Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on August 13, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Facilities Master Plan Phase 3B (FMP-3B) - Hardeson Campus Vehicle Maintenance Offices & Parts Dept. Final Design

Closed
2025-106State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
RFP/RFQ - On-Call Engineering Services for Torrington Transfer Station/NRRA
Solicitation # EDC 11- 2026 -01
The Northwest Hills Council of Governments (NHCOG) is soliciting proposals under solicitation number EDC 11- 2026 -01 for on-call engineering services to support the Torrington Transfer Station and the Northwest Resource Recovery Authority (NRRA). The agency seeks a qualified firm specializing in Municipal Solid Waste and Recycling Transfer Stations to provide technical analysis, facility and operational capacity assessments, site planning, and permitting assistance. These services are intended to support ongoing operations and inform the NRRA Strategic Plan and future capital investment decisions, ensuring compliance with CT DEEP General Permits. Interested firms must submit their proposals by November 30, 2026, at 11:00 AM. Submissions must include a project management plan, key personnel resumes limited to two pages, three relevant references, a technical approach, and a detailed project timeline. A fee proposal containing hourly rates or lump sum allocations must be submitted in a separate sealed envelope. Evaluation will be based on personnel qualifications, experience with multiuse trails and waste facility planning, the proposed project approach, and the fee schedule. Awardees must provide proof of workers compensation, liability, and vehicle insurance, including a waiver of subrogation and naming the State of Connecticut and NHCOG as additional insureds within ten days of the award. Required documentation also includes a Non-Collusion Affidavit and certifications of non-discrimination.
DAS Procurement

POSTED

about 10 hours ago

DEADLINE

in about 1 month

General Info

Place of Performance

WA, USA

Set-Aside

NONE

Documents

2

Merrill Creek Operations Building TI Phase 3B - Preliminary 30% Plans

PDF, High priority: read this firstspecifications
High

RFQ 2025-106: FMP-3B HCVM Offices & Parts Department Final Design

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Community Transit
Contacts1 person available
OfficeWA, USA
Office AddressWA, USA
Contacts
Rhonda WahlgrenContact

Full Description

Show more
Return to Bid List Bid NUMBER 2025-106 TITLE Facilities Master Plan Phase 3B (FMP-3B) - Hardeson Campus Vehicle Maintenance Offices & Parts Dept. Final Design PROCESS Unsealed BASE CURRENCY USD STATUS Awarded DESCRIPTION BID DOCUMENTS BIDDERS RESULTS CALENDAR
You must log in to register for Bid Events and to view Bid Question and Response information.
NUMBER 2025-106 TITLE Facilities Master Plan Phase 3B (FMP-3B) - Hardeson Campus Vehicle Maintenance Offices & Parts Dept. Final Design AVAILABLE DATE 8/13/2025 4:00 PM CLARIFICATION DEADLINE 9/3/2025 4:00 PM DUE DATE 9/11/2025 3:00 PM CONTACT INFORMATION
Rhonda Wahlgren, CPPB
contact@example.gov
BID TYPE Request For Qualification BILL TO 2312 W. Casino Road, Everett, WA 98204 US DESCRIPTION
Contract 2025-106 was awarded to Otak, Inc. on 12/4/2025.
Intent To Award was made to Otak, Inc. on 9/19/2025
This RFQ is open to all A&E firms.
The project provides for a preliminary estimate to obtain LEED Silver Certification prior to starting building design; construction Plans, Specifications and Estimates (PS&E) from Preliminary (30%) through 60%, 90%, and Final (100%) Design; renderings of each floor plan and exterior elevation at each design level; site survey; geotechnical data gathering; existing utility locates; building hazardous materials sampling and remediation plans, as needed; permitting assistance; project master schedule; bidding assistance through award of the General Contractor; and Construction Administration Services during construction.
See Complete RFQ in 'Documents' tab.
Optional Pre-Proposal Conference - See meeting details in the RFQ and 'Documents' tab.
Vendors shall upload electronic copies of their Technical Proposal and completed forms as follows: Download documents from the "DOCUMENTS" tab. Questions can be submitted in the "CLARIFYING QUESTIONS" tab by the deadline specified. Upload completed documents (identified in the "Vendor Checklist") in the "RESPONSE" tab.

More opportunities from Washington → Community Transit

Same awarding agency

NAICS: 541512
SLED
Enterprise Business System Replacement and Implementation Services
Solicitation # 2026-139
Community Transit is soliciting proposals for the strategic redesign, replacement, implementation, and integration of its Enterprise Business Technology, with a primary focus on Financial and Human Resources systems. This Request for Proposal, numbered 2026-139, requires vendors to provide a comprehensive package including both the enterprise software solutions and the necessary implementation services; proposals offering only one of these components will be disqualified. The project scope encompasses a vast array of functional requirements across 17 areas, including General Ledger, Payroll, and Budgeting, with a specific emphasis on capabilities such as EEO tracking, ADA request management, and complex three-way matching for procurement. Proposals are due by December 3, 2026, at 2:00 p.m. Pacific Time and must be submitted electronically via the agency's procurement portal. The evaluation process follows a cumulative, best-value scoring approach, with cost analysis potentially based on a fully loaded ten-year cost of ownership. Financial submissions must include detailed cost worksheets and narratives covering licensing, professional services, and recurring maintenance. The total budget for this initiative is listed at 502.4 million dollars, divided between operating and capital expenses. Awarded vendors will be subject to strict conflict of interest certifications and an acceptance-based payment schedule tied to key project milestones such as system deployment and phase go-live.
Computer Systems Design Services

POSTED

12 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS