This Sources Sought opportunity was posted on May 1, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Facility Expansion Project is to Hardwired Line and FiberOptic Installation

Closed
FiberOptic4277Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
High Voltage Electrical Basic Ordering Agreement (BOA)
Solicitation # LAW02202026A
Solicitation LAW02202026A is a Basic Ordering Agreement (BOA) managed by UT-Battelle LLC for the Department of Energy to provide overhead electrical distribution services for the Oak Ridge National Laboratory (ORNL) system, operating at nominal voltages of 13.8 kV and 2400 V. The scope of work encompasses routine maintenance, including pole and insulator inspections and vegetation management, as well as facility expansion and construction involving the installation of new lines and infrastructure upgrades. The agreement requires the seller to maintain 24/7 availability for emergency responses, with a mandatory mobilization timeframe of 24 hours following notification. All work must be performed in accordance with ORNL oversight and adhere to strict technical and safety standards, including OSHA regulations 1910 and 1926, the National Electrical Safety Code (NESC), the National Electrical Code (NEC), and IEEE standards. The seller is required to comply with site-specific processes such as Lockout/Tagout (LOTO), Power Distribution Work Permits (PDWP), and Integrated Safety Management. Personnel must be properly trained and certified for the specific voltage classes involved, and all seller-furnished equipment must meet OSHA and ANSI standards. Performance is evaluated based on adherence to these safety protocols, participation in pre-job briefings, and the quality of work verified by ORNL Electrical Utilities.
Ornl Ut-Battelle Llc-Doe Contractor

POSTED

about 7 hours ago

DEADLINE

N/A
NAICS: 237130
New
SLED
Term Agreement with 4 Options to Renew - Fiber Optic Maintenance, Repair and Modernization for IT, Transportation, and Water Departments
Solicitation # REQ00003176
The City of Garland is soliciting bids for a term agreement under solicitation REQ00003176 to provide fiber optic maintenance, repair, and modernization services for its IT, Transportation, and Water Departments. The contract consists of an initial twelve-month term with four optional twelve-month renewal periods. The City intends to award the contract to the two highest-ranked respondents, designating one as the primary contractor and the other as the secondary contractor to ensure redundancy and emergency response capacity. Award decisions are based on best value, evaluated through overall qualifications, client references, and relevant project examples. The scope of work requires the contractor to provide all labor, materials, and equipment for installation, troubleshooting, and emergency repairs of critical infrastructure, including public safety and SCADA systems. Critical priority outages require a two-hour response time. Deliverables include schematic diagrams, OTDR test files, and as-built drawings, with a minimum two-year workmanship warranty required for all services. Bidders must submit comprehensive bids on all items to be considered responsive, adhering to Texas Government Code Chapter 2258 for prevailing wage rates. Materials are to be billed at actual cost plus a markup not exceeding 10 percent. All submissions must be made electronically via the IonWave portal by November 5, 2026.
City Of Garland

POSTED

about 23 hours ago

DEADLINE

in 15 days
NAICS: 237130
New
SLED
North State And Hwy 101 Utility Infrastructure Boring Project
Solicitation # 26-02
The City of Ukiah, Department of Electric Utility, is soliciting bids for the North State and Hwy 101 Utility Infrastructure Boring Project (Solicitation #26-02). This project involves the installation of utility infrastructure through horizontal directional drilling (HDD) and trenching at North State Street and Highway 101 in Ukiah, California. The scope of work includes 1,375 linear feet of HDD and 142 linear feet of trenching, backfilling, and compaction. Key deliverables include the installation of various HDPE and PVC conduits ranging from 1.25 to 6 inches and the installation of six fiber service vaults. The contract will be awarded to the lowest responsive and responsible bidder based on the lowest Base Bid. Eligible bidders must possess a valid State of California Class A Contractor's License and be registered with the Department of Industrial Relations. Submission requirements include a detailed proposal with unit pricing, a Fair Employment Practices Certification, a notarized Non-Collusion Affidavit, and a statement of experience. Bids must be accompanied by a 10 percent bid security. Upon award, the contractor is required to provide a performance bond for 100 percent of the total contract price, as well as a payment bond and appropriate insurance certificates. The City will provide engineering personnel for inspections, and the contractor is responsible for ensuring all materials are stored to preserve quality and fitness for the work. The response deadline for this solicitation is December 1, 2026.
City of Ukiah

POSTED

1 day ago

DEADLINE

in about 1 month
NAICS: 237130
New
SLED
Broadband Implementation Project - FFA
Solicitation # 2001063
The Broadband Implementation Project - FFA, solicitation number 2001063, is a comprehensive infrastructure initiative for the City of San Luis Obispo, California. The project involves the installation of aerial and underground fiber optics, including directional boring for conduit, deep bore casing, and the installation of 288 CT fiber cable. The scope of work encompasses the placement of various sized vaults, copper clad ground rods, pole risers, down guys, anchors, and new wooden poles, as well as cut and kick operations for existing poles. Additional requirements include potholing, tree trimming, public notification, and strict compliance with CPUC grant reporting and archaeological monitoring. The project is structured with a base bid and five additive alternates covering specific street segments, with award decisions based on a total project bid hierarchy capped at 2,400,000 dollars. Contractors must adhere to stringent technical and regulatory standards, including CPUC General Order 95, Caltrans 2024 specifications, and the City of San Luis Obispo 2025 Engineering Standards. Key requirements include the submission of OTDR bi-directional testing results prior to acceptance and the employment of directional drilling personnel with at least two years of experience. Bidders must provide a bid guaranty of 10 percent of the bid amount and, upon award, provide performance and payment bonds equal to 100 percent of the contract price. Compliance with California Labor Code is mandatory, requiring registration with the Department of Industrial Relations and adherence to prevailing wage laws. Sealed bids are due by 11:00 a.m. on November 19, 2026, to the Public Works Administration Office in San Luis Obispo.
City of San Luis Obispo

POSTED

1 day ago

DEADLINE

in 29 days
NAICS: 237130
New
Federal
COTP Series Capacitor Two-Phase Design Build
Solicitation # 89503326RWA000049
The California Oregon Transmission Project (COTP) Series Capacitor Bank Replacement is a firm-fixed-price, two-phase design-build construction project issued by the U.S. Department of Energy, Western Area Power Administration (WAPA). With an estimated magnitude exceeding $80 million, the project involves the engineering, procurement, and construction of four 525kV series capacitor banks at the Maxwell, Tracy, Olinda South, and Olinda North substations. The scope includes the installation of capacitor banks, live tank circuit breakers, disconnect switches, MOVs, and associated control systems, as well as the demolition and construction of foundations and platforms. The project is scheduled for completion by June 30, 2033, with a proposal deadline extended to November 13, 2026. The procurement follows a best-value source selection process divided into two phases. Phase I focuses on qualifications, evaluating corporate experience, technical competency, and past performance to shortlist up to five offerors. Phase II involves a detailed technical and price proposal, where factors such as organization, key personnel, technical solution, and price are assessed. Key contract requirements include strict adherence to Buy American standards, cybersecurity approvals for network-interfacing equipment, and compliance with prevailing wage determinations for Colusa, Shasta, and Alameda counties. Financial terms include progress payments for mobilization and preparatory work, while liquidated damages are established for delays in returning capacitor banks to service. Security protocols require comprehensive background checks for all personnel and specific data cards for foreign nationals.
Western Sierra Nevada Region

POSTED

1 day ago

DEADLINE

in 23 days

General Info

Agency

N/A

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

Baton Rouge, Louisiana, BATON ROUGE, LA, 70812, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Kimberly GanttContracting Officer
Kimberly HodgeContracting Officer

Full Description

Show more
THIS ANNOUNCEMENT IS NOT A NOTICE OF SOLICITATION ISSUANCE. THIS IS FOR PLANNING PUPOSES ONLY. ANY FORMAL SOLICITATION WILL BE ANNOUNCED SEPERATELY. IT IS NOT TO BE CONSTRUED AS A COMMITTMENT TO THE GOVERNMENT NOR WILL THE GOVERNMENT PAY FOR INFORMATION PROVIDED IN RESPONSE TO THIS NOTICE. THIS IS NOT A SOLICITATION OR REQUEST FOR PROPOSALS. The Sherwood Facility Expansion project is to provide hardwired line and fiber optic services for 4 locations outside of the main warehouse building where current hardline services currently reside. The following points are neeeded to get fiber optic services to these locations: Material lists are for the following: Conduit (new): 1,150' Backboard and terminal placements: seven (7) units Waterproof Housings: seven (7) units Fiber Housings: eight (8) units Rod and Rope/ Repair Conduit: 1,485' Drop Wire (copper - six (6) pair): 3,795' Drop Wire (Fiber - twelve (12) fibers): 4,035' In ground pull box (SB1): one (1) unit Copper Cable (twenty-five (25) pair): 875' Fiber drop in duct (Fiber - twelve (12) fibers): 2,440' Number of Fiber ends to be terminated 84 66m-50 Connection Blocks - eight (8) Conduit Placement: This job requires placing 1150' feet of a single 2" duct structure at locations shown on job drawings. As build actual distance is to be provided. One sidewalk box (17"x 30"x 24") is to be place as shown on job for pulling purposes. All riser bends need to be encased with concrete as shown on drawings. All conduit openings will be capped with re-enterable duct plugging compound. Trenching to a depth of 2' is required and Contractor is to call LA811 for locating underground facilities prior to digging. Contractor is responsible to repair any damage done to any facility, system, foundation or any other property within the scope of work at contractor expense. Conduit Repair: Existing Conduit on property has been abandoned and needs repair at one location. This existing structure needs to be cleaned out and existing place needs to be removed for new placement. Rod and rope existing conduit for new cable placement on this job. As build actual distance is to be provided. Contractor is to call LA811 for locating underground facilities prior to digging. Contractor is responsible to repair any damage done to any facility, system, foundation or any other property within the scope of work at contractor expense. Backboard Placement: Backboard for facility termination is described on this job, to be built and placed. There are seven (7) Backboards to be built and placed on the Sherwood Forest property as shown in the plans. The Backboards are to be made of 4x4 post and 1" Plywood (4'x3') backing. Post are to be cemented into the ground at the different locations except at warehouse B where it is to be mounted on the side of the building. Mount one weatherproof housing at each backboard. Mount one fiber terminal and 66-m50 in each weather proof housing on each backboard. Cable Placement (Copper): Place 835' of 25 pair cable. Cable type preferred is ANTW, but BKTH is acceptable. Drop Placement (Copper): Place @ 3,795' of six (6) pair 24 gauge copper multiple drop. Hang drop to maintain 15 foot clearance over all roadways, driveways and vehicle access points along placement route. Terminate all copper drops on provided 66m-50 blocks in the weatherproof housings at each location. Test end to end conformance and tag drops with location names. Drop Placement (Fiber): Aerial: Place @ 4,035' 12 Fiber, single mode multiple drop. Hang drop to maintain 15 foot clearance over all roadways, driveways and vehicle access points along placement route. Terminate all copper drops in provided Fiber terminals in the weatherproof housings at each location. Terminate all fiber ends with single mode LC connectors. All fiber connectors in each fiber box are to be Single Mode LC connectors. Test end to end conformance and tag drops with location names. Drop Placement (Fiber): Conduit: Place @ 2,440' 12 Fiber, single mode multiple drop. This fiber is to be placed as shown through the existing duct structure once this structure has been cleaned out as re-roped for pulling. Terminate all copper drops in provided Fiber terminals in the weatherproof housings at each location. Terminate all fiber ends with single mode LC connectors. All fiber connectors in each fiber box are to be Single Mode LC connectors. Test end to end conformance and tag drops with location names. Contractor is to provide wall to wall footages of all conduit, new and existing. Contractor is to provide conformance test on all copper terminations new and existing in the scope of work herein. Contractor is to provide conformance test on all fibers terminations placed on this job. Contractor is responsible to obtain all or any permits required to do this job are required by the City of Baton Rouge or the Parish of East Baton Rouge. Contractor is responsible for all damages and repairs done by contractor and/or contracted entities employed by same contractor.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS