This project involves the upgrade of dam control facilities at Shikellamy State Park in Sunbury, Northumberland County, Pennsylvania, managed by the Commonwealth of Pennsylvania Department of Conservation and Natural Resources. The scope of work includes the salvage of existing mechanical equipment, select demolition of the current Dam Control Building, the construction of a building addition and second floor, and the installation of a new bituminous driveway. Technical upgrades feature the rearrangement of blowers and compressor air piping, the installation of a new electrical power system and emergency generator, and the replacement of the existing dam control panel. The engineer's estimate for the project ranges between 250,000 and 450,000 dollars, and DGS Small Business Certification is required for bidders. A critical operational constraint dictates that physical work on and within the blower house building is strictly limited to the period from October 2027 through April 2028 to ensure the dam remains functional at all other times. The project schedule accounts for long lead times on necessary components prior to the start of physical construction. This solicitation, identified as FDC-131-101491.1, requires a lump sum bid as per Addendum No. 1 and adheres to the 2022 DCNR General Conditions for Construction. Bidders must also provide an Anti Collusion Affidavit to ensure competitive bidding practices.
General Info
Place of Performance
PA, USASet-Aside
Documents
5AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Physical work on and within the blower house building shall only occur from October 2027 through April 2028. The building must remain functional and operational at all other times for the operation of the dam. Components required for the project may have long lead times. Sufficient time is built into the project schedule for these items prior to physical construction on the building. This Contract includes, but is not limited to, salvage of existing mechanical equipment, select demolition of the existing Dam Control Building, construction of a building addition and second floor, construction of a new bituminous driveway, rearrangement of blowers and compressor air piping, installation of a new electrical power system and emergency generator and replacement of the existing dam control panel.
DGS Small Business Certification Required
Engineer's Estimate: $250,000 - $450,000
More opportunities from Commonwealth of Pennsylvania - Department of Conservation and Natural Resources
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS