This Sources Sought opportunity from Department Of Defense was posted on June 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
FA4626-26-Vehicle Post Lifts
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract calls for the procurement and installation of two new two-post vehicle lifts, each with a minimum capacity of 30,000 pounds, at Malmstrom Air Force Base in Montana. The vendor must be ALI GOLD certified and is responsible for the complete removal of existing legacy lifts, full installation, leveling, and operational testing of the new lifts. The vendor is also required to provide a sustainment plan detailing how service and repair needs will be met within a 24 to 72-hour timeframe by an appropriate vendor. Warranty requirements include a minimum 25-year coverage on structural components, a 2-year warranty on hydraulic parts, and a lifetime warranty on carriage bearings. This contract is a total small business set-aside under NAICS code 333310 and is managed by the Department of Defense’s FA4626 341 Cons Lgc office. Interested vendors must respond by June 12, 2026, and points of contact for the solicitation are William Perry and Karen V. Broughton.
General Info
Agency
NAICS
Place of Performance
Malmstrom AFB, MT, 59402, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Vendor must provide two (2) new two-post lifts with all associated components required and including old lift removal & lift installation, with a minimum lift capacity of 30,000 lbs. Vendor must be ALI GOLD certified. Must be able to be serviced/repaired by a vendor within 24-72 hours. Must include a minimum 25-year warranty on structural components, 2-year on hydraulic components, and a lifetime warranty on carriage bearings. The Contractor must fully dismantle and remove the existing legacy lifts from the facility and complete the full installation, leveling, and operational testing of the newly procured lifts and provide a sustainment plan detailing how Contractor will meet service requirements.
