Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Fence Post & Hardware Supply

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Defense → Navfacsyscom Mid-AtlanticView Agency

NAICS

423510 - Metal Service Centers and Other Metal Merchant WholesalersView NAICS

Place of Performance

Camp Lejeune, NC, 28547, USA

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navfacsyscom Mid-Atlantic
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → Navfacsyscom Mid-Atlantic
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply of galvanized steel fence posts, rails, tension bands, hinges, latches, and anti-climb components meeting military or ASTM specifications for government fencing repairs.

Similar Contracts

Same NAICS industry code

NAICS: 423510
New
DIBBS
PLATE, METALThis contract specifies the procurement of 6 plate meters of corrosion-resistant, aircraft-quality steel plate made from alloy 4340, hot rolled and annealed, with a thickness of 0.500 inches, width of 36 inches, and length of 96 inches, delivered in whole-foot increments. The material must comply with technical and quality standards referenced in the DLA Master List, including SAE AMS6359, ASTM A700-14, MIL-STD-129R, and SAE AMS2807C, and must be accompanied by a Certificate of Quality Compliance with every shipment, submitted to the DLA Troop Support Contracting Officer. Each unit must be permanently marked with the DLA contract number, NSN, specification revision, alloy and temper, manufacturer’s name, heat and lot numbers, and dimensions using approved methods such as stenciling or stamping, ensuring legibility and resistance to fading or contamination. Adhesive labels are required for smaller bars and tubes, and all packaging must conform to MIL-STD-2073-1E and DLA packaging requirements, with preservation methods per ASTM A700 and marking per MIL-STD-129. Only suppliers listed on the Qualified Suppliers List for Distributors (QSLD) are eligible to respond, and any deviations must be explicitly declared; non-compliant submissions are considered unauthorized substitutions with potential criminal and civil penalties. The contract includes a firm fixed price with zero variance tolerance, destination inspection and acceptance points, and FOB origin delivery terms with a 30-day allowable delivery window after award. The material must be palletized and packed to prevent physical damage, using clean, dry cushioning materials compatible with the product, and all shipments must include dual-unit quantity markings if applicable. The designated delivery location is the DLA Distribution Depot in Tinker AFB, Oklahoma, and the procurement is governed by DLA procedural notes regarding transportation and government use, with a material need date of July 1, 2026. All documentation, including CDRL-METALSCERT and quality conformance records, must align with the referenced Technical Data Package revisions and DLA directives.
DEPOT OKLAHOMA

POSTED

2 days ago

DEADLINE

in 3 days
View Details

More opportunities from Department Of Defense → Navfacsyscom Mid-Atlantic

Same awarding agency

NAICS: 236220
New
Federal
Repairs to Building 3918 to Relocate USMC Post OfficeThis procurement is a total small business set-aside under NAICS code 236220 for repairs to Building 3918 at Marine Corps Air Station Cherry Point, North Carolina, to relocate the USMC Post Office, including the demolition of Building 153 and related incidental work. Only contractors listed on the General MACC contractor roster are eligible to submit proposals, and the solicitation is restricted to this group. The basis for award is lowest price, with the government evaluating total offer prices by combining the base requirement and all optional items, and applying cost adjustments for foreign materials under the Buy American statute if applicable. The work involves comprehensive renovation, including installation of loading dock equipment, relocation of food service equipment, building commissioning, electrical systems meeting NFPA 70 and NEMA 250 standards, and strict compliance with safety regulations including USACE EM 385-1-1, 29 CFR 1926.1101, and 40 CFR Part 61 and 763 for asbestos handling. All materials must be delivered in original manufacturer packaging, stored in clean, dry conditions, and must not be manufactured more than one year prior to delivery, with some items limited to six months. Piping systems require MIL-STD-101 color coding and precise labeling with specified lettering sizes, while steel studs must be marked with ICC number, manufacturer ID, steel thickness, coating designator, and yield strength. Asbestos sample results and certifications are documented in attached appendices, and all construction drawings including reflected ceiling plans, roof, elevations, door schedules, and equipment plans must be strictly followed. Offers must be submitted via SAM.gov by the deadline of July 30, 2026, with pre-proposal inquiries due by June 29, 2026. The contract requires use of NAVFAC’s eCMS for all technical submittals, with no email or paper submissions permitted unless explicitly allowed. Invoices must be submitted through WAWF with attachments under two megabytes, and each payment request must include a signed certificate from the QC Manager verifying compliance and current as-built drawings. Performance and payment bonds are required for bids exceeding $150,000, while payment bonds alone are required for bids between $35,000 and $150,000. Contractors must adhere to ADA requirements, prohibit disclosure of PII, CUI, or classified information
Commercial and Institutional Building Construction

POSTED

about 16 hours ago

DEADLINE

in 5 days
View Details
NAICS: 238220
New
Federal
Boiler Maintenance & RepairThis contract is for boiler maintenance and repair services at the Naval Submarine Base New London in Groton, Connecticut, under a Firm-Fixed-Price, Indefinite-Delivery, Indefinite-Quantity (FFP IDIQ) arrangement. The contract includes a one-year base period with four consecutive one-year option periods, spanning a potential total performance period from September 28, 2026, through September 27, 2031. A minimum guarantee is in place for the base period, and the total estimated contract value ranges from $544,900 to $2,741,900, based on the base and four option years' fixed pricing for unit-priced labor work subject to the Davis-Bacon Act. Work must be performed at the specified location, with all necessary labor, materials, equipment, supervision, and transportation provided by the contractor under an AS-IS condition assumption. The contract is issued under NAICS Code 238220, with a small business size standard of $19.0 million, and is unrestricted in competition. Offerors must be registered and active in the System for Award Management (SAM), and failure to maintain SAM registration renders them ineligible for award. Evaluation will follow the Lowest Price Technically Acceptable (LPTA) method, prioritizing price while requiring technically acceptable proposals across three factors: corporate experience, past performance, and price, listed in descending order of importance. Technical acceptability hinges on demonstrated experience with similar equipment, qualifications of key personnel and subcontractors, and documented performance history, where an “Unacceptable” rating in any factor results in disqualification. The contractor must comply with extensive performance standards outlined in annexes and attachments, including adherence to NFPA 704 for hazardous material labeling, corrosion prevention, and moisture control for boiler systems. The contractor must implement an Earned Value Management System compliant with EIA-748, maintain a system for contractor incident reporting and quality inspections, and ensure personnel have Personal Identity Verification (PIV) credentials. Invoicing must be processed through Wide Area WorkFlow (WAWF), with payments routed to N68732, and all labor costs must be adjusted to reflect updated Davis-Bacon wage determinations upon option exercise. Submission of proposals is electronic via email to the designated POC by September 3, 2026, at 4:00 PM EST, and must include the SF-1449,
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 16 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
Design-Bid-Build, P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, ConnecticutThe contract solicitation N4008526R0004, issued by NAVFACSYSCOM Mid-Atlantic, seeks a contractor to design and construct the P-1102 Weapons Magazine and Ordnance Operations Facility at Naval Submarine Base New London in Groton, Connecticut. The project encompasses the construction of Type G and H weapons magazines, an ordnance operations building, a sentry building, associated site work, and demolition of existing structures, with a focus on electrical systems, grounding, bonding, and integration of secure infrastructure compliant with military and federal standards. Performance must comply with stringent security, safety, and environmental regulations, including adherence to MIL-STD-129, MIL-STD-1320, MIL-STD-1322, and MIL-STD-1323 for packaging and unit loads of hazardous materials; compliance with 49 CFR and DoD cybersecurity requirements as outlined in NIST SP 800-171; and strict adherence to explosive safety protocols under DESR 6055.09 and HERO standards. All personnel must be U.S. citizens, with pre-submission security verifications required, and key personnel—including the project superintendent, post-installed anchor installers, and special inspectors—must meet specific experience, training, and certification thresholds. The contract requires submission of detailed shop drawings, samples, certificates, as-built documentation, and O&M manuals through an electronic submittal register system, with inspections and final acceptance conducted on-site by government representatives. Invoicing must be submitted electronically via WAWF using NAVFAC Form 7300/30 with attachments not exceeding 2 MB. Corporate experience is a primary evaluation factor, requiring offerors to demonstrate past performance in projects of at least 3,000 square feet in building/structures, 1,500 linear feet of road construction, and comparable demolition work. Options for shutdowns, AV/FF&E, project management, and additional costs are included but are not binding; exercise requires consent of surety and additional bonding. Packaging and marking must meet exacting standards, including durable “EMPTY” labeling for containers, obliteration of prior hazardous material markings, and 2D barcoding in accordance with MIL-STD-129. No contract value or pricing data is disclosed, and the award methodology—whether LPTA or trade-off—is not specified. The response deadline is September 1,
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 334512
New
Federal
Market research for brand-name specifications for Direct Digital Controllers utilizing software for Configuration/Programming and for Connection to the EMCS located at various government installations located in the Hampton Roads area, VirginiaThe U.S. Navy’s Naval Facilities Engineering Systems Command, Mid-Atlantic is conducting market research to identify potential sources of Direct Digital Controllers compatible with established building automation software platforms—specifically Automated Logic Corporation’s WebCTRL and EIKON, Johnson Controls’ Metasys, and Siemens’ Desigo and Apogee systems—for use in HVAC control across multiple government installations in the Hampton Roads, Virginia area. These controllers must be capable of seamless integration with existing Energy Management Control Systems and must support Authority to Operate certification under Department of Defense cybersecurity directives. The research aims to justify the use of brand-name specifications under statutory authority for limited competition, based on the Government’s need to maintain uniformity, reduce operational complexity, leverage existing licensed software investments, and ensure cybersecurity compliance across a portfolio of projects spanning Fiscal Years 2026 to 2031. Responses must include detailed technical information on commercially available Direct Digital Controllers programmed using the specified software, including model numbers, applications, communication protocols, and manufacturer data sheets, along with documentation of at least one to three real-world installations where non-manufacturer controllers were successfully configured using the prescribed software platforms. Participants must provide company details and project-specific information such as customer contacts, narratives of work performed, and, if available, contract numbers and values. All submissions are due electronically by 2:00 p.m. EST on August 6, 2026, and must clearly mark proprietary information as such to ensure confidentiality; responses are strictly for market research purposes, with no obligation or promise of future procurement implied. Submissions are limited to electronic format, and late or incomplete responses will be rejected without consideration.
Automatic Environmental Control Manufacturing for Residential, Commercial, and Appliance Use

POSTED

1 day ago

DEADLINE

in 13 days
View Details
NAICS: 236220
New
Federal
Multiple Location BEQ Chiller Loop Flushing and Chemical CleaningThis contract, identified by solicitation number N4008526R9049 and titled Multiple Location BEQ Chiller Loop Flushing and Chemical Cleaning, is a Total Small Business Set-Aside under FAR 19.5 and NAICS code 236220, reserved exclusively for small businesses. Only Mechanical MACC Contractors listed on the General Requirements cover page are eligible to submit proposals, and responses must be sent via email to the designated point of contact by the deadline of August 19, 2026. The work involves the heated chemical cleaning, flushing, and passivation of chilled water closed-loop systems serving Bachelor Enlisted Quarters at Marine Corps Base Camp Lejeune, North Carolina, requiring the removal of organic soil, hydrocarbons, flux, pipe mill varnish, pipe compounds, and iron oxide—excluding tightly adherent mill scale. The operation must be conducted without disrupting facility functions and requires adherence to UFGS 23 25 00 and Section 23 24 00 standards, along with Marine Corps Base Camp Lejeune administrative specifications. Execution phases include circulating a heated solution at 120°F for a minimum of 48 hours through the primary loop, followed by 48 hours through terminal units, a final fresh water flush until water clarity is perfectly clear, manual cleaning of all strainers and screens, and chemical passivation to prescribed parameters including sodium sulfite, sodium lauroly sarcosinate, and a system pH between 8.5 and 9.5. The contract incorporates comprehensive Federal Acquisition Regulation and Defense Federal Acquisition Regulation Supplement clauses covering material and workmanship, specifications and drawings, security requirements (Alternate II), prompt payment, payment procedures for fixed-price construction, progress payments, Wide Area WorkFlow payment instructions, Buy American requirements for construction materials, and modification proposals. Environmental compliance is strictly enforced, with contractors required to follow MCIEAST environmental policies and use approved forms for spill reporting, SAA inspections, and hazardous waste storage. Hazardous materials including asbestos and lead-based paint must be packaged and labeled according to federal regulations: asbestos requires double-wrapping in 6-mil plastic sealed with duct tape and proper manifesting, while lead-painted wood must be cut to under eight feet and wrapped in sealed 6-mil plastic. All hazardous waste must comply with 40 CFR 261, 262, and 263. Contractors must submit a
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 26 days
View Details
NAICS: 334515
New
Federal
Determine the availability of Advanced Metering Infrastructure (AMI) electric meter devices with stated salient characteristics from responsible sources, NAVFAC MIDLANT AORThe Naval Facilities Engineering Systems Command, Mid-Atlantic, is conducting market research to assess the availability of Advanced Metering Infrastructure electric meter devices compatible with either Schneider Electric’s EcoStruxure Power Monitoring Expert software or Electro Industries/GaugeTech’s CommPQA software. These meters must be capable of measuring and transmitting electrical data, connecting to existing AMI systems across NAVFAC MIDLANT installations in Maine, Rhode Island, Connecticut, New Jersey, Pennsylvania, Indiana, Illinois, and Virginia, and obtaining and maintaining Department of Defense Authority to Operate certification under DODI 8500.01 and DODI 8510.01. The government is evaluating whether alternative products can meet its needs or if exclusivity to Schneider or EIG devices remains necessary, based on the current use of ION 8600, ION 8650, ION 9200, Shark 250, and Shark 270 meters across its installations. The intent is to support future Class Justifications and Approvals from FY2026 to FY2031 that may justify limited competition under 10 U.S.C. 3204(a)(1) due to the necessity of integrating with established software ecosystems, ensuring cybersecurity, and minimizing operational complexity for maintenance personnel. Interested parties must respond with company details, a list of commercially available meters that work with the specified Schneider or EIG software platforms including model numbers, product descriptions, applications, communication protocols, and technical documentation, along with up to three examples of successful field installations where non-Schneider or non-EIG meters were configured using these software tools. Each project submission must include point of contact information, a narrative description, and any available contract details. All responses must be submitted electronically to Holly Manning by 2:00 p.m. EST on August 6, 2026; no hardcopy or fax submissions will be accepted. This notice is strictly for market research and does not constitute a solicitation, commitment, or guarantee of future procurement. The government will not reimburse response costs or provide debriefings, and all proprietary information submitted will remain confidential within government channels.
Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals

POSTED

1 day ago

DEADLINE

in 13 days
View Details
NAICS: 236220
New
Federal
Repair BEQ FC555This contract, titled Repair BEQ FC555 and solicited under number N4008526R9043, is a Total Small Business Set-Aside under NAICS code 236220, restricted to General MACC Contractors listed on the General Requirements cover page. The work is located at Marine Corps Base Camp Lejeune, North Carolina, and involves the comprehensive repair and renovation of Bachelor Enlisted Quarters building FC555, including the demolition of existing mechanical building FC556 and construction of a new mechanical facility adjacent to FC555. Scope encompasses civil and utility work such as utility extensions for public sewer, domestic water, fire water, and mechanical piping; sidewalk replacement; parking lot milling, overlaying, and striping; trash dumpster enclosure construction; and grading improvements. Landscaping is offered as an optional item. The project requires strict adherence to specifications, drawings, and technical appendices including asbestos and lead surveys, fire protection design analysis, geotechnical reports, and building information checklists, with all materials required to be delivered in manufacturer’s original, unbroken packaging with proper labeling per MIL-STD-101 and detailed manufacturer specifications. Contract performance is governed by multiple FAR clauses including those for prompt payment, fixed-price payment terms, progress payments, material and workmanship standards, and construction specifications and drawings, with specific requirements for hazardous material handling, environmental compliance, and Buy American Act evaluations. The contract includes detailed pricing through 12 ELINs covering interior renovations, lightning protection, parking lot and sidewalk work, unforeseen asbestos and lead removal, soil and utility replacement, formal partnering, roof repairs, and landscaping. Payment is tied to the submission and acceptance of a detailed Schedule of Prices, invoicing via WAWF within five calendar days of invoice date, and adherence to strict material age limits—no product older than one year may be used, with some items limited to six months. Performance is due within 910 days of award, with mandatory pre-inspection notifications, contractor representation by qualified personnel during inspections, and compliance with EM 385-1-1 safety standards requiring an assigned Site Safety and Health Officer and electronic documentation via eCMS. All project data is unclassified per Department of Navy guidance, ADA accessibility standards apply, and proposals must be submitted by email with required bid, payment, and performance bonds depending on value, with bid bonds at 20% of proposal amount if required. The offeror must be
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 7 days
View Details
NAICS: 236220
New
Federal
Repair BEQ G702/G703Only General MACC Contractors listed on the General Requirements cover page are eligible to submit proposals for this repair project targeting BEQ G702 and G703 at Camp Lejeune, North Carolina. The solicitation, numbered N4008526R9050, is a fixed-price construction contract set aside entirely for small businesses under FAR 19.5, with a NAICS code of 236220, and operates under a Lowest Price Technically Acceptable (LPTA) evaluation methodology where technical acceptability serves as a pass/fail gate before price is considered. Proposals must be submitted by August 12, 2026, via email to two designated Navy points of contact and must include one original hard copy and one CD-ROM, each in separate three-ring binders, with full compliance required on all ELINs from 0001 through 0023; failure to address any line item may result in rejection. The contract encompasses a wide range of construction activities including unforeseen lead and asbestos abatement, soil and utility replacement, roof repairs, landscaping, and formal partnering, with specific quantities defined for each item. Technical compliance is mandatory and includes submission of a Baseline Construction Schedule with Primavera P6 compatibility, weekly Three-Week Look Ahead schedules, comprehensive submittals for shop drawings and product data, adherence to the Three Phases of Control for Quality Assurance, and full documentation of as-built and record drawings. Contractors must comply with strict material handling and storage standards per MIL-STD-129, including protection from moisture, heat, and off-gassing materials, and must ensure all insulation, piping, and gaskets are properly stored. Key personnel requirements mandate a full-time on-site Superintendent with five years of relevant experience and an OSHA 30-hour certification. All work must conform to the latest applicable codes across architectural, structural, mechanical, electrical, telecommunications, and plumbing disciplines, with firestopping and electrical systems subject to independent testing by a first-tier subcontractor. Payment is governed by FAR 52.232-5 and FAR 52.232-27, requiring invoices on NAVFAC Form 7300/30, signed and certified by the Quality Control Manager, and submitted within five calendar days of the invoice date, with final payment contingent upon submission of the Contractor’s Final Release and Transportation of Supplies by Sea certification. Insurance must meet FAR
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 19 days
View Details
NAICS: 236220
New
Federal
Design-Build (DB) Barracks Initiative (Package #2), Marine Corps Base (MCB) Camp Lejeune, North CarolinaThis solicitation seeks qualified offerors for a Design-Build project to replace five existing Bachelor Enlisted Quarters at Marine Corps Base Camp Lejeune and Marine Corps Air Station New River in North Carolina, with the goal of providing new billeting capacity for 1,130 personnel through 565 two-person rooms. The project includes demolition of BEQs HP51, HP53, HP55, HP57, and BEQ 1340 at Camp Lejeune, and BEQ AS4200 along with support buildings AS4201 and AS4024 at New River, followed by the construction of two new three-story barracks buildings at Hadnot Point totaling 300 rooms, equipped with comprehensive community amenities such as laundry, community kitchens, administrative offices, mechanical and telecommunications rooms, and recreation shelters. The acquisition is structured as a two-phase process, with this solicitation covering only Phase One, Factors 1 through 4, and Phase Two — including pricing and Factors 5 and 6 — reserved for select offerors. The contract is fixed-price, with a performance period of 1,461 calendar days from notice to proceed, and all work must commence within 15 days of that notice. Evaluation is merit-based, with non-price factors — Technical Approach, Experience, Safety, Technical Solution, and Small Business Utilization — being significantly more important than price, and failure to meet any pass/fail gate, including a Deficiency or Unacceptable rating in any non-price factor, renders an offeror ineligible. The solicitation enforces stringent compliance with federal and Department of Defense standards including DFARS 252.204-7025 and 252.204-7021, requiring CMMC Level 1 self-certification, and mandates adherence to EM 385-1-1 for all safety and health practices, with a Site Safety and Health Officer required to be present on-site at all times during construction. The contractor must establish a qualified Quality Control organization including a QC Manager, Design Quality Manager, and SSHO, with personnel changes requiring prior written approval. All inspections, testing, and quality documentation must follow UFGS specifications, with tests performed only by U.S. Army Corps of Engineers-approved labs or on-site certified facilities, and mandatory monthly submittals including certified payrolls, safety checklists, progress schedules, and testing logs. Payment is tied to strict invo
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in about 1 year
View Details
NAICS: 236220
New
Federal
Overhaul Elevator, Building 4224 (FRCE)This procurement for the overhaul of Elevator Building 4224 at MCAS Cherry Point, North Carolina, is a Total Small Business Set-Aside under NAICS code 236220, restricted exclusively to General MACC contractors listed on the RFP cover letter. The work involves replacing the elevator system and all related incidental tasks, with a mandatory 300 calendar day completion period. The contract incorporates key Federal Acquisition Regulation clauses including Prompt Payment and Payments Under Fixed-Price Construction Contracts, Buy American requirements for construction materials, and specific provisions for operations and storage areas, schedules, protection of existing infrastructure, and adherence to specifications and drawings. All materials must be delivered in manufacturer’s undamaged, unopened commercial containers with clear labeling per specification, and stored under strict environmental controls to prevent damage, moisture, contamination, or exposure to off-gassing substances. Elevator acceptance requires full compliance with ASME A17.2 standards, conducted in the presence of a NAVFAC-certified Qualified Elevator Inspector who must provide written test data and certification, with the contractor bearing all costs for re-inspection if initial tests fail. Testing demands specialized calibrated instruments and a one-hour endurance run under load, while firestopping must include a final inspection report submitted 14 days prior to government acceptance, with potential for destructive testing at no cost to the government. Invoicing is strictly through Wide-Area Workflow with each monthly invoice submitted within five calendar days, accompanied by a QC Manager-signed certification that as-built drawings are current and work complies with contract requirements; final payment requires a Final Release Form and Transportation of Supplies by Sea certification. Contractors must maintain a current schedule with a 3-week look-ahead and submit operation and maintenance data no later than two months before beneficial occupancy. Bonding is tiered: proposals under $35,000 require no bonds, those between $35,000 and $150,000 require only a payment bond, and proposals exceeding $150,000 require a bid bond with payment and performance bonds due upon award. Compliance with USACE EM 385-1-1 safety standards, ADA accessibility guidelines, and local MCAS Cherry Point environmental and traffic control directives is mandatory. Proposals must be submitted via email to specified addresses by 1200 local time on July 8, 2026, with site access requests due by June 17, 2026, and pre-proposal
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 5 days
View Details