Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on August 30, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fabrication of Vertical Lift Gates, Montgomery Locks and Dam

Awarded
W911WN18B8002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 332312
New
Federal
Debris Boom Supply and Install at Harry S. Truman Lake Project
Solicitation # W912DQ26QA080
Solicitation W912DQ26QA080 is a full and open, unrestricted competition for the design, fabrication, delivery, and optional installation of a debris boom system at Harry S. Truman Dam near Warsaw, Missouri. The primary objective of the approximately 2,000-foot boom is to protect the dam's tainter gates from floating debris to maintain spillway operational capacity and serve as a visual barrier for boaters. The system must be USA-made, utilizing domestic materials for all load-bearing components, and must be engineered to withstand specific hydraulic, wind, and wave conditions, including a minimum safety factor of 2.0 and the impact of a 100-foot log. A critical technical constraint prohibits any drilling into, on, or under the earthen dam. The contract is structured with three base CLINs covering design and fabrication, and one option CLIN for installation. Key deliverables include preliminary loading assumptions and drawings within 60 days of award, final professional engineer-stamped specifications and an O&M manual within 120 days, and on-site delivery within 240 to 300 days. Award will be based on the most advantageous offer, evaluating price, relevant experience, and past performance. Quotes must be submitted in PDF format to the designated points of contact by the revised deadline of November 2, 2026, and must include a completed SF 1449, pricing, and the required experience and past performance documentation.
W071 Endist Kansas City

POSTED

about 8 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The Pittsburgh District of the U.S. Army Corps of Engineers requires the fabrication and delivery of two Vertical Lift Gates and associated machinery support beam pedestals for the Montgomery Locks and Dam in Pennsylvania. Each gate, weighing approximately 130 tons, consists of a central leaf section and two end truck sections constructed primarily from ASTM A992 and A709 Grade 50 steel, with various stainless steel components. The scope of work includes the fabrication of idler sprockets, drive sprockets, and chains, as well as the development of detailed shop drawings. All welded joints must adhere to AWS D1.5 standards and undergo thermal stress relief and non-destructive testing before metalizing and painting. The selected contractor must hold several critical certifications, including AISC Quality Certification for Major Steel Bridges, AISC Bridge Fabricator certification, and specific Sophisticated Paint Endorsements. Additionally, AWS Certified Welding Inspector and Fracture Critical Endorsement certifications are required, along with proven experience handling structures exceeding 100 tons. The completed gate leaves must be delivered in one piece via barge to PEWARS on Neville Island, with all components for each gate delivered simultaneously. This procurement is designated as a 100 percent small business set-aside under NAICS code 332312.

General Info

Contract Value

$5,074,551

NAICS

332312 - Fabricated Structural Metal Manufacturing

Place of Performance

Pittsburgh Engineer Warehouse and Repair Shops (PEWARS) 3500 Grand Avenue, PITTSBURGH, PA, 15225-1584, USA

Set-Aside

NONE

Award Issued Date

Documents

8

Attachment_1_-_Specifications.pdf

PDF

Attachment_2_-_Contract_Drawings.pdf

PDF

Attachment_3_-_Reference_Drawings.pdf

PDF

Bid_Opening_Contractor_Attendance.doc

DOC

BidResults.doc

DOC

W911WN18B8002_0001.pdf

PDF

W911WN18B8002_0002.pdf

PDF

W911WN18B8002.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseAwarded
Posted

Sources Sought

Type Changed

Sources Sought → Presolicitation

Notice updated

Response deadline added: Jul 10, 2018. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Pittsburgh
Contacts1 person available
OfficePITTSBURGH, PA, 15222-4198, USA
Office AddressPITTSBURGH, PA, 15222-4198, USA
Contacts
Matthew W. ReedContract Specialist

Full Description

Show more
This is a Sources Sought Announcement only. This is not a Request for Proposal/Bid/Quotation and neither specifications nor drawings are available at this time. No solicitation is currently available. This request does not obligate the Government in any contract award. The Government will not pay for the provision of any information, nor will it compensate any respondents for the development of such information. Response to this notice is strictly voluntary and will not affect any vendor's ability to submit a proposal if and when a solicitation is issued. The purpose of this Sources Sought is to survey the market and gain knowledge of potential interested contractors for completing the work effort relative to the Montgomery Gate Fabrication; NAICS 332312 Fabricated Structural Metal Manufacturing. The Small Business Size Standard is 500 employees. Estimated Magnitude of Construction: Between $1,000,000 and $5,000,000. SCOPE OF WORK SUMMARY The US Army Corps of Engineers is soliciting for the Fabrication and Delivery of two Vertical Lift Gates for The Montgomery Locks and Dam located approximately 31.7 miles downstream from the Point at Pittsburgh, Pennsylvania. Fabrication of the lift gates includes idler sprockets, drive sprockets, and chains for each gate fabricated. The contract also covers fabrication and delivery of machinery support beam pedestals for the existing operating equipment for each gate that is fabricated. Installation will be performed separately from this project. The gates and machinery pedestals will be constructed using various sizes of steel shapes and steel plate. The majority of the steel items will conform to ASTM A992 Grade 50 and ASTM A709/A709M Grade 50F. In addition, there are several stainless steel items including pins, roller and wheel components, and seal plates. Connections will be accomplished by a combination of welding and bolting. All welded joints are welded in accordance with AWS D1.5 and are to be tested by applicable non-destructive testing (ultrasonic, magnetic particle, and visual). After fabrication and before cleaning, metalizing and painting the gates will be thermally stressed relieved in accordance with AWS D1.5. The gate is comprised of a central leaf section and two end truck sections. The leaf section is a three dimensional welded truss system with a front skin plate. The leaf is approximately 14 feet high by 12 feet wide by 100 feet long. The end trucks are plate weldments approximately 14 feet high, 6 feet wide and 4 feet deep with an attached wheel assembly. The gate is metalized and painted, has access platforms and ladders, and weighs approximately 130 tons. The gate leaf and trucks will be shop assembled for inspection, then disassembled and shipped. The gate leaf is to be delivered in one piece; field assembly will not be accepted. The machinery pedestals are built-up sections comprised of wide flange sections and plates and are approximately two feet wide by 4 feet long by 6 feet high. Components of the gate include the framing, skin plate, diaphragms, diagonals and gussets, fenders, seals, wheels, rollers, grease systems, miscellaneous machined parts, walkway framing, grating, handrails, and associated accessories. The contractor will be responsible to develop and submit detailed shop drawings for review and approval. Contractor must have the following certifications: 1. AISC Quality Certification Program, Major Steel Bridges (CBR) 2. AISC Certified Bridge Fabricator a. AISC Certified Bridge Fabricator - Intermediate (IBR) OR b. AISC Certified Bridge Fabricator - Advanced (ABR) 3. Sophisticated Paint Endorsement a. Sophisticated Paint Endorsement - Enclosed (SPE-P1) OR b. Sophisticated Paint Endorsement - Covered (SPE-P2) OR c. Society for Protective Coatings (SSPC) - SSPC QP3 4. Sophisticated Paint Endorsement (only if painting will be onsite in the field) a. Sophisticated Paint Endorsement - Covered (SPE-P2) OR b. Society for Protective Coatings (SSPC) - SSPC QP1 5. AISC Fracture Critical Endorsement (FCE) a. AWS D1.5 Certified Welder (CW) Certification OR b. Certified Welding Fabricator (CWF) Certification 6. AWS Certified Welding Inspector a. AWS Certified Welding Inspector (CWI) Certification OR b. AWS Senior Certified Welding Inspector (SCWI) Certification Additionally, the contractor must be able to demonstrate past experience with large structure handling. Large structures are defined as 100 ton or greater with lengths ranging from 50' to 110', depths and heights of 1' or more. The contractor is to deliver the leaf, end trucks, chains and pedestals for each gate at the same time. Delivery will be to PEWARS on Neville Island in the Ohio River downstream from the Point at Pittsburgh via barge. The gates will be off loaded by the Government using Government supplied cranes. The project completion date is set at approximately 730 calendar days after receipt of the Notice to Proceed (NTP). The contractor will be required to provide Performance and Payment bonds. The official solicitation is anticipated to be issued in March or April of 2017. Results of this sources-sought announcement will be used, in part, to determine the feasibility if a small business or lower tier socio-economic set-aside for this project and to determine if the Rule of 2 is met for any particular category of small business. All qualified contractors are encouraged to respond; a lack of responses may jeopardize the project being set aside for small business. Contractor responses to this Sources Sought shall be limited to 8 pages and shall include the following information: 1. Contractor's name, address, point of contact, phone number, and e-mail address and website (if any). 2. Contractor's business size designation and socio-economic sector (eg. Large, Small, 8(a), HUBZone, Service Disabled Veteran Owned, etc). 3. Commercial and Government Entity (CAGE) Code and DUNS Number. If a member of a joint-venture or mentor-prot'g agreement with the Small Business Administration (SBA), please provide information on both members of the joint-venture. 4. Confirmation of the Contractor's ability to perform at least 15% of the effort with its own personnel. 5. Company's interest in bidding on the solicitation once it's issued. 6. Company's capability to meet the requirements including specific equipment and experience with the type of work (magnitude and complexity) of the work described in this sources sought announcement. Include a statement detailing any special qualifications and certifications, applicable to the scope of this project, held by your firm and/or in-house personnel. If a member of a joint-venture, the respondent should include relevant information from both members of the joint-venture. 7. A statement or list of your firm's current or past technical experience (within the past five years) similar or the same as the summary scope of work and construction magnitude. Include a brief description of the project, customer name, and timeliness of performance, customer satisfaction, and dollar value of project. If a member of a joint-venture, the respondent(s) should include relevant information from both members of the joint-venture. 8. A statement on your firm's bonding capacity, both aggregate and single contract. Submit this information to Mr. Matthew Reed, Contract Specialist, via email to contact@example.gov. Your response to this Sources Sought notice must be received by 1:00 PM EST on January 10, 2018. As a reminder, this Announcement should not be construed in any manner to be an obligation to issue a contract, or result in any claim for reimbursement of costs for any effort you expend in responding to this request. No solicitation is currently available. Any future solicitation package will be made available on the Federal Business Opportunities (FBO) website https://www.fbo.gov. Interested parties are solely responsible for monitoring the FBO website for the release of a solicitation package and/or any updates/amendments. Search Keyword "W911WN" to obtain a complete listing of all Pittsburgh District US Army Corps of Engineers opportunities.

More opportunities from Department Of Defense → W072 Endist Pittsburgh

Same awarding agency

NAICS: 237990
New
Federal
JP Murtha Float Mooring Bitts Retrofit
Solicitation # W911WN27BA001
The United States Army Corps of Engineers, Pittsburgh District, is soliciting a Firm-Fixed-Price construction contract for the John P. Murtha Floating Mooring Bitts Retrofit at the John P. Murtha Locks and Dam in Westmoreland County, Pennsylvania. This project requires complex in-the-wet construction to install Government-furnished floating mooring bitts into contractor-fabricated embedded frames on the existing river chamber middle wall. The scope of work includes engineering design, the fabrication and installation of two structural steel dewatering boxes with a maximum 90-day duration, heavy concrete demolition using wire-sawing and core drilling, and the integration of cast-in-place concrete. The contractor must provide a fully compliant floating plant, certified commercial dive teams for underwater rigging and sealing, and adhere to EM 385-1-1 safety standards. The total period of performance is 730 calendar days following the Notice to Proceed. This is an unrestricted full and open solicitation under NAICS code 237990, with a small business size standard of 45 million dollars. Award will be granted to the lowest responsive and responsible offeror, with a 10 percent price evaluation preference provided to HUBZone firms. Bidders must be registered in the System for Award Management and the Procurement Integrated Enterprise Environment, where all electronic bids must be submitted. The contract is subject to the Davis-Bacon Act for wage determinations and requires a three-phase Quality Control System. Key deliverables include the fully operational mooring bitt assemblies and comprehensive quality control documentation. Performance and payment bonds are required, with the performance bond set at 100 percent of the original contract price.
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in 7 days
View Details
NAICS: 238210
New
Federal
RFI - Survey for Advance Contract Initiative Temporary Emergency Power
Solicitation # ACI-TEP-Survey
The Department of Defense, through the USACE Pittsburgh District, is conducting a sources-sought fact-finding exercise for an Advance Contract Initiative regarding Temporary Emergency Power. This initiative aims to establish a contract prior to federal declared emergencies to ensure rapid response capabilities across the United States and its territories. The current objective is to gather industry feedback on logistics, mobilization sequencing, subcontractor relationships, and cost drivers to inform future scope considerations and efficiency improvements. The scope of work involves providing all labor, equipment, and materials to support temporary emergency power activities through three phases: Mission Readiness, Mission Mobilization, and Mission Execution. Key responsibilities include conducting pre-installation inspections to determine generator sizing and connection methods, managing equipment at staging areas, and executing the installation of generators and external fuel tanks. Contractors must adhere to specific FEMA Bill of Materials standards and maintain 24-hour response operations. Operational requirements include the potential deployment of a five-person Advanced Echelon team and the appointment of a Site Safety and Health Officer. Performance is measured by the accuracy of installation assessments and the ability to mobilize assets to staging areas in a fully operational status. The process is governed by strict reporting timelines, including a 30-minute voice communication response standard and a 60-minute notification window for mishaps or incidents.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 238160
New
Federal
Mosquito Lake Control Tower Structural Standing Seam Metal Roof Replacement
Solicitation # W911WN26QA062
The U.S. Army Corps of Engineers, Pittsburgh District, is soliciting quotes for a 100% Small Business Set-Aside project to replace the structural standing seam metal roof on the Control Tower Building at Mosquito Creek Lake in Cortland, Ohio. This non-commercial construction project, categorized under NAICS 238160, has a rough estimate between $150,000.00 and $350,000.00. The scope of work includes the demolition and disposal of the existing roof system, box gutters, scuppers, and lightning protection, as well as the refurbishment of up to 95 linear feet of cold-formed metal sub-framing. Additional requirements include rerouting vent and exhaust pipes through the masonry side wall, sealing and insulating the concrete roof slab to R-30, and installing a new gutter system and a certified, non-penetrating Lightning Protection System compliant with LPI 175, NFPA 780, and UL 96A. The project will be awarded as a single Firm-Fixed Price contract based on best value, evaluating both price and past performance. The performance period is 365 calendar days from the written Notice to Proceed, with work hours restricted to Monday through Friday, 7:00 AM to 4:00 PM. Key personnel requirements include a Project Superintendent and a Quality Control System Manager, each with at least five years of relevant experience, and a Site Safety and Health Officer meeting EM 385-1-1 qualifications. Performance and payment bonds are required if the contract price exceeds $150,000. Final acceptance is contingent upon successful watertightness testing per AAMA 501:2 procedures and the delivery of a UL Master Label or LPI Certificate of Conformance.
Roofing Contractors

POSTED

6 days ago

DEADLINE

in about 20 hours
View Details
NAICS: 237990
Federal
Canonsburg-Houston, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation
Solicitation # W911WN27QA005
The U.S. Army Corps of Engineers, Pittsburgh District, is soliciting a Firm-Fixed-Price purchase order for the rehabilitation of the Canonsburg-Houston Local Protection Project in Strabane, Washington County, Pennsylvania. This total small business set-aside project, under NAICS 237990, focuses on restoring federal project integrity and design conveyance capacity along Chartiers Creek following severe storm damage. The scope of work includes vegetation clearing, the installation of erosion and sediment controls, the creation of temporary water diversions, and the removal and replacement of damaged geotextile fabric and riprap. The anticipated construction cost is between $150,000.00 and $350,000.00, with an expected award date of December 11, 2026. The project must be completed within 365 calendar days after the written Notice to Proceed, with a performance start window of 10 days. Work is restricted to weekdays from 7:30 AM to 4:00 PM. The government will award the contract based on best value, evaluating quotes on price and past performance. Key requirements include the provision of a Project Superintendent, a CQMC-certified Quality Control System Manager, and a dedicated Site Safety and Health Officer. Compliance with USACE EM 385-1-1 (2024) and the Davis-Bacon Act is mandatory. Performance and payment bonds are required at 100 percent of the original contract price, and liquidated damages for delays are set at $566.00 per calendar day.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 25 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS