Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Maryland was posted on November 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Federal Ave Storm Inlet

Closed
BPM054319State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
26-037-CIP
Solicitation # 26-037-CIP
The SportsOhio PowerPlay Demolition project, identified as solicitation 26-037-CIP, is a City of Dublin, Ohio, contract for the demolition and restoration of specific areas at 6314 Cosgray Road. The scope of work includes the removal of the Can-Am/go cart track, batting cages, a concrete seating pad, associated walkway connections, and a mini golf course. The project has an engineer's estimate of $259,606.50 and must be completed by April 30, 2027. Key technical requirements include adhering to the 2026 City of Dublin and City of Columbus Construction and Material Specifications, following National Electric and Safety Codes, and ensuring tree clearing occurs specifically between October 1 and March 31. Bids are submitted via Bid Express and are evaluated based on a lowest and best analysis, with a strong preference for Ohio-based bidders or those from reciprocal border states. Qualified bidders must provide a bid guaranty per the Ohio Revised Code, evidence of similar experience, and a noncollusion affidavit. The contract mandates the payment of prevailing wages and requires the use of domestic source end products. Payment is structured monthly at a rate of 95% until the work is 50% complete, after which the retention amount may be reduced at the City's discretion. All inspections are managed by the City of Dublin, though the contractor must coordinate utility abandonment inspections with AEP, Columbia Gas, and other communications companies.
City of Dublin, OH - Engineering

POSTED

about 9 hours ago

DEADLINE

in 16 days
NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 12 hours ago

DEADLINE

in 6 days
NAICS: 238910
New
Federal
Y--Hickman Wildlife Water Catchment and Pipe Fence
Solicitation # 140L1726Q0054
Solicitation 140L1726Q0054 is a Total Small Business Set-Aside request for quote issued by the Department of the Interior, Bureau of Land Management, for the Hickman Wildlife Water Catchment and Pipe Fence project in Socorro County, New Mexico. The project is a firm-fixed-price contract involving the demolition and removal of existing infrastructure and the construction of a 1,000 square-foot metal catchment consisting of two 20 by 25 foot structures with galvanized gutters and propanel tops. Additionally, the contractor is required to install two BOSS tanks and erect 1,000 linear feet of pipe-and-cable fencing. The updated period of performance is scheduled from November 17, 2026, to January 25, 2027. Award will be based on the most advantageous offer, with price serving as the primary factor, followed by technical approach, nongovernmental experience, and a detailed work breakdown schedule illustrating the critical path. Contractors must adhere to Davis-Bacon wage determinations for Socorro County and comply with OSHA, EPA, and ADA regulations. Key submission requirements include a signed SF 1442, a price schedule, and a payment bond or irrevocable letter of credit due within 10 days of award. The final deadline for proposal submission is November 9, 2026, at 3:00 PM ET, with a site visit scheduled for October 29, 2026, at the Socorro Field Office.
New Mexico State Office

POSTED

about 16 hours ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The contract involves addressing persistent drainage issues on Federal Avenue in Emmitsburg, Maryland, specifically the segment between East Main Street and East North Avenue. Due to aging, partially clogged, and undersized storm drainpipes and inlets, heavy rainfall causes water to pond on the road. In response, the Town of Emmitsburg commissioned RK&K in 2025 to assess the drainage system and develop improvement plans. The finalized design, dated November 6, 2025, calls for removing the old pipes, installing new 18-inch reinforced concrete pipes, constructing two additional storm drain inlets, and regrading the area to ensure better water flow into the system. The selected contractor will be responsible for providing all necessary labor, materials, equipment, and incidentals to complete the work as detailed in the RK&K contract drawings. Key tasks include demolition and removal of the existing storm drain infrastructure, installation of the new reinforced concrete pipes, connection to existing inlets, construction of two new storm drain inlets, grading, surface restoration, erosion and sediment control, traffic maintenance, and final site stabilization and cleanup. The solicitation for this project was posted on November 26, 2025, with a response deadline of January 9, 2026, under solicitation number BPM054319, and is managed by the Town of Emmitsburg with Sabrina King as the primary contact.

General Info

Drainage improvements on Federal Avenue, Emmitsburg: new pipes, inlets, grading, and restoration works.

Agency

Maryland → Town of Emmitsburg

Place of Performance

MD, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMaryland → Town of Emmitsburg
Contacts1 person available
OfficeN/A
Organization / Agency
Maryland → Town of Emmitsburg
Office AddressN/A
Contacts

Full Description

Show more
A portion of a street named Federal Avenue in Emmitsburg, Maryland (between East Main Street and East North Avenue), has experienced ongoing drainage problems. During heavy rain, water often ponds in the roadway since the existing storm drainpipes and inlets are old, partially clogged, and undersized. To address this concern, the Town hired RK&K in 2025 to evaluate the drainage system and design necessary improvements. The final plans (dated November 6, 2025), recommend removing the deteriorated pipes, installing new 18-inch reinforced concrete pipe, building two new storm drain inlets, and making grading adjustments to allow water flow into the system properly.The selected contractor shall provide all labor, materials, equipment, and incidentals required to complete the project as shown on the contract drawings prepared by RK&K, dated November 6, 2025. Major work items include, but are not limited to, demolition/removal of existing storm drain pipe and inlets, installing new 18” reinforced concrete pipe (RCP) storm drain, connecting to existing storm drain inlets and installing two (2) new inlets, grading and surface restoration, erosion & sediment control, maintenance of traffic, and final stabilization and cleanup

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS