Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Vermont was posted on May 1, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fair Haven Village Green Stormwater Implementation

Closed
64459State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The South Lake CWSP is seeking a contractor to construct an underground stormwater infiltration system in Fair Haven's Town Park, Vermont. The project involves installing an underground treatment tank system capable of treating 17,000 cubic feet of water from a total water quality volume of 36,400 cubic feet, with design plans finalized by Fitzgerald Environmental Associates. Covering an urban drainage area of nearly 26 acres, including almost 10 acres of impervious surfaces such as paved roads, driveways, and rooftops, the project aims to improve stormwater management and reduce runoff into the Poultney River via the Castleton River. The scope of work includes boring or laying new piping under Park Street from an existing storm drain, installing a swirl separator for pretreatment, and excavating, backfilling with washed stone, and installing a series of R-Tanks within the park. The contract, titled "Fair Haven Village Green Stormwater Implementation," was posted on May 1, 2025, with a response deadline of May 20, 2025. It is managed by the Rutland Regional Planning Commission under the Vermont agency, with a project budget estimated between $500,000 and $1.5 million. Interested contractors can contact Hilary Solomon via email or phone for further details. The project emphasizes urban stormwater infrastructure improvements to enhance water quality and environmental resilience in the Fair Haven area.

General Info

Agency

Vermont → Rutland Regional Planning Commission

Place of Performance

VT, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Rutland Regional Planning Commission
Contacts1 person available
OfficeN/A
Organization / Agency
Vermont → Rutland Regional Planning Commission
Office AddressN/A

Full Description

Show more
The South Lake CWSP is interested in hiring a contractor to complete construction of an underground stormwater infiltration system located in the Town Park of Fair Haven, Vermont. The project includes installation of an underground treatment tank system that will treat 17,000 CF of water (of 36,400 of generated WQv). Fitzgerald Environmental Associates created the final stormwater design for this project (11/25/2024). This project consists of an urban drainage area of 25.97 acres, including 9.73 acres of impervious surfaces (largely paved roads, driveways and rooftops) that currently drains to the Poultney River via the Castleton River. The project includes three main activities: boring under Park Street (or otherwise running new pipe) from an existing storm drain at Park Street and Caernarvon Street to the town Park; installing a swirl separator/pretreatment unit; and excavating for, backfilling with washed stone, and installing an assemblage of R-Tanks in the park.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS