Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on July 15, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

F-35 Renovate Permanent Party Dorm (B2662)

Closed
FA500419BA008Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, with a response deadline of November 4, 2026. The project falls under NAICS code 236220 and focuses on basin improvements within the Riverside or Los Angeles project areas. A critical component of this solicitation is strict adherence to six Good Faith Effort (GFE) requirements designed to ensure DBE participation and secure project financing. Bidders must provide proof of GFE #2, which requires posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for one day, as well as proof of GFE #5, involving the utilization of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to submit documentation for these two specific efforts within the bid package will result in the proposal being deemed non-responsive. Additionally, outreach documentation for GFE #1 may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 6 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located on the northeast end of Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation involving soil stabilization and utility relocation; construction of the plant including a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic system for invoicing and payments and are required to accept the standard Overaa agreement without modification. Key milestones include a mandatory pre-bid meeting on October 5, 2026, with bid submission deadlines listed as either October 28 or November 10, 2026.
C. Overaa & Co.

POSTED

about 6 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site work such as clearing, rock excavation, grading, and wetland mitigation, as well as the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building. Demolition of 18 existing magazines and buildings 524 and 393 is also required. Technical requirements encompass a wide range of trades including demolition, abatement, concrete, structural steel, roofing, electrical, plumbing, and mechanical systems. Specialized construction features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. The project also involves installing primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact the primary point of contact by the October 31, 2026, deadline to receive bid documents.
J & J Contractors, Inc

POSTED

about 6 hours ago

DEADLINE

in 10 days

General Info

Contract Value

$0

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

2310 Central Ave, Bldg 2258, EIELSON AFB, AK, 99702, USA

Set-Aside

NONE

Award Issued Date

Documents

17

FA500419BA008 Amendment 0002

PDF, High priority: read this firstamendment
High

General Decision Number AK190001 - Alaska Wage Determination

PDF, High priority: read this first15 pages · wage-determination
High

FA500419BA0080001.pdf

PDF

FA500419BA0080001_SF_30.pdf

PDF

JA-1_Synopsis_of_Work.pdf

PDF

JA-2_Drawings_pt1.pdf

PDF

JA-3_Drawings_pt2.pdf

PDF

JA-4_Submittal_Register.pdf

PDF

JA-5_Specifications.pdf

PDF

JA-6_Wage_Determination%2814_June_2019%29.pdf

PDF

JA-7_Bid_Schedule.pdf

PDF

MFR_for_FBO.pdf

PDF

Perm_Party_Dorm_Q%26As.pdf

PDF

Solicitation_Amendment_FA500419BA0080003_SF30.pdf

PDF

Solicitation_Amendment_-_FA500419BA0080004.pdf

PDF

Solicitation_Amendment_FA500419BA0080004_SF_30.pdf

PDF

Solicitation_-_FA500419BA008.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Combined Synopsis

Notice updated

Response deadline changed from May 30, 2019 to Jun 20, 2019. The notice description changed.

Notice updated

Response deadline changed from Jun 20, 2019 to Jul 2, 2019. The notice description changed.

Notice updated

Response deadline changed from Jul 2, 2019 to Jul 26, 2019. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA5004 354 Cons Pk
Contacts2 people available
OfficeEIELSON AFB, AK, 99702-2200, USA
Office AddressEIELSON AFB, AK, 99702-2200, USA
Contacts
Ashton SmithContract Specialist
James J. KotContracting Officer

Full Description

Show more
---ELECTRONIC BIDS WILL NOT BE ACCEPTED--- "Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date for receipt of proposals. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs." The purpose of this project is to renovate and repair Building 2262 to house permanent party airmen associated with the beddown of the F-35A fighter aircraft. Work shall include architectural, structural, mechanical, electrical, communications and security upgrades, as well as hazardous material abatement. All work is to be done at Eielson AFB, Alaska. The Government is contemplating a Firm Fixed Price (FFP) Sealed Bid contract. IAW FAR 36.204(g): The estimated magnitude is between $5,000,000 and $10,000,000 This posting is an Invitation for Bids. BIDS MUST BE VALID UNTIL 31 DECEMBER 2019 AND THE BID GUARANTEE IS WAIVED FOR THIS PROJECT. Respondees are advised that the Government will not pay for any information or administrative costs incurred in response to this solicitation; all costs associated with responding to this solicitation will be solely at the interested party's expense. Not responding to this solicitation does not preclude participation in any future IFB, if one is issued. It is the responsibility of the potential offerors to monitor this site for additional information pertaining to this requirement. The due date and time for submission of bids is contained in the solicitation package. Paper copies will NOT be available. The entire solicitation, including the specification and/or drawings, are available only on the Federal Business Opportunities Web Site at: https://www.fbo.gov/ All contractors MUST be registered in the System for Award Management (SAM) at: https://www.sam.gov/ SITE VIST: -A site visit (pre-bid/pre-proposal conference) will be conducted on 10 May 2019 at 14:00 hrs (02:00PM) AKDT. For attendance, please contact members listed below no later than 7 May 2019 before 14:00 hrs (4:00 PM) AKDT. -Questions should be submitted electronically via email to contacts listed below no later than 14 May 2019 at 14:00 hrs (02:00pm) AKDT. No questions will be taken over the phone. -Bid opening will be 29 May 2019 at 14:00 (2:00pm) AKDT. Points of Contact for this solicitation are: - Primary: SrA Ashton Smith,Email: ashton.smith.4@us.af.mil - Alternate: SSgt Zachary Finley,Email:zachary.finley.3@us.af.mil - Contracing Officer - TSgt James Kot,Email: james.kot@us.af.mil ---ELECTRONIC BIDS WILL NOT BE ACCEPTED---

More opportunities from Department Of Defense → FA5004 354 Cons Pk

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS