Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on May 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Farmers Market Culvert Inlet Improvements

Closed
PE-66047-NONST-2026-000000006State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including storm water pollution prevention. Required materials include ready mix supply, precast concrete, and aggregate. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered, responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested firms must be issued an Invitation to Bid through the Building Connected electronic system, with a response deadline of November 18, 2025. Primary contact for this effort is Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 7 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
On-Call And Emergency, Repair, Maintenance, Replacement, And Installation Services For Various Public Infrastructure Facilities
Solicitation # 27-037A
The City of Santa Ana is soliciting Statements of Qualifications for solicitation 27-037A to establish a pre-qualified list of contractors for on-call and emergency repair, maintenance, replacement, and installation services for public infrastructure. The scope of work is divided into two primary functional areas: water and sewer systems, including groundwater well equipment, pump stations, and treatment facilities, and channelization, covering the installation and maintenance of signage, striping, and guardrails. All work must adhere to the City of Santa Ana Standard Plans, the California Manual of Uniform Traffic Control Devices, Greenbook Standard Specifications, and Caltrans standards. To be eligible, contractors must hold a General Class A License and possess at least five years of experience working with public agencies. The selection process for the pre-qualified list is based on technical expertise, responsiveness to requirements, and conformance to instructions. Once on the list, individual project awards will be determined by the contractor's response time for quotations, cost, and availability to start work. This is a public works project subject to California prevailing wage rates, and contractors must comply with various federal and state regulations, including the ADA, Section 504 of the Rehabilitation Act, and CARB fleet compliance. Submissions must be made electronically via the PlanetBids portal by November 4, 2026. A complete submittal package requires a detailed implementation plan and several signed certifications, including a notarized non-collusion affidavit and SAM.gov UEI verification for federally funded projects. Payments are processed via ACH transfers within 45 days of receiving a proper invoice. The contract includes a multi-year term with the possibility of extensions granted by the City Manager, and the City maintains the right to inspect all work for up to three years following final payment.
CITY OF SANTA ANA

POSTED

about 13 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The City of Garden City, Georgia is soliciting sealed bids for the Farmers Market Culvert Inlet Improvements project under solicitation number PE-66047-NONST-2026-000000006, with bids due by 11:00 PM local time on July 2, 2026, at City Hall, 100 Central Avenue, Garden City, Georgia 31405. This is a unit price contract requiring the contractor to construct a new headwall and pipe extension for a canal, along with associated drainage improvements, erosion and sediment control measures, grading, traffic control, and site stabilization, using all provided materials, labor, and equipment. The work must comply with applicable Georgia laws, building codes, Underwriters’ codes, and ASTM regulations, and must be performed by a licensed Georgia contractor. The project scope includes specific quantities for storm drain pipes ranging from 12 to 48 inches, installation and removal of silt fences and sediment basins, excavation, backfill, compaction, and other site-related tasks, with a designated field allowance of $25,000. All bids must be submitted on official forms, typewritten or in ink, in sealed envelopes with an original and duplicate copy, and electronic submissions are not accepted. No pre-bid conference is scheduled, and any changes to the specifications must be issued as written addenda, which may postpone the bid opening date. The contractor must provide a 100% Performance and Payment Bond issued by a surety licensed in Georgia, and maintain insurance coverage with an A.M. Best rating of at least A and a five-year financial rating of no less than V, with no lapse permitted during performance. The City will not be named as an additional insured due to sovereign immunity, and any insurance cancellation requires 30 days’ written certified notice. Work must begin within 10 days of receiving the Notice to Proceed and complete within 180 calendar days thereafter for a total duration not to exceed 190 calendar days. Payment is subject to monthly invoicing itemized by line item, accompanied by a progress report and approval by both the City and the Engineer of Record, with final payment upon certificate of substantial completion and acceptance. The contractor must comply with E-Verify requirements for employees and subcontractors, adhere to a drug-free workplace policy, and meet SAVE program obligations. A one-year warranty covers all materials and workmanship,

General Info

City of Garden City solicits sealed bids for Farmers Market Culvert improvements, deadline July 2, 2026.

Documents

1

ITB 2026 Farmers Market Culvert Inlet Improvements

PDF, High priority: read this firstitb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Garden City
Contacts1 person available
OfficeN/A
Organization / AgencyGeorgia → City of Garden City
Office AddressN/A

Full Description

Show more
This is an invitation to submit a bid to supply the City of Garden City (City) with construction and/or services as indicated herein. Sealed bids will be received at City Hall at 100 Central Avenue, Garden City, Georgia 31405 up to 11:00PM local time, July 2, 2026, at which time they will be opened and publicly read. City reserves the right to reject all bids that are non-responsive or not responsible.
Instructions for preparation and submission of a bid are contained in this Invitation To Bid package. Please note that specific forms for submission of a bid are required. Bids must be typed or printed in ink.
A Pre-bid Conference is not scheduled.
Any changes to the conditions and specifications must be in the form of a written addendum to be valid; therefore, the Project Manager will issue a written addendum to document each approved change. Generally, when addenda are required, the bid opening date will be changed.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS