Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Energy was posted on May 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fabrication of SR BPM Cable Support Brackets

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 332510
New
DIBBS
FASTENER SNAP ASSEM
Solicitation # SPE4A6-26-T-26RJ
Solicitation SPE4A6-26-T-26RJ, issued by the DLA Aviation ASC Commodities Division, is for the procurement of 45 units of Fastener Snap Assemblies under NSN 5325-01-191-3418. Each assembly is a commercial item consisting of one metallic eyelet (P/N MS27980-8B), one cap snap fastener (P/N MS27980-2B), one stud snap fastener (P/N MS27980-7B), and one socket snap fastener (P/N AN227-7B). The hardware must be manufactured to the current revision of the defining military part standard, specifically referencing Technical Data Package BASIC UNK AN227 Revision 9 dated February 14, 2019. Delivery is required within 20 days after receipt of order to a consignee in Spangdahlem, Germany, with inspection and acceptance occurring at the destination. The contract mandates strict quality and packaging standards, including compliance with MIL-STD-2073-1E for packaging and MIL-STD-129 for marking. Quality assurance requires zero-based sampling plans per MIL-STD-1916 or ASQ H1331, with specific AQLs for critical, major, and minor attributes. Key regulatory requirements include the Buy American Act, the Berry Amendment, and DFARS 252.204-7012 for safeguarding covered defense information. Payment must be processed electronically through the Wide Area WorkFlow system. The solicitation allows for a price evaluation preference for certified HUBZone Small Business Concerns and explicitly prohibits the use of additive manufacturing for the produced items.
ASC COMMODITIES DIVISION

POSTED

1 day ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The contract involves the fabrication of 207 SR BPM Cable Support Brackets in accordance with drawing AL-1856-3588B. The scope of work includes detailed manufacturing processes such as tap hole inspection, verification of thread quality, and packaging with bagging and tagging, all compliant with the SAE AS478-35D standard. This subcontract is issued by Berkeley National Labor under the Department of Energy and pertains to a manufacturing NAICS code 332510, emphasizing metal fabricating activities. The place of performance is specified as Berkeley, with a response deadline set for May 26, 2026. The contract requires precise adherence to quality control measures to ensure the components meet stringent technical specifications. It is part of a procurement process aimed at supporting DOE operations through reliable subcontractor engagement for specialized fabrication work.

General Info

Fabrication of 207 SR BPM Cable Brackets in Berkeley, meeting SAE AS478-35D standards.

Agency

Department Of Energy → Berkeley National Labor - DOE ContractorView Agency

NAICS

332510 - Hardware ManufacturingView NAICS

Place of Performance

Berkeley, CA, 94720, USA

Set-Aside

NONE

Documents

This scope was carved out of AM202604-13.

The full solicitation package (24 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

ALS-U BPM Jumper Cables - Brackets

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Berkeley National Labor - DOE Contractor
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Energy → Berkeley National Labor - DOE Contractor
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Manufacture 207 units of SR BPM Cable Support Brackets per drawing AL-1856-3588B, including tap hole inspection, thread quality verification, and bagging/tagging per SAE AS478-35D.

More opportunities from Department Of Energy → Berkeley National Labor - DOE Contractor

Same awarding agency

NAICS: 334516
New
Federal
Beamline 4.3.1 Monochromator system
Solicitation # JG-0909-26
Lawrence Berkeley National Laboratory is issuing a Request for Information under solicitation JG-0909-26 to identify potential providers for a high-stability X-ray monochromator system for Beamline 4.3.1 at the Advanced Light Source. The system is intended to support a broad scientific program in small- and wide-angle X-ray scattering, with optimized performance required at 10 keV and 17 keV. Key technical requirements include a double-multilayer monochromator baseline with an energy bandwidth of approximately 1 percent, a Si(111) crystal monochromator for higher resolution over 10 to 17 keV, and the integration of cryo-cooling for the first multilayer to manage thermal distortions. The system must also comply with strict facility vacuum, space, and radiation safety standards. This is a presolicitation effort to gather data on technical feasibility, budgetary costs, and delivery schedules, with a project magnitude estimated between 500,000 and 600,000 dollars. Interested respondents must complete the RFI form sections 1 through 5 by October 16, 2026. The anticipated timeline includes a formal Request for Proposal in winter-spring 2027, with final system delivery expected by December 2028. Evaluation of responses will focus on achievable performance, system complexity, and the ability to conduct comprehensive Factory Acceptance Testing regarding optical, mechanical, and environmental stability prior to delivery and commissioning at the Berkeley, California facility.
Analytical Laboratory Instrument Manufacturing

POSTED

3 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS