Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Exterior Installation of Wayfinding Signs at the Convention Center & Bayfront Parking Garages

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

ACE Parking will install wayfinding signs for the San Diego Unified Port District at the Convention Center Parking Garage and the Bayfront Parking Garage in San Diego, California. The project includes one sign measuring approximately 43 feet 6 inches by 3 feet 9 inches at the Convention Center Parking Garage northwest entry/exit and six signs measuring approximately 11 feet 6 inches by 3 feet 10 inches at the Bayfront Parking Garage, with three signs on the first floor and three on the third floor. These signs will direct visitors to the San Diego Convention Center, Gaslamp Quarter, Petco Park, and the East Village. The installation will not include new lighting and will utilize hand tools and a scissor lift. Construction is scheduled for mid-2026 and is expected to take approximately three days. While no sidewalk or promenade closures are planned, the northwest entry/exit of the Convention Center Parking Garage will be closed for one day, with traffic rerouted to E Harbor Drive. The project is categorically exempt under CEQA Guidelines Sections 15301 and 15303 due to its limited scope and minimal environmental impact. ACE Parking is responsible for adhering to all federal, state, and local regulations concerning stormwater, hazardous materials, and construction demolition debris.

General Info

ACE Parking will install wayfinding signs at two San Diego garages in mid-2026.

Agency

California → San Diego Unified Port District

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego Unified Port District
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Diego Unified Port District
Office AddressN/A
Contacts
Erickson WilliamsRegional Director

Full Description

Show more
The proposed project would involve the installation of wayfinding signs by ACE Parking (Applicant) on behalf of the San Diego Unified Port District (District) at the Convention Center Parking Garage and Bayfront Parking Garage (adjacent to the Hiton Bayfront Hotel) in the city of San Diego, California. Work to specifically complete the proposed project would involve the installation of one (1) sign above the entry/exit point for the Convention Center Parking Garage and six (6) signs along the walking paths within the Bayfront Parking Garage to improve wayfinding abilities for visitors using the garage. The signs for the proposed project would not include any new lighting. Additional details for the proposed signs are as follows: • Convention Center Parking Garage o One (1) sign above the northwest entry/exit point of the garage measuring approximately 43’6” long x 3’9” wide to display wayfinding signage for the San Diego Convention Center. • Bayfront Parking Garage o Three (3) signs on the first floor and three (3) signs on the third floor each measuring approximately 11’6” long x 3’10” wide within the parking garage walkway adjacent to Park Boulevard. These signs would display wayfinding signage to Gaslamp Quarter, Petco Park, East Village, or similar adjacent locations. Construction of the proposed project is anticipated to occur in approximately mid-2026 and would take approximately three (3) days to complete with ongoing modifications, maintenance, and removal as needed. Equipment required for the proposed project would consist of hand tools and a scissor lift. No temporary closures are anticipated for the sidewalk or promenade adjacent to the project sites. At the Convention Center Parking Garage, there would be approximately one (1) day of closures for the northwest entry/exit point, so traffic would be rerouted to the main entrance along E Harbor Drive. Signage would be posted to notify parkers about the temporary closure. Due to its nature and limited scope, construction of the proposed project would generate a minor amount of vehicle trips and would require limited use of equipment. Therefore, impacts related to air quality, greenhouse gas emissions, and transportation and traffic are not anticipated to occur. Furthermore, the Applicant would be responsible for complying with all applicable federal, state, and local laws regarding construction demolition debris, hazards and hazardous materials, and stormwater.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS