Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on January 23, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Above Ground Storage Tank Installation At Fire Station 3

Closed
25-12State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
Demolition of Connex Box Structures and Removal of Debris
Solicitation # ACFD 26-03
The Alameda County Fire Department (ACFD) is soliciting sealed bids for solicitation number ACFD 26-03, focused on the demolition of Connex Box Structures and the removal of debris at 890 Lola Street in San Leandro, California. This is a stipulated sum, single-prime contract with a total project duration of 120 calendar days. Bids must be submitted by 2:00 pm on December 10, 2026, at 6363 Clark Ave., Dublin, California. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid amount. Required submission documents include a bid bond or security of 10 percent of the total bid price, a non-collusion declaration, a debarment form, and a designated subcontractors list. The successful contractor must provide 100 percent performance and payment bonds and adhere to California Public Works Contract requirements, including the payment of prevailing wages. Key operational requirements include the submission of a site security and logistics plan addressing tool control and working around inmates, as well as strict adherence to soil dust mitigation and hazardous materials procedures. Project milestones range from the initial kick-off meeting and equipment delivery to final site clearance. The contractor is also required to comply with the Americans with Disability Act and Title VII of the Civil Rights Act of 1964. All work is subject to inspection and potential rejection by the ACFD and the Construction Manager to ensure conformity with technical specifications and industry standards.
AC Fire Department

POSTED

about 10 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The City of Costa Mesa is soliciting bids for the installation of an above ground storage tank at Fire Station 3 in California under solicitation number 25-12. The project scope encompasses the full lifecycle of construction, beginning with mobilization, site preparation, utility marking, and excavation. Key deliverables include the construction of a reinforced concrete pad and the installation of a 2,000 gallon above ground diesel tank featuring a comprehensive fuel management solution, along with the necessary sub panel and tank panel. Additionally, the contractor is responsible for the engineering, permitting, and installation of a canopy, which is designated as a deferred submittal. The contract concludes with site restoration, debris removal, a final inspection, and the delivery of all required warranties and documentation. Interested parties must submit their responses by the deadline of August 22, 2025.

General Info

Costa Mesa seeks bids for a 2,000 gallon diesel tank installation by August 22.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Feb 12, 2025 to Aug 22, 2025. The notice title changed. NAICS code changed from 541330 to 238910. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Costa Mesa
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The scope of work generally consists of mobilization of equipment, materials, and personnel to the project site, followed by site preparation and utility marking. The project area will be demoed, cleared, and excavated as shown on the drawings, followed by construction of a reinforced concrete pad, installation of a 2,000 gallon above ground diesel tank equipped with a comprehensive fuel management solution, and installation of a sub panel and tank panel. Contractor will also be responsible for procuring canopy engineering, file for, andobtain permit and install. The canopy is a deferred submittal. Upon completion, the site will be cleaned and restored, debris removed, and a final inspection conducted. All required documentation and warranties will be delivered.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS