Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Florida was posted on April 29, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fall Protection System Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Utilities and Engineering agency in Florida is seeking a subcontractor for the design, supply, and installation of a permanent fall protection system. The project focuses on ensuring worker safety at height within a lift station, requiring all installations to be fully compliant with OSHA and ANSI standards. This subcontract opportunity was posted on April 29, 2025, and requires responses by May 29, 2025. The work falls under NAICS code 238990, and further details can be accessed through the OpenGov procurement portal.

General Info

Florida agency seeks subcontractor for OSHA compliant fall protection system by May 29.

Documents

This scope was carved out of 2025-104.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

City Of Stuart Conquistador Lift Station (C-45) Rehabilitation Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 15 days
  • PURIFIED WATER REPLENISHMENT SAN JACINTO VALLEY ADVANCED WATER PURIFICATION FACILITY SPECIFICATION NO. 1472WOpen now, due in 2 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Utilities and Engineering
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Design, supply, and installation of a permanent fall protection system compliant with OSHA and ANSI standards for worker safety at height within the lift station.

More opportunities from Florida → Utilities and Engineering

Same awarding agency

NAICS: 237110
New
SLED
City of Stuart Water Treatment Plant FA-2 Raw Water Main Project
Solicitation # 2027-107
The City of Stuart Utilities and Engineering Department is soliciting bids for the Water Treatment Plant FA-2 Raw Water Main Project, solicitation number 2027-107. The project involves the installation of 12-inch, 14-inch, and 16-inch HDPE raw water mains and 2-inch HDPE fiber optic conduit using a combination of horizontal direction drilling and open trench methods. The scope of work includes the installation of fiber optic pull boxes, manual air release valves, and other necessary appurtenances, as well as pressure testing, chlorination, asphalt roadway removal and replacement, chain link fence restoration, and sodding. All work must be completed within 180 calendar days from the issuance of the Notice to Proceed, with work required to commence within ten days of that notice. The contract will be awarded to the lowest responsive and responsible bidder based on a fixed-price agreement. Bidders must comply with several regulatory requirements, including Davis-Bacon prevailing wage rates for Martin County, Florida, and American Iron and Steel provisions. Additionally, the project requires adherence to Florida Department of Environmental Protection supplementary conditions and ADA standards. A bid bond of 10 percent is required for proposals exceeding 50,000 dollars, and the successful contractor must provide performance and payment bonds equal to 100 percent of the contract amount. Bids are due by December 18, 2026, at 2:00 pm, and may be submitted electronically via the City's e-Procurement Portal or in person at Stuart City Hall.
Water and Sewer Line and Related Structures Construction

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
SLED
City of Stuart Floridian Aquifer Production Well FA-2
Solicitation # 2027-106
The City of Stuart is soliciting bids from qualified general contractors for the construction of the Floridan Aquifer production well FA-2 at the Water Treatment Facility in Stuart, Florida. To be eligible, bidders must hold active Florida Water Well Contractor and Florida Certified General Contractor licenses. The scope of work encompasses drilling, setting steel and PVC casings, grouting, well logging, flow and pump testing, wellhead assembly, and site restoration. Additionally, the project requires the implementation of a formation water disposal system including temporary piping, pumps, and settling tanks. An additive alternate is available for the mechanical, electrical, structural, civil, and instrumentation work necessary to provide a fully operational wellhead and connection to the raw watermain. The contract will be awarded to the lowest responsive and responsible bidder using a fixed-price structure. Performance must begin within ten days of the Notice to Proceed, with substantial completion timelines ranging from 210 to 360 calendar days depending on the awarded scope. The project is subject to several regulatory requirements, including Davis-Bacon prevailing wage rates for Martin County, American Iron and Steel provisions, and Florida Department of Environmental Protection supplementary conditions. Bidders must submit their proposals by 2:00 pm on January 8, 2027, and are required to provide a bid bond, with payment and performance bonds required upon award.
Water and Sewer Line and Related Structures Construction

POSTED

11 days ago

DEADLINE

in about 2 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS