F--"EO14398" Watershed Analysis Risk Management Framework (WARMF) Model Salinity Forecast development and maintenance services

Awarded
140R2026Q0065Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract awards services for the development and maintenance of the San Joaquin River Watershed Analysis Risk Management Framework (WARMF) Model to enhance salinity forecasting capabilities for the Bureau of Reclamation’s Mid-Pacific Regional Office in Sacramento, California. The Work involves updating the WARMF model to version 7.2, resolving memory consumption issues, implementing automated data quality controls for electrical conductivity and flow data, and developing enhanced self-calibration utilities with full source code and technical documentation. Deliverables must be submitted on time at a 98% rate, with penalties applied for non-compliance, and acceptance occurs at the designated delivery location following inspection by the Contracting Officer’s Representative. The performance period runs from August 1, 2026, through December 31, 2027, with an option to extend services for up to six additional months under the same terms. All work is performed under a Firm Fixed Price structure, though the exact contract value remains unlisted; invoicing is mandatory through the U.S. Department of the Treasury’s Invoice Processing Platform, and payment will be processed electronically. Personnel must hold valid U.S. government-issued Personal Identity Verification (PIV) credentials and comply with strict security protocols outlined in the Bureau of Reclamation’s WBR 1452.237-80 clause, including restrictions on handling Controlled Unclassified Information and FOR OFFICIAL USE ONLY data, prohibition of unauthorized access to systems, and mandatory reporting of security incidents. Only U.S. citizens or foreign nationals legally admitted to the U.S. may perform work, requiring submission of passport and visa documentation at least 14 days prior to access. Subcontractors are bound by the same security obligations, and all data, tools, and documentation must be delivered in a fully reproducible format for long-term government use. The award is based on best value through a trade-off process, not lowest price, and the solicitation incorporated deviations from standard FAR clauses, notably FAR 52.212-4, indicating tailored commercial item terms. The prime contractor is responsible for full compliance with whistleblower protections, executive compensation reporting, small business subcontractor payment acceleration, and System for Award Management maintenance, with no socioeconomic certifications or size status affirmed by the offeror. All deliveries are FOB Destination, and access to facilities requires visible ID wear and prompt reporting of lost or damaged credentials, with potential charges of up to $500 per incident for replacement costs.

General Info

Sole source contract for San Juan River salinity forecast using WARMF, issued by DOI Sacramento.

Agency

Department Of The Interior → Mp-Regional OfficeView Agency

Contract Value

$112,218.4

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

CA

Set-Aside

NONE

Awardee

SYSTECH WATER RESOURSES, INC.View Profile

Award Issued Date

Documents

(1)

Solicitation 140R2026Q0065 for San Juan River Salinity Forecast WARMF Program

PDFrfq

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Mp-Regional Office
Contacts1 person available
OfficeSACRAMENTO, CA, 95825, USA
Organization / Agency
Department Of The Interior → Mp-Regional Office
View Agency Profile
Office AddressSACRAMENTO, CA, 95825, USA

Full Description

Show more
"EO14398" Watershed Analysis Risk Management Framework (WARMF) Model Salinity Forecast development and maintenance services

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
Monroe Area Recharge Project
Solicitation # RFP-2026-0001
The Lower Loup Natural Resources District is seeking a qualified professional engineering consultant for the Monroe Area Recharge Project in southwestern Platte County, Nebraska. The project aims to design and implement a system to divert water from the Loup Power Canal into identified wetlands and drainages to facilitate groundwater recharge and baseflow retiming. The scope of work includes an existing conditions assessment, site identification and prioritization, conceptual and final design, permitting support, and the development of a final hydrologic modeling report and an operations and maintenance plan. All designs must adhere to Federal Energy Regulatory Commission requirements, including specific mandates for minimum flow in bypass reaches, run-of-canal operations, water temperature limits of 93 degrees Fahrenheit, and a maximum diversion of 2,000 cfs between March 1 and June 30. Proposals are due by 5:00 pm on October 2, 2026, and must consist of four hard copies and one digital version delivered to the district office in Ord, Nebraska. Selection will be based on technical qualifications, a proven track record with similar water retiming projects, the proposed approach, and cost effectiveness. Work is scheduled to commence by December 1, 2026, with a timeline to be mutually agreed upon following the award. The contract requires the consultant to be fully insured for general liability and workers compensation. Payment will be processed on a monthly basis, subject to a 10 percent retainage that will be released upon project completion.
Lower Loup Natural Resources District

POSTED

about 18 hours ago

DEADLINE

in 20 days
View Details

More opportunities from Department Of The Interior → Mp-Regional Office

Same awarding agency

NAICS: 237990
New
Federal
Z--Mendota Pool Bypass and Reach 2B Improvements
Solicitation # 140R2026R0020
The Bureau of Reclamation, under the San Joaquin River Restoration Program and the San Joaquin River Restoration Settlement Act, is seeking industry input via Request for Information 140R2026R0020 for the Mendota Pool Bypass and Reach 2B Improvements. This large-scale civil works project in California is estimated to have a magnitude between 225 million and 300 million dollars. The primary objective is to construct channel and structural improvements to ensure a conveyance of at least 4,500 cfs from Reach 2B downstream to Reach 3. The project is divided into two phases: Phase 1 focuses on the Mendota Pool Bypass Channel to provide passage for Chinook salmon, including the construction of a control structure, fish ladder, and auxiliary water supply, with a goal of being operational by spring 2030. Phase 2 involves replacing intake locations in Reach 2B with a headworks structure, canal, and siphon or pipeline to maintain water delivery to the Columbia Mowry Delivery System. The government aims to begin construction on the channel and levee in 2027 and is currently evaluating the most effective delivery method, considering design-bid-build, design-build, or a hybrid approach. The project must comply with several environmental mandates, including the National Environmental Policy Act, the Clean Water Act, the Endangered Species Act, and the National Historic Preservation Act, and will require a Project Labor Agreement. As this is currently an RFI for market research and planning, the agency is soliciting feedback on risk allocation, constructability, and schedule estimates. Interested parties must execute a Federal Non-Disclosure Agreement to access detailed geotechnical reports, design drawings, and specifications. The primary point of contact for this effort is Stephanie Lindner.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in 4 days
View Details
NAICS: 237990
Federal
Z--Folsom Warehouse Bridge Crane Replacement
Solicitation # 140R2026R0017
Solicitation 140R2026R0017 is a firm-fixed-price, one-phase design-build construction contract issued by the U.S. Department of the Interior, Bureau of Reclamation, for the replacement of a 30-ton bridge crane at the Folsom Dam Warehouse in Sacramento County, California. The project is exclusively set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under FAR 19.14, with an estimated value between 1 million and 5 million dollars. The scope of work encompasses the removal and disposal of the existing crane, including the handling of asbestos and other hazardous materials, the design and installation of a new 30-ton bridge crane, power supply installation, rail system survey and optional repairs, and final commissioning, load testing, and operator training. The contractor must begin performance within 7 calendar days of the notice to proceed and complete all work, including final cleanup, within 600 calendar days. The procurement process utilizes FAR Part 15 negotiation procedures, with award based on the most advantageous proposal to the government. Evaluation is weighted heavily toward non-price factors, specifically the technical approach, past performance within the last six years, and the qualifications of key personnel, including a qualified crane inspector. Proposals must be submitted in three distinct volumes: Business, Technical, and Pricing. The contract includes strict quality assurance requirements, including Factory Acceptance Testing (FAT) for PLCs and VFDs and adherence to various NEMA, IEEE, and UL standards. Performance is subject to liquidated damages of 2,900 dollars per calendar day of delay, and the contractor is required to provide performance and payment bonds.
Other Heavy and Civil Engineering Construction

POSTED

9 days ago

DEADLINE

in 26 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS