shed B’s south apron, with a scheduled in-water work window between June 15 and November 30, 2025, or 2026 if necessary. The project requires contractors to understand and comply with various environmental and regulatory permits related to marine construction, including considerations for spawning seasons of local fish species, with no additional compensation for coordination efforts. Bids must be submitted via email by July 30, 2025, with an optional pre-bid meeting scheduled for July 23, 2025. Additionally, there is an additive alternate for demolishing the entire Pier 60 structure, which includes removing approximately 72 piles, hazardous material abatement, and disposal of debris. The Pier 60 demolition is contingent upon funding and involves significant safety and environmental considerations due to the structure’s disrepair and presence of hazardous materials like asbestos and lead paint. The overall contract value is estimated between $500,000 and $2 million, and the project aims to address safety hazards while ensuring compliance with environmental regulations and permits from multiple agencies. For further details, interested bidders can contact the project manager, Paul Chasan.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Francisco
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
This is an informal solicitation process. All references to “Bid”, “Bidders”, or “Bidding” in these Contract Documents shall mean “Quote” or “Quotation” as applicable.
INVITATION FOR BIDS For Contract No. 2881, PIER 50 PILE DEMO Optional Pre-Bid Meeting: July 23, 2025, 10:00 at Pier 50 B, Terry A. Francois Blvd, San Francisco. Quotes shall be submitted via email to contact@example.gov prior to the due date and time with the following in the Subject: “CITY PROJECT: BID CONTRACT NO. 2881 PIER 50 PILE DEMO”. Quotes are due on July 30, 2025 by 15:00.
The Port of San Francisco (the “Port”) announces an Invitation for Bids (“IFB”) for construction on PIER 50 PILE DEMO in San Francisco, CA. Schedule: All demolition activities must be completed within the in-water work window between June 15, and November 30th. If scheduling does not permit that work is performed in the 2025 in-water work window, work will be performed in the 2026 in-water work window.
Contractor shall be responsible for fully understanding scheduling constraints associated with certain marine construction activities and the referenced Port approvals and permits from applicable government agencies, including the San Francisco Bay Regional Water Quality Control Board, U.S. Army Corps of Engineers, National Oceanic and Atmospheric Administration - National Marine Fisheries Service, California Department of Fish and Wildlife, and the U.S. Fish and Wildlife Service special status species. The Pacific herring spawning or hatching season extends from December 1 – February 28; salmon and steelhead trout seasons extends from December 1 to June 1. Contractor shall comply with all construction regulations and construction mitigation requirements resulting from these specific spawning seasons. Coordination is considered incidental, and no compensation shall be paid for this coordination.
Project Description The baseline project is to remove the approximately 320 exposed piles adjacent to the Pier 50 Shed B south apron. There is one additive alternate which will be implemented if funding allows: Demolishing the entire Pier 60 structure.
Pier 50 South Apron Pile Removal – Baseline Project A red tagged portion of the south apron of Pier 50 fronting shed B (“South Apron”) poses safety hazards and has begun to collapse into the water. The Port is concerned that if left unaddressed, the failing portion of the South Apron could damage adjacent structurally sound areas of the apron. To mitigate this risk, the Port previously demolished the South Apron and severed it from adjacent occupiable portions of the South Apron. The apron removal project did not touch existing piles supporting the pier apron deck. For the Pier 50 Shed B Pile Removal Project, the Port intends to return to the site during the in-water work window to remove remnant piles that will be left exposed after decking fronting Shed B was removed. The project scope for the pile removal project involves removing and disposing of 320 14” wood piles. The scope involves in-water work. Piles will be removed at or below mudline using vibratory or direct pull methods or cutting piles at the mudline. The project will not result in any changes to use or intensity of use of the existing Pier 50 structure.
Scope of Work: Pier 50 South Apron Pile Removal
Remove approximately 320 exposed 14-inch diameter wood piles.
Existing piles to be removed at or below mudline using vibratory or direct pull or cutting at the mudline.
2018 bathy show mudline elevations range from 12 to 16 along Pier 50 South Apron.
Existing piles to be removed at or below mudline in areas where the decking has previously collapsed using vibratory extraction, direct pull or cutting at the mudline.
Pier 60 Demolition – Additive Alternate 1 This project will demolish and dispose of the entire Pier 60 structure including the pier apron and piles. Pier 60 is roughly 6,447 sq ft of pier deck located in China Basin immediately west of the 4th Street Bridge. The project will also remove remanent piles decking material from the seafloor in areas where the apron has previously collapsed. The structure has fallen into disrepair and has been red tagged as it is unsafe for human occupancy. The structure is composed of timber decking covered by asphaltic concrete and wood piles. Several wood piles are wrapped in concrete. A portion of the Pier 60 deck has fallen into the water. Hazardous materials (asbestos, lead paint) were discovered onsite and will need to be abated by a licensed professional before demolition begins.
Scope of Work: Pier 60 Demolition
Remove approximately 72 exposed 14-inch diameter wood piles.
Existing piles to be removed at or below mudline using vibratory or direct pull or cutting at the mudline.
2018 bathy show mudline elevations range from 12 to 16 along Pier 50 South Apron.
Existing piles to be removed at or below mudline in areas where the decking has previously collapsed using vibratory extraction, direct pull or cutting at the mudline.
For more information, contact the Project Manager, Paul Chasan at +1 (555) 000-0000.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS