Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Feasibility to Connect Alpine Springs Mobile Home Park to PWD System

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Alpine Springs Mobile Home Park Project, managed by the Palmdale Water District, aims to consolidate the Alpine Springs Mobile Home Park into the district's system to ensure an affordable and reliable water supply. This initiative is necessary because the park's existing well is out of production, forcing a reliance on daily water deliveries. The project is located at 36223 Sierra Highway in Palmdale, California, and has been granted a Notice of Exemption under Class 1 and Class 3 categorical exemptions for small utility facilities and new construction. The technical scope of work involves significant infrastructure improvements, including the installation of approximately 1,890 feet of 8-inch water main and a 2-inch master meter equipped with a backflow prevention device. Key components include establishing a connection at North Aspen Street and Sierra Hills Lane, connecting to a 20-inch transmission main across Sierra Highway via the northbound unpaved shoulder, and linking to an onsite storage tank and distribution system. Additionally, the project requires the installation of two fire hydrants, one pressure-reducing valve with associated appurtenances, and the eventual destruction and abandonment of the onsite well. Dennis D. LaMoreaux serves as the primary point of contact for the Palmdale Water District regarding this project.

General Info

Palmdale Water District will install water mains and meters for Alpine Springs Park.

Agency

California → Palmdale Water District

Place of Performance

Sierra Highway, Palmdale, CA, 93550

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Palmdale Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Palmdale Water District
Office AddressN/A
Contacts
Dennis D. LaMoreauxGeneral Manager

Full Description

Show more
The Project proposes to consolidate the Alpine Springs Mobile Home Park (ASMHP) into Palmdale Water District so they can receive an affordable and reliable water supply. Currently, ASMHP's well is out of production, and they are relying on daily water deliveries. To remedy this, the Project components include: approximately 1,890 feet of 8-inch water main, one 2-inch master meter and backflow prevention device, a connection at North Aspern Street and Sierra Hills Lane, connections to a 20-inch transmission main across Sierra Highway on the northbound unpaved shoulder, connection to an onsite storage tank and distribution system, and installation of two fire hydrants along connection mains.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements Redesign Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening, a new influent eccentric manhole, a concrete flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and pump system, the construction of two soil cement lined sludge dewatering ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This solicitation is open to small businesses and certified DBE, MBE, and WBE firms across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026. Primary coordination for this opportunity is handled by Christina Pauls at GSE Construction Co., Inc.
GSE Construction Co., Inc.

POSTED

about 14 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237110
New
City of Lomita: Zone G Water Main Replacement Project
Solicitation # city-lomita-zone-g-water-main-replacement-project
The City of Lomita Zone G Water Main Replacement Project involves the installation of approximately 4,500 linear feet of new 8-inch DIP water mains, gate valves, fittings, water services, and fire hydrant assemblies, along with the abandonment of existing water mains. The work is located on Walnut Street, Ebony Lane, and 247th Place in California. W.A. Rasic Construction Company, Inc. is acting as the prime contractor and is soliciting subcontractor quotations for various trades, including waterworks, ready-mix concrete, PCC and AC paving, AC grind and cap, striping, traffic control, hot taps, trucking, and soil and material testing. The response deadline for subcontractor quotations is October 19, 2026, at 1:00 PM. This is an SBA set-aside opportunity encouraging participation from DBE, MBE, WBE, and SBE firms. Qualified subcontractors must hold a valid California Contractors License and be registered with the Department of Industrial Relations per Section 1725.5 of the Public Contract Code. Additionally, subcontractors may be required to provide payment and performance bonds totaling 100 percent of their bid, with bond premiums reimbursed up to 1.5 percent. All selected subcontractors must execute the standard subcontract agreement and insurance requirements of W.A. Rasic Construction Company, Inc.
W.A. Rasic Construction Company

POSTED

about 14 hours ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS