Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Justice was posted on April 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FCI SCHUYLKILL UPGRADE WATER TANK - 25Z2AD8

Closed
Federal
Submission Closed
Solicitation #
15B21326Q00000003

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238990
New
Federal
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, identified by solicitation number SD-462, is a comprehensive infrastructure project located at the Main Wastewater Treatment Plant in California. The scope of work involves the rehabilitation of covered and open concrete structures, the relining, modification, or replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Key technical requirements include the installation and operation of a temporary 11 MGD pumped bypass, the rehabilitation of reactor mixers and aerators, and the replacement of motor control center components. Additionally, the project encompasses electrical and instrumentation improvements, modifications to sluice and slide gates, the installation of platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying of reactors. Managed by Ranger Pipelines Incorporated, the project has an estimated value between $18.5 million and $19.5 million. The solicitation is designated as a Small Business set-aside, encompassing SBA certified Veteran Owned Small Business, Service-Disabled Veteran Owned Small Business, Women-Owned Small Business, and HUBZone Small Business. The procurement seeks qualified subcontractors for specialized services including coating and lining, concrete rehabilitation, confined space entry support, coring and sawcutting, crane services, electrical and instrumentation, metals fabrication, oxygen cleaning, and welding. Quotations are due by December 2, 2026.
Ranger Pipelines Incorporated

POSTED

about 2 hours ago

DEADLINE

in 3 days

AI Contract Overview

Show more

The Federal Correctional Institution Schuylkill in Minersville, Pennsylvania is seeking a qualified contractor to perform a series of maintenance and upgrade tasks on a 500,000-gallon above-ground water tank. The work includes cleaning the tank interior to remove sediment, installing safety and functional equipment such as an anti-vortex plate, cable-type safety climb device, thermometers, heaters, and sacrificial anodes. Additional tasks involve upgrading structural and safety features like replacing the overflow pipe with a steel system, installing locks and safety signage, repairing cracks with commercial grout, and applying antifungal pressure washing to the tank exterior. The contractor will also be responsible for adjusting and lubricating the liquid level gauge, replacing bolts with maintenance-free galvanized steel, securing and painting anchor bolts, and protecting the exposed foundation. All labor, materials, and incidentals required to complete these tasks are to be provided. The solicitation, identified under the number 15B21326Q00000003, was posted on April 7, 2026, with responses due by April 21, 2026. This opportunity is issued by the Department of Justice’s FCI Schuylkill office, with Stephanie Sandler as the primary contact. The NAICS code for this contract is 238990, indicating it falls under specialty trade contractors.

General Info

Maintenance and upgrades on 500,000-gallon water tank including cleaning, safety, and structural improvements.

NAICS

238990 - All Other Specialty Trade Contractors

Place of Performance

Minersville, PA, 17954, USA

Set-Aside

small_business

Documents

3
PDF, High priority: read this firstrfq
High
PDF, High priority: read this firstsow
High
PDF, Low priorityinspection-report
Low

Read all 3 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • AMC-0166 CRW ASR Public AnnouncementOpen now, due in 31 days
  • MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 4 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Justice → Fci Schuylkill
Contacts1 person available
OfficeMINERSVILLE, PA, 17954, USA

Full Description

Show more

The Federal Bureau of Prisons, Federal Correctional Institution (FCI) Schuylkill located in Minersville, Pennsylvania intends to make a single award to a responsible entity to provide all necessary equipment, labor, materials, and incidentals to correct the below referenced work on a 500,000 gallon above ground water tank: 


  • Perform a dry interior cleanout to remove sediment.
  • Install an anti-vortex plate on the suction line.
  • Install a cable-type safety climb device on the shell ladder.
  • Post a confined space entry sign at the primary roof hatch.
  • Adjust, calibrate, and lubricate the existing liquid level gauge.
  • Install a thermomete on the tank.
  • Replace the PVC overflow pipe with a steel overflow system, complete with standoffs, flapper valve, and screen.
  • Install two (2) open coil element (OCE) heaters.
  • Install sacrificial anodes on the interior shell.
  • Install a lock on the primary roof hatch. (Owner provided lock)
  • Repair cracks and spalling with a commercial non-shrinking grout.
  • Pressure wash the tank exterior with an antifungal solution.
  • Install a fall protection required sign near the base of the shell ladder.
  • Install a frost-proof drain valve complete with a locking device. (Owner provided lock)
  • Replace the bolts on the primary shell manway with maintenance-free galvanized steel bolts.
  • Clean the area around the anchor bolts, tighten the anchor nuts, and tack weld the nuts to the bolts, repaint.
  • Clean the exposed foundation and seal or paint to protect the concrete.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS