Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity was posted on July 17, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

F--Remove all trees 6 inches and larger in diameter from the south face (lake side) of the Saylorville Lake Barrier Dam

Awarded
W912EK-09-T-0070Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561730
New
SLED
FAC 120 - Firebreak Maintenance and Hazard Tree Removal in Nickserson State Park FY27
Solicitation # BD-27-1020-DCRFC-DC366-134921
The Massachusetts Department of Conservation and Recreation is soliciting bids for firebreak maintenance and hazard tree removal at Nickerson State Park for fiscal year 2027. The scope of work is divided into two primary tasks: the maintenance of the firebreak along Ober Road through tree removal, mulching, and mowing, and the mitigation of hazard trees throughout the park's campgrounds, internal roads, and bike paths. All work must comply with OSD Statewide Contract FAC 120, and the contractor is required to ensure that tree stumps protrude no more than two inches from the ground. Qualified bidders must provide a completed Bidder Response Form, three relevant references, and certified insurance policies for all subcontractors. Evaluation is based on the best value to the Commonwealth, considering price, equipment, safety programs, and the qualifications of onsite staff. Key requirements include a superintendent with a valid Massachusetts Certified Arborist or International Society of Arboriculture certification and machine operators holding a current Massachusetts Timber Harvester License. All equipment must meet ANSI specifications and current safety inspections. The project is subject to Department of Labor Standards Prevailing Wage Rates. Work must be performed Monday through Friday between 7:00 am and 6:00 pm, commencing within ten business days of the Notice to Proceed. Responses are due by 4:00 PM on November 17, 2026. Bidders may apply for a single task or both, though the agency reserves the right to award tasks separately. The primary point of contact for the solicitation is Casey Duggan, with Paul Gregory serving as the task manager for firebreak maintenance.
Department of Conservation and Recreation

POSTED

about 5 hours ago

DEADLINE

in 19 days
NAICS: 561730
New
SLED
SNOW PLOWING AND/OR HEAVY DUTY SNOW REMOVAL WITH WHEEL LOADERS 2026-2027
Solicitation # 8968
The City of Waterbury is soliciting qualifications from multiple operators to provide citywide snow removal services for the 2026-2027 fiscal year. The scope of work is divided into two primary categories: snow plowing and sanding of city roads, and heavy duty trucking and snow removal utilizing wheel loaders. Services must be available from November 1, 2026, through April 30, 2027, under the direction of the Public Works Department and the Bureau of Streets. All equipment must undergo city inspection by November 20, 2026, to ensure it meets minimum standards. Plowing equipment is categorized by gross vehicle weight ranging from light duty (11,500 to 19,500 lbs) to heavy duty (33,001 lbs or greater), with established hourly rates between 90 and 250 dollars depending on the equipment type and service provided. The selection process involves a two-stage approach consisting of short-listing based on technical and managerial capabilities, equipment quality, and prior performance, followed by interviews and negotiations. Awarding is at the sole discretion of the City. Successful vendors must comply with the Federal Davis-Bacon Act, the American Recovery and Reinvestment Act of 2009, and HUD Section 3 clauses. Additionally, vendors must obtain approval from the City Risk Manager for all insurance before commencing operations and are required to use city-issued magnetic plates on all vehicles. Responses were due by November 13, 2026, and required the submission of a vendor qualification statement, vehicle information sheets, and a non-collusive affidavit.
DAS Procurement

POSTED

about 6 hours ago

DEADLINE

in 15 days
NAICS: 561730
New
SLED
Santa Cruz Gateway Landscape Improvements
Solicitation # ED-0330
The City of Santa Cruz, through the Office of Economic Development and Housing, is soliciting bids for the Santa Cruz Gateway Landscape Improvements project located at Ocean Street and Plymouth Street. This public works project involves a comprehensive scope of work including demolition, site and soil preparation, irrigation installation using 2-inch Schedule 40 PVC, planting, concrete work, lighting, and low-voltage electrical work. The contract will be awarded to the lowest responsive and responsible bidder on a firm-fixed fee basis, with a required project completion timeline of 45 working days. Bids must be submitted electronically via the OpenGov portal, with the final deadline extended to November 5, 2026, at 5:00 pm. Qualified contractors must possess a Prime B license and comply with various regulatory requirements, including the Living Wage Ordinance, Equal Employment Opportunity regulations, and DIR registration for prevailing wage compliance. Bidders are required to provide a bid security of at least 10 percent of the bid amount, and the successful awardee must provide a 100 percent performance bond and a payment bond of at least 50 percent if the contract is under 1 million dollars. Evaluation factors include the complete submission of the bid form and available local business preferences, offering a 2 percent preference for businesses with a local office and an additional 4 percent for those with local ownership. All work must adhere to the City's 2002 Standard Specifications, 2025 Standard Details, and applicable ADA and ABA accessibility standards.
Economic Development and Housing

POSTED

about 10 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

This contract requires the removal and disposal of driftwood logs exceeding six inches in diameter from the south face of the Saylorville Lake Barrier Dam near Polk City, Iowa. The contractor must carefully extract logs from the rip rap surface to avoid damage, replacing any displaced rock at their own expense. Once removed, the logs must be hauled to the Sandpiper Recreation Area for chipping. Additionally, the contractor is tasked with flush cutting and removing all trees in a small grove on the west side of the dam, with the exception of government-marked Pin Oaks. The project must be completed within thirty days of the contract award, with work permitted Monday through Friday from 7 am to 5 pm. Specific timelines dictate that driftwood removal from the rip rap be finished within five working days, and chipping completed within two weeks following removal. Access to the site is limited to the Neal Smith Bike Trail, and the contractor may utilize chainsaws for handling larger debris. Extensions for inclement weather may be granted by the government.

General Info

Agency

N/A

Contract Value

$9,000

NAICS

561730 - Landscaping Services

Place of Performance

US Army Engineer District, Rock Island P.O. Box 2004, Clock Tower Building, Attn: CEMVR-CT Rock Island IL 61204-2004 US, IA, USA

Set-Aside

SBA

Awardee

LAWNPRO LC

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jul 28, 2009 to Jul 29, 2009. The notice description changed. The point of contact changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts

Full Description

Show more
The flood of 2008 deposited large quantities of driftwood on the face of the Saylorville Lake Barrier Dam. The Barrier Dam is located off of highway 415 adjacent to the Saylorville Marina and approximately 1.5 miles south of Polk City, IA. Contractor will be responsible for the removal and disposal of all logs on the dam over 6in in diameter (measured exceeding anywhere on the log length). Access to the driftwood is only available from the Neal Smith Bike Trail located at the foot of the dam. Care in removal is needed to insure no damage is done to the rip rap surface of the dam. Any damage or displacement of rip rap shall be replaced by the contractor at their expense. Once driftwood logs are removed from the face of the dam they are to be hauled to a designated dump site where they are to be chipped. Work will consist of walking up and down large rip-rap rock on face of dam. Trees will be pulled/lifted from the face of the dam to the bottom of the dam with minimal movement of rip rap. Chainsaw work may be required to cut larger pieces of driftwood for ease of handling and hauling. Any rip-rap that is moved in the process needs to be put back into its original position. Once the trees/logs have been removed from the face of the dam the contractor will be required to haul trees to Sandpiper Recreation Area (1.1 mile) for them to be chipped. The dump location is a flat, level, open terrain for ease of dumping and chipping. On the west side of the barrier dam between the bike trail and the dam is a small grove of trees which need to be removed. Trees need to flush cut to the ground. All trees in the area need to be taken out except for the Pin Oak. Pin Oak trees will be marked by the Government with orange paint. Contractor shall use extreme care not to damage the Pin Oak trees. Work for this contract is to be completed thirty (30) days after contract award. Work days are Monday through Friday between the hours of 7 am and 5 pm. No work will be permitted on weekends or holidays. Five working days will be allowed to remove the driftwood from the rip rap. Chipping of the driftwood will be completed within two weeks of driftwood removal from the dam. Inclement weather may inhibit safe work and if so, the Government will allow for additional work days.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS