Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on October 28, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Extend NCO Beach Boardwalk

Closed
FA481924R0020Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific performance area in Riverside or Los Angeles, focuses on basin improvements under NAICS code 236220. The solicitation was posted on October 19, 2026, with a response deadline of November 4, 2026. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation. To secure project financing, the Inland Empire Utilities Agency requires strict adherence to expanded DBE Good Faith Effort (GFE) guidelines. Bidders must provide proof of utilizing SBA and MBDA services and demonstrate that solicitations were posted in an online publication for 30 consecutive days and in a newspaper for at least one day prior to the bid opening. Failure to include this documentation within the bid package will result in the proposal being deemed non-responsive. While outreach documentation may be submitted up to three business days after the closing date, all other mandatory GFE requirements must be met by the opening date to ensure compliance.
RT CONTRACTOR CORP

POSTED

about 4 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located on the northeast end of Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation involving soil stabilization and utility relocation; construction of the plant including a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic system for invoicing and payments and are required to accept the standard Overaa agreement without modification. Key milestones include a mandatory pre-bid meeting on October 5, 2026, with bid submission deadlines listed as either October 28 or November 10, 2026.
C. Overaa & Co.

POSTED

about 4 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site work such as clearing, rock excavation, grading, and wetland mitigation, as well as the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building. Demolition of 18 existing magazines and buildings 524 and 393 is also required. Technical requirements encompass a wide range of trades including demolition, abatement, concrete, structural steel, roofing, electrical, plumbing, and mechanical systems. Specialized construction features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. The project also involves installing primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact the primary point of contact by the October 31, 2026, deadline to receive bid documents.
J & J Contractors, Inc

POSTED

about 4 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The contract involves a project to extend the Tyndall NCO Beach Boardwalk by 600 feet to mitigate negative impacts on the surrounding dune environment at Tyndall Air Force Base, Florida. The extension is designed to match the existing boardwalk design and will be constructed to comply with current building codes, including the DoD Building Code and Florida's High Velocity Hurricane Zone provisions. Notably, the construction will maintain the accessibility of the service road. The project is identified by solicitation number FA481924R0020 and is categorized under the NAICS code 236220, which pertains to commercial and institutional building construction. Three amendments have been made to the original contract. The first amendment revises sections on Past Experience, while the second includes As-Built Drawings. The third amendment extends the proposal submission deadline to August 15, 2024, and includes responses to pre-bid contractor queries. Tyndall Air Force Base has designated this project within a HUBZone set-aside to encourage participation from historically underutilized business zones. Interested parties are encouraged to contact primary and secondary points of contact, SSgt Benjamin Spear and Thomas Elliott, for further inquiries. The contract is actively soliciting bids, and the deadline for proposal submissions is set for August 15, 2024, at 2:00 PM CST.

General Info

Tyndall AFB boardwalk extension project, 600 feet, submission deadline August 15, 2024.

Contract Value

$722,775.1

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Tyndall AFB, FL, 32403, USA

Set-Aside

HZC

Award Issued Date

Documents

19

Appendix C - Example Schedule - NCO Beach Boardwalk XLWU25_4009

PDF, High priority: read this firstspecifications
High

Attachment 9 - Division Cost Estimate Worksheet (Repair Sewer Manholes)

XLSX, High priority: read this firstspecifications
High

FA4819-19-C-A0000 - Schedule of Material Submittals

XLSX, High priority: read this firstspecifications
High

FA481924R0020 Amendment 0001

PDF, High priority: read this firstamendment
High

FA481924R0020 Amendment 0002

PDF, High priority: read this firstamendment
High

FA481924R0020 Amendment 0003

PDF, High priority: read this firstamendment
High

FA481924R0020 - Extend Boardwalk at NCO Beach (Section L and M)

PDF, High priority: read this firstrfp
High

FA481924R0020 - Extend NCO Beach Boardwalk

PDF, High priority: read this firstifb
High

Project XLWU 25-4009: Extend Tyndall NCO Beach Boardwalk SOW

PDF, High priority: read this firstsow
High

Tyndall AFB Various Construction Projects - Final Environmental Assessment

PDF, High priority: read this firstspecifications
High

Tyndall Beach Boardwalk (B11300) Project Specifications

PDF, High priority: read this firstsow
High

Tyndall NCO Beach Boardwalk Extension - Q&A

XLSX, High priority: read this firstq-and-a
High

Wage Determination FL20240105 - Heavy Construction (Bay County, FL)

PDF, High priority: read this firstwage-determination
High

XLWU 25-4009 Appendix A - Additional Requirements

PDF, High priority: read this firstspecifications
High

XLWU 25-4009 Appendix D - Boardwalk As-Built Drawings

PDF, High priority: read this firstspecifications
High

XLWU 25-4009 - Extend Tyndall NCO Beach Boardwalk Concept Drawings

PDF, High priority: read this firstspecifications
High

Attachment 10: Proof of Financial Responsibility

PDF, Low priorityother
Low

FA4819-21-C-0041 RFI Template - Tyndall AFB Aircraft Rinse

PDF, Low priorityrfi
Low

Project XLWU21-4008 Base Access Request EAL

XLSX, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Aug 8, 2024 to Aug 15, 2024. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → DEPT OF THE AIR FORCE
Contacts2 people available
OfficeTYNDALL AFB, FL, 32403-5521, USA
Office AddressTYNDALL AFB, FL, 32403-5521, USA

Full Description

Show more

Additional Information- For the comment "SEE 332 Conservation Measures for Dune Walkover Construction #1 and #3" Civil Enginerring has provided this additional information:


Walkovers/Boardwalks. Dune walkovers shall be constructed at a height (minimum three feet above grade – higher if habitat has been impacted from storms) to accommodate natural dune growth and associated vegetation.


 Ammendment 3- The purpose of the amendment is to extend the proposal due date from 8 August 2024 at 2:00 PM CST to 15 August 2024 and 2:00 PM CST, and add the Pre-Bid Walk Contractor questions and answer for contractor review.


Amendment 2-  The purpose of this amendment is to add the AsBuilt Drawings and the 813.


Amendment 1- The purpose of this amendment is to revise Sections L and M as it refers to the definition of relevant work for Past Experience.


The purpose of the Tyndall Air Force Base (TAFB) project XLWU 25-4009 Extend the Tyndall NCO Beach Boardwalk by 600 feet to reduce negative impacts to the dune and surrounding environment caused by personnel accessing the beaches of Tyndall AFB. New construction will match existing boardwalk design, is to Design and Build to extend existing Boardwalk and its supporting facilities in full compliance with current building codes, including the DoD Building Code, and the portion of the Florida Building Code that contains the High Velocity Hurricane Zone (HVHZ) provisions. The service road is to remain open during the construction of the extension of the boardwalk. 


Please see the attachments for further information.

More opportunities from Department Of Defense → DEPT OF THE AIR FORCE

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS