This Solicitation opportunity from Department Of Defense was posted on September 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Solicitation N4008526R0004 is a Design-Bid-Build project for the P1102 Weapons Magazine and Ordnance Operations Facility at Naval Submarine Base New London in Groton, Connecticut. The scope of work includes the construction of six Containerized Long Weapons Storage magazines, two Box G magazines, and one Box H earth-covered high-explosive magazine, along with a new Ordnance Operations building, a Sentry building, and a Truck Inspection area. The project also requires the demolition of 18 existing magazines and Buildings 393 and 524. Technical requirements emphasize specialized foundations using rigid inclusions and load transfer mats, reinforced EPDM waterproofing, and the installation of intrusion detection systems. The estimated magnitude of construction is between 200 million and 250 million dollars.
The contract is a Firm Fixed Price award with a total period of performance estimated between 1,707 and 2,261 calendar days. Key administrative requirements include a minimum 20 percent small business subcontracting commitment and strict adherence to NAVSEA OP 5 safety regulations for ammunition and explosives. Security is paramount, requiring all personnel to undergo vetting via SECNAV 5512 for base access and compliance with cybersecurity standards for facility-related control systems. Proposals must be submitted electronically via the PIEE Solicitation Module in PDF format, accompanied by a bid bond of 20 percent of the total bid price or 3 million dollars, whichever is less. Evaluation is based on a combination of price and non-price factors, including corporate experience in building, road construction, and demolition.
General Info
Design-Bid-Build construction of weapons magazines in Connecticut costing 200 to 250 million dollars.
Naval Submarine Base New London, Groton, Connecticut, Groton, CT, USA
Set-Aside
NONE
Documents
82
PDF
PDF, High priority: read this first51 pages · specifications
HighAI Summary for A-14 Landscape Plan and Electrical Notes: Landscape and electrical design sheet excerpts, including A1 grading and drainage plan, landscape plan area C, vegetative slope stabilization requirements, and general electrical demolition and installation notes. The document includes keyed notes, legends, planting mixes and seeding rates, erosion control requirements, mounting height schedule, voltage drop guidance, and demolition procedures. It appears to be part of a design/construction drawing set with civil, landscape, and electrical coordination details.
PDF
PDF, High priority: read this first15 pages · amendment
HighAI Summary for Amendment 0001 to Solicitation N4008526R0004 for Weapons Magazine Facility: This document is Amendment 0001 to Solicitation N4008526R0004 dated 02 Mar 2026, effective 04 Mar 2026. It modifies the original solicitation for the Design-Bid-Build P1102 Weapons Magazine & Ordnance Operations Facility at Naval Submarine Base, New London, CT. Key updates include revised instructions in Section 00 21 00, addition of Attachment I (Site Visit Map) and Attachment J (SECNAV 5512), and inclusion of a wage determination for construction labor. A site visit is scheduled for 26 March 2026 with detailed base access instructions. The amendment requires acknowledgment by offerors and maintains all other terms and conditions of the original solicitation.
PDF
PDF, High priority: read this first2 pages · amendment
HighAI Summary for Amendment 0002 Pre-proposal Inquiry Responses: This document is Amendment 0002 providing responses to Pre-proposal Inquiries (PPIs) related to a solicitation. It addresses questions on pricing options, award timing, wage determinations, CAD file availability, site visit procedures, and submission of confidential financial information. The amendment clarifies that the wage determination applicable is detailed in Amendment 0002, confirms solicitation documents are not Controlled Unclassified Information (CUI), and provides guidance on proposal preparation and site visit logistics. The document is dated around early 2026 and is critical for bidders preparing proposals.
PDF
PDF, High priority: read this first11 pages · amendment
HighAI Summary for Amendment 0002 to Solicitation N4008526R0004 for Weapons Magazine Facility: This document is Amendment 0002 to Solicitation N4008526R0004, effective March 16, 2026, issued by NAVFACSYSCOM MID-ATLANTIC for the Design-Bid-Build of the P1102 Weapons Magazine & Ordnance Operations Facility at Naval Submarine Base, New London, Connecticut. The amendment includes responses to pre-proposal inquiries and updates to the wage determination for various construction trades in New London County, Connecticut. It modifies the original solicitation dated March 2, 2026, and requires acknowledgment by offerors. The document also references updated wage rates and fringe benefits for multiple construction labor categories, ensuring compliance with federal labor standards.
PDF
PDF, High priority: read this first2 pages · amendment
HighAI Summary for Amendment 0003 Pre-proposal Inquiry Responses: This document is Amendment 0003 providing responses to Pre-proposal Inquiries (PPIs) for a federal government construction project involving a Weapons Magazine Facility. It addresses questions about top bedrock elevation plans, geotechnical reports, compliance with the Build America Buy America Act (BABA), applicability of Unified Facilities Criteria (UFC) 3-520-01, and Unified Facilities Guide Specifications (UFGS). It also clarifies the availability of a plan holders list, restrictions on sources sought information, and confirms that Attachment H - Price Proposal Form will be part of the final contract. The amendment ensures bidders have critical clarifications for accurate bidding and compliance with project requirements.
PDF
PDF, High priority: read this first2 pages · amendment
HighAI Summary for Amendment 0003 to Solicitation N4008526R0004 for P1102 Weapons Magazine & Ordnance Operations Facility: This document is Amendment 0003 to Solicitation N4008526R0004, effective April 6, 2026, issued by NAVFACSYSCOM Mid-Atlantic. It modifies the original solicitation dated March 2, 2026, for the Design-Bid-Build project P1102 Weapons Magazine & Ordnance Operations Facility at Naval Submarine Base, New London, Connecticut. The amendment extends the offer receipt date and incorporates responses to pre-proposal inquiries and Attachment K - P1102 Site Visit Log. It also includes miscellaneous text additions to Section 00 50 00 - Contracting Forms and Supplements and supplementary conditions in Section 00 73 00. All other terms and conditions remain unchanged.
PDF
PDF, High priority: read this first1 page · amendment
HighAI Summary for Amendment 0004 Pre-proposal Inquiry Responses: This document is Amendment 0004 providing responses to Pre-proposal Inquiries (PPIs) related to a complex construction project. It addresses requests for extending the proposal due date, confirming past performance documentation, and clarifying site visit policies. The amendment confirms no second site visit will be accommodated and extends the proposal due date as referenced. It serves to clarify and update solicitation details for prospective offerors.
PDF
PDF, High priority: read this first10 pages · amendment
HighAI Summary for Amendment 0005 to Solicitation N4008526R0004 for Weapons Magazine Facility: This document is Amendment 0005 to Solicitation N4008526R0004 dated 02 Mar 2026, issued by NAVFACSYSCOM Mid-Atlantic. The amendment extends the proposal due date from 14 May 2026 to 25 June 2026, updates the Evaluation Factors for Award, and provides PPI responses. It includes detailed evaluation criteria for corporate experience in building/structures, road construction, and demolition projects relevant to the Design-Bid-Build P1102 Weapons Magazine & Ordnance Operations Facility at Naval Submarine Base, New London, Connecticut. The amendment requires acknowledgment of receipt and maintains all other terms and conditions of the original solicitation.
PDF
PDF, High priority: read this first71 pages · amendment
HighAI Summary for Amendment 0006 to Solicitation N4008526R0004 for P1102 Weapons Magazine & Ordnance Operations Facility: This document is Amendment 0006 to Solicitation N4008526R0004, effective 14 May 2026, issued by NAVFACSYSCOM MID-ATLANTIC. It modifies the original solicitation dated 02 Mar 2026 for the Design-Bid-Build project P1102 Weapons Magazine & Ordnance Operations Facility at Naval Submarine Base, New London, Connecticut. The amendment includes updated drawings, specifications, price proposal form, and several attachments related to explosive safety, permits, and training. It also updates clauses and provisions, incorporates FAR clauses with deviations, and provides justification and approvals. The amendment does not extend the offer receipt date but requires acknowledgment of receipt. All terms and conditions of the original solicitation remain unchanged except as modified herein.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 0007 Site Specific Data and Geotechnical Information: This document is Amendment 0007 to the contract, providing site specific data and geotechnical information for the project. It includes ultimate wind speed, exposure, risk categories, seismic design data, snow design data, and environmental severity classification. The amendment references a geotechnical engineering report dated 07 February 2025 by Jacobs and details foundation design requirements, foundation systems, and construction precautions such as preventing water or frost penetration and requirements for concrete placement. It also covers earthwork inspection and safety measures like sheeting, shoring, and bracing during excavation. The data is intended to inform design and development of standardized drawings as noted in referenced sheets.
PDF
PDF, High priority: read this first3 pages · amendment
HighAI Summary for Amendment 0007 Structural Drawings Sheet S-001: Amendment 0007 for drawing set P-1102, sheet S-001. The document contains structural general notes, design criteria, foundations, cast-in-place concrete requirements, security magazine door/internal locking device coordination notes, and structural abbreviations. It includes technical construction requirements, code references, material specifications, and coordination instructions relevant to the amended drawing package.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 0007 to Solicitation N4008526R0004 for P1102 Weapons Magazine & Ordnance Operations Facility: This document is Amendment 0007 to solicitation N4008526R0004 dated 02 Mar 2026, issued by NAVFACSYSCOM Mid-Atlantic. The amendment extends the proposal due date from 25 June 2026 to 28 July 2026 and incorporates updated drawings, specifications, PPI responses, applicable clauses, revised price proposal form, checklist POAM items, geotechnical investigation report, and an updated wage determination dated 18 May 2026. It includes detailed changes to procurement and contracting requirements, instructions, and supplementary conditions. The amendment requires acknowledgment by offerors and maintains all other terms and conditions unchanged.
PDF
PDF, High priority: read this first4 pages · amendment
HighAI Summary for Amendment 0008 to Solicitation N40085-26-R-0004 for Weapons Magazine & Ordnance Operations Facility: This document is Amendment 0008 dated 23 July 2026 to solicitation N40085-26-R-0004 for the Design-Bid-Build (DBB) project P1102 Weapons Magazine & Ordnance Operations Facility at Naval Submarine Base, New London, Connecticut. The amendment extends the proposal due date from 28 July 2026 to 1 September 2026 and deletes certain DFARS clauses related to employment disclosures concerning the People's Republic of China. It also adds supplementary conditions and notes that no additional PPI submissions will be accepted after 6 August 2026. The amendment requires acknowledgment by offerors prior to the new due date.
PDF
PDF, High priority: read this first35 pages · amendment
HighAI Summary for Amendment 0009 to N40085-26-R-0004 Design-Bid-Build P1102 Weapons Magazine Facility: This document is Amendment 0009 to solicitation N40085-26-R-0004 for the Design-Bid-Build construction of the P1102 Weapons Magazine & Ordnance Operations Facility at Naval Submarine Base New London, Connecticut. Issued to update and incorporate continuation sheets for drawings and specifications, updated drawings and specifications, revised evaluation factors for award, revised price proposal form, new attachments including soil management SOP, updated clauses and provisions, and responses to PPI. It includes detailed changes to contract conditions, liquidated damages, construction phasing plans, and special scheduling requirements with milestone adjustments. The amendment also revises several specification sections dated July 28, 2026, and updates construction and environmental control requirements.
PDF
PDF, High priority: read this first10 pages · amendment
HighAI Summary for Amendment 0014 – Section 01 14 00 Work Restrictions: Amendment dated 29 September 2026 for Section 01 14 00, Work Restrictions. The document provides detailed phasing, safety, security, and scheduling requirements for construction near operational magazines, including submittal requirements, government approvals, and milestone durations. It covers access control, wetlands restrictions, blasting/excavation constraints, demolition and construction sequencing, and phased work for multiple magazine and facility areas.
PDF
PDF, High priority: read this first3 pages · amendment
HighAI Summary for Amendment N4008526R00040004 to Solicitation N4008526R0004: This document is Amendment 0004 to Solicitation N4008526R0004 dated 02 Mar 2026, effective 16 Apr 2026. It extends the proposal due date from 30 April 2026 to 14 May 2026, provides responses to pre-proposal inquiries, and updates Attachment F (Small Business Participation Commitment) and Attachment G (Individual Small Business Subcontracting Plan). The amendment applies to the Design-Bid-Build project for the P1102 Weapons Magazine & Ordnance Operations Facility at Naval Submarine Base, New London, Connecticut. All other terms and conditions remain unchanged.
DOCX
DOCX, High priority: read this first13 pages · sow
HighAI Summary for Appendix A Air Leakage Test Form: Appendix A air leakage test form for buildings constructed in compliance with the U.S. Army Corps of Engineers Air Leakage Protocol. It captures building and testing agency information, witness details, photo documentation, envelope surface area calculations, allowable leakage rates, setup checklist items, and pressure test procedures. The form references SECTION 07 27 10 Building Air Barrier System and includes differential pressure and airflow requirements, acceptable test ranges, and reporting instructions for the air leakage evaluation.
DOCX
DOCX, High priority: read this first2 pages · specifications
HighAI Summary for Appendix B Air Leakage Test Results Form: Appendix B air leakage test results form for building envelope compliance. The form requires the testing agency to certify setup conditions, equipment calibration, procedure compliance, calculations under ASTM E 779 or related air barrier testing specifications, and the average leakage rate at 75 Pa. It also documents pass/fail criteria, required supporting documentation, initials, signature, printed name, and date. No explicit date is shown in the excerpt.
XLSX
XLSX, High priority: read this first5 pages · sow
HighAI Summary for Appendix D - Air Leakage Rate by Fan Pressurization: Appendix D data sheet for Air Leakage Rate by Fan Pressurization using ASTM E 779-10. The spreadsheet captures building, contractor, and testing agency information, test method and branch (Army/Navy/Air Force), pressure test requirements, building data, and test conditions. It includes required test data point counts, allowable leakage and confidence interval criteria, and sample building inputs such as elevation, envelope area, temperatures, wind speed, and bias pressure. Filename indicates this is an appendix supporting air leakage testing documentation.
PDF
PDF, High priority: read this first7 pages · supporting-document
HighAI Summary for Attachment E Historical Small Business Utilization N40085-26-R-0004: Attachment E Historical Small Business Utilization form for solicitation N40085-26-R-0004. This document is to be completed by all offerors to provide supporting information for evaluation of Factor 5, Small Business Utilization and Participation. It documents the offeror's historical small business utilization and achievements for each project submitted under Factor 1, Corporate Experience. The form includes instructions for completing project details, actual subcontracting values, goals, and explanations for unmet goals or no small business subcontracting achievement. It defines key terms such as total project dollar value, self-performed value, and subcontract value. The form is essential for evaluating subcontracting performance and compliance with small business goals.
PDF
PDF, High priority: read this first3 pages · small-business-participation-commitment
HighAI Summary for Attachment F - Small Business Participation Commitment Document for RFP N40085-26-R-0004: This document is Attachment F, the Small Business Participation Commitment Document (SBPD), associated with RFP N40085-26-R-0004 for the Weapons Magazine & Ordnance Operations Facility in New London, CT. It is a form to be completed by all offerors to commit to subcontracting with small businesses, supporting evaluation of Factor 5, Small Business Utilization and Participation. The form requires offeror information, subcontracting breakdown, and detailed small business participation data including dollar values and percentages of total contract value. It also requires explanations if minimum small business participation of 20% is not met or if subcontractors are not identified with firm commitments. The document includes instructions for both large and small business offerors and specifies the types of small business categories to be reported.
PDF
PDF, High priority: read this first13 pages · subcontracting-plan
HighAI Summary for Attachment G Individual Small Business Subcontracting Plan N40085-26-R-0004: This document is an Individual Small Business Subcontracting Plan template consistent with FAR 19.704 and FAR clause 52.219-9. It is intended for use by large businesses submitting subcontracting plans for contract N40085-26-R-0004 related to the P1102 Weapons Magazine & Ordnance Operations Facility in New London, CT. The plan establishes subcontracting goals for small business participation, including categories such as HUBZone, WOSB, SDB, VOSB, SDVOSB, AbilityOne, and Alaskan Native Corporations & Indian Tribes. It includes sections for contractor and review signatures, approval levels, and detailed breakdowns of subcontracting goals and rationale. The plan ensures compliance with federal regulations and requires supporting rationale for all proposed goals.
DOCX
DOCX, High priority: read this first7 pages · bid-price-schedule
HighAI Summary for ATTACHMENT H - Price Proposal Form REV4: Bid price schedule for Project P-1102 Magazine & Ordnance Operations Facility, Rev 4. It provides line item pricing instructions and bid entries for the base price and multiple option items, including demolition, construction of magazines and support buildings, site work, mass rock excavation, trench rock excavation, EPDM roof/covering option, electronic security system, and audio visual system. The schedule includes quantities, units, and notes on excavation assumptions, survey requirements, and documentation for rock excavation pricing.
PDF
PDF, High priority: read this first21 pages · specifications
HighAI Summary for FINAL DESIGN 1667770dwg2of2CLWS Lighting and Door Control Details: This document, titled FINAL DESIGN 1667770dwg2of2CLWS, contains detailed specifications for door control and lighting fixture schedules. It includes schematic design notes for door control, emphasizing compliance with local codes and manufacturer requirements. The lighting fixture schedule lists various LED fixtures with descriptions, mounting types, lamp types, input voltages, color temperatures, and other technical details. The document also outlines luminance requirements, certification standards, mounting options, and emergency backup features. The drawings are adapted from approved NAVFAC munitions storage construction documents, with approval dated 25 July 2024. This document serves as a technical specification for construction and installation purposes.
PDF
PDF, High priority: read this first55 pages · specifications
HighAI Summary for FINAL DESIGN 1667770dwg2of3 Operations Mechanical Room and HVAC Sequences: This document titled FINAL DESIGN 1667770dwg2of3 Operations contains detailed mechanical room sections and HVAC system sequences of operation. It includes general sheet notes on ductwork, equipment installation, and coordination with trades, emphasizing compliance with federal, state, and local codes. The document provides keynotes for mechanical room components, control panels, and outdoor air intakes. It also details air conditioning unit sequences of operation, including thermostat locations, communication wiring, emergency shut-off switches, duct temperature sensors, and timer switches connected to the building automation system (BAS). Additionally, the document contains a dedicated outside air system (DOAS) points schedule with control parameters for heat exchangers, bypass dampers, and supply air temperature control. The version or date is not explicitly stated but the content is technical and critical for HVAC installation and operation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for FINAL DESIGN 1667770dwg2of4 - Building 393 Exterior/Interior: Design drawing sheet package for Building 393, labeled FINAL DESIGN 1667770dwg2of4Site.pdf. The content includes general sheet notes, references to related civil and electrical sheets, traffic control and pavement restoration requirements, and building descriptions for exterior and interior conditions. It appears to be part of a construction design/specification set for an 800 SF single-story building, with material and structural details noted for walls, roof, windows, floors, ceilings, and doors.
PDF
PDF, High priority: read this first36 pages · specifications
HighAI Summary for FINAL DESIGN 1667770dwg3of3 Operations Telecom and Electrical Notes: This document titled FINAL DESIGN 1667770dwg3of3 Operations provides detailed general sheet notes and sheet keynotes related to telecommunications and electrical infrastructure for a government facility. It includes instructions for bonding cable trays, telecommunications racks, conduits, and infrastructure for security intrusion detection and access control systems. The document specifies conduit sizes, cable types (Category 6), patch panels, ductbank routing, and installation details for data outlets and wiring trays. It also references coordination requirements with other contractors and government IT for fiber optic cable termination and cutover. The notes emphasize compliance with standards such as ONSAM TEMPEST and provide installation details for junction boxes, conduit runs, and wiring pathways. The document is intended to guide the installation and integration of telecom and electrical systems in the operations building (BLDG A).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for FINAL DESIGN 1667770 Site Storm Drain and Grading Plans: This document contains detailed site design specifications for storm drain profiles and grading plans for project number 1667770. It includes vertical and horizontal profiles for storm drains, reinforced concrete pipe class requirements, and enlarged grading plans for stormwater management areas. The document provides technical drawings and general notes essential for construction and site management.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for FINAL DESIGN Retaining Wall and Electrical Details: This document titled 'FINAL DESIGN Retaining Wall and Electrical Details' includes adapted construction drawings from NAVFAC munitions storage documents, specifically for retaining wall elevation and electrical equipment installation. It contains detailed technical specifications such as scale drawings, general plow notes, arc flash warning label requirements, grounding bus bar details, and conduit installation notes. The document also provides safety and installation instructions, separation distances for power and data cables, and general project notes relevant to electrical and structural components. The version is indicated by the original filename FINAL+DESIGN_1667770dwg1of1TypeH.pdf.
PDF
PDF, High priority: read this first3 pages · justification-and-authorization
HighAI Summary for J&A for Rockfall Protection System in Solicitation N4008526R0004: This Justification and Approval (J&A) document authorizes the use of brand name specifications for the Geobrugg TECCO G65/4 Mesh Rockfall Protection System in solicitation N4008526R0004 for the Design Bid Build P1102 Weapons Magazine & Ordnance Operations Facility at Naval Submarine Base, New London, CT. The document details the statutory authority under 10 U.S.C. 3204(a)(1) permitting other than full and open competition due to the unique requirements of the rockfall protection system. It includes rationale for the brand name specification, efforts made to solicit other offers, determination of fair and reasonable cost, and actions to remove barriers to future competition. The document is certified by technical, legal, contracting officer, and approving officials.
PDF
PDF, High priority: read this first9 pages · justification-and-authorization
HighAI Summary for J&A for Use of Brand Name or Equal - Interior Finishes for Solicitation N40085-26-R-0004: This Justification and Approval (J&A) document authorizes the use of brand name or equal references in construction solicitations for interior color and finish selection related to solicitation N40085-26-R-0004. The project involves construction at Naval Submarine Base, New London, CT, including weapons storage magazines and related facilities. The J&A explains the necessity of brand name references to convey precise aesthetic and finish requirements while allowing for equivalent products to ensure competition. It cites statutory authority under 10 U.S.C. 3204(a)(1) and DFARS 211.104 for limited competition due to essential government requirements. The document references relevant Unified Facilities Criteria and Federal Acquisition Regulation clauses to justify the approach and ensure compliance with competition standards.
PDF
PDF, High priority: read this first3 pages · justification-and-authorization
HighAI Summary for J&A for Use of Brand Name Specifications in Solicitation N4008526R0004: This Justification and Approval (J&A) document authorizes the use of brand name specifications for specific Electronic Security System (ESS) components in solicitation N4008526R0004 for construction at Naval Submarine Base, New London, CT. It covers five ID Factors 2-Factor card readers, one Lenel power supply enclosure, and one Altronex power supply enclosure required for compatibility with existing systems. The document cites statutory authority 10 U.S.C. 3204(a)(1) for other than full and open competition, explains the rationale for brand name use, and details efforts to solicit offers, which yielded no alternative sources. It includes certifications and approvals by contracting and legal officials, ensuring the justification is complete, accurate, and legally sufficient.
PDF
PDF, High priority: read this first4 pages · justification-and-approval
HighAI Summary for Justification and Approval for Use of Other Than Full and Open Competition - Stormwater Products for N4008526R0004: This Justification and Approval (J&A) document authorizes the use of brand name specifications for specific stormwater management products by Contech Engineered Solutions in solicitation N4008526R0004 for construction at Naval Submarine Base, New London, Connecticut. The document, dated around 2025, details the need for these products to meet Connecticut DEEP regulatory requirements and explains the statutory authority permitting other than full and open competition under 10 U.S.C. 3204(a)(1). It includes rationale for the brand name restriction, efforts made to solicit other offers, and certification of legal sufficiency and contracting officer approval. The acquisition involves construction of weapons storage and ordnance operations facilities with an estimated completion within 1587 days after award.
PDF
PDF, High priority: read this first23 pages · specifications
HighAI Summary for Mounting Height Schedule - FINAL DESIGN 1667770dwg2of2Sentry: Design drawing/specification sheet for final design file FINAL+DESIGN_1667770dwg2of2Sentry.pdf. The document contains a mounting height schedule for electrical/devices/equipment, including receptacles, switches, dimmers, motor starters, occupancy sensors, lighting control panels/stations, junction boxes, monitoring control panels, raceways, and panelboards. It also includes general notes on coordinating mounting heights with field conditions, other trades, and equipment, plus minimum spacing requirements and other installation guidance.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for N4008526R0004 Amendment 0010: Standard Form 30 Amendment/Modification 0010 for solicitation N4008526R0004, effective 27 Aug 2026. This amendment extends the proposal due date from 01 Sep 2026 to 29 Sep 2026 and incorporates continuation sheets, updated drawings and specifications, updated Attachment H price proposal form REV4, several air leakage test forms, Attachment V SUBSENSIT 8020.I.G, updated clauses and provisions, and PPI responses. It also revises the liquidated damages clause and updates related schedule information for the DBB project for the P1102 Weapons Magazine and Ordnance Operations Facility at Naval Submarine Base New London, Connecticut.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for N4008526R0004 Amendment 0011: Amendment 0011 to solicitation N4008526R0004 for the Design-Bid-Build (DBB) of the P1102 Weapons Magazine & Ordnance Operations Facility at Naval Submarine Base, New London, CT. Issued on 10 Sep 2026, this amendment provides updated and additional Pre-Proposal Inquiry (PPI) responses, specifically clarifying vibration monitoring requirements, milestone sequencing, and the total construction duration of 1737 calendar days.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for N4008526R0004 Amendment 0012: Amendment 0012 to solicitation N4008526R0004 for the Design-Bid-Build (DBB) project P1102 Weapons Magazine & Ordnance Operations Facility at Naval Submarine Base, New London, CT. Issued on September 14, 2026, by NAVFACS/SYCOM Mid-Atlantic, this amendment provides updated and additional Pre-Proposal Inquiry (PPI) responses, specifically addressing blasting restrictions, milestone durations, and the acknowledgement of amendments on Form 1442.
PDF
PDF, High priority: read this first3 pages · amendment
HighAI Summary for N4008526R0004 Amendment 0013 - Weapons Magazine & Ordnance Operations Facility: Amendment 0013 to solicitation N4008526R0004 for the Design-Bid-Build (DBB) of the P1102 Weapons Magazine & Ordnance Operations Facility at Naval Submarine Base New London, CT. Key changes include extending the proposal due date from September 29, 2026, to October 14, 2026, and updating clauses and provisions, specifically adding DFARS clauses regarding Small Business Subcontracting Plans and prohibitions relating to Chinese Military Companies.
PDF
PDF, High priority: read this first3 pages · small-business-participation-commitment
HighAI Summary for N40085-26-R-0004 P1102 Small Business Participation Commitment Document: This document is the Small Business Participation Commitment Document (SBPD) for solicitation N40085-26-R-0004 P1102 regarding the Weapons Magazine & Ordnance Operations Facility in New London, CT. It is prepared by offerors to commit to minimum levels of subcontracting with small businesses (SBs) for evaluation under Factor 5, Small Business Utilization and Participation. The form requires offerors to identify their business size, applicable socioeconomic categories, and provide a subcontracting breakdown including total contract value and self-performed work. It includes tables to specify dollar values and percentages of total contract value committed to various small business categories, with a minimum 20% small business participation requirement. The document also requires listing subcontractors with firm commitments and explanations if the minimum participation is not met or if subcontracting is not intended. This form is mandatory for all offerors and is the sole basis for evaluating small business participation commitments.
PDF
PDF, High priority: read this first53 pages · rfp
HighAI Summary for N4008526R0004 P1102 Weapons Magazine & Ordnance Facility Solicitation: Solicitation N4008526R0004, issued 02 Mar 2026 by NAVFAC Mid-Atlantic for the Design-Bid-Build P1102 Weapons Magazine and Ordnance Operations Facility at Naval Submarine Base New London, Groton, Connecticut. The document includes pre-proposal conference details, project scope, estimated magnitude of construction ($200-$250M), offer submission/contact information, and solicitation/award form content. It indicates full and open competition and references source selection factors.
PDF
PDF, High priority: read this first6 pages · past-performance
HighAI Summary for NAVFAC Past Performance Questionnaire Attachment D: This document is Attachment D, the NAVFAC/USACE Past Performance Questionnaire (Form PPQ-0), used for evaluating contractor past performance in solicitations requiring a Past Performance Questionnaire (PPQ). It includes instructions for offerors on submitting completed CPARS evaluations or PPQs, and details the contract and client information to be completed by the contractor and client respectively. The form captures contract details, project description, client role, and includes adjective rating definitions for evaluating contractor performance. The document emphasizes submission procedures and the Government's right to verify information. It is intended to be submitted with proposals for NAVFAC solicitations to assess past performance.
PDF
PDF, High priority: read this firstchecklist-poam
HighAI Summary for NAVFAC Red Zone (NRZ) Checklist/POAM for Facility Acceptance: This document is the NAVFAC Red Zone (NRZ) Checklist/POAM, a tool designed to track the status of critical activities required for the Basis of Design (BOD) to ensure timely completion and prevent delays in facility acceptance and turnover. It organizes critical activities by responsible parties: Contractor, Client, and NAVFAC. The checklist includes sections for activities required for facility delivery and contract close-out, covering tasks such as final utility connections, system testing, commissioning, training, delivery of manuals, warranties, and certifications. The document emphasizes maintaining a comprehensive and updated checklist in the contract file to track progress effectively.
PDF
PDF, High priority: read this first836 pages · manual
HighAI Summary for NAVSEA OP 5 Revision 9 - Ammunition and Explosives Safety Ashore: This document is the ninth revision of the Naval Sea Systems Command Ordnance Pamphlet 5 (NAVSEA OP 5), titled Ammunition and Explosives Safety Ashore, superseding the eighth revision dated 10 March 2023. It provides updated regulations and procedures for the safe handling and stowage of ammunition and explosives ashore. Key updates include reclassification for public release, delegation of risk-decision authority, new electrical and grounding requirements, hazard analysis methods, and criteria for explosives safety deviations and site approvals. The revision enhances readiness and interoperability and incorporates changes effective as of the revision date.
PDF
PDF, High priority: read this first332 pages · specifications
HighAI Summary for P1102 Amendment 0006 Specifications Revision: This document is Amendment 0006 to the specifications for project P1102, containing a detailed table of contents for construction and procurement requirements. It includes divisions covering procurement, general requirements, existing conditions, concrete, masonry, metals, wood, thermal protection, openings, finishes, specialties, furnishings, special construction, fire suppression, plumbing, HVAC, and integrated automation. The document is a revision with various change dates noted, providing comprehensive technical and procedural specifications for the project.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for P-1102 Amendment 0007 Specifications: This document is Amendment 0007 to the specifications for project P-1102. It includes a detailed table of contents covering various divisions such as procurement and contracting requirements, general requirements, existing conditions, concrete, masonry, metals, wood/plastics/composites, thermal and moisture protection, openings, finishes, specialties, furnishings, special construction, fire suppression, plumbing, HVAC, integrated automation, and electrical. The document provides updated and changed sections with dates and change numbers, indicating revisions to technical specifications and requirements for construction and installation work. The amendment is critical for contractors to understand the current scope and technical details of the project.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for P-1102 Amendment 0007 Wetland Mitigation Drawings: This document is Amendment 0007 for the P-1102 Weapons Magazine & Ordnance Operations Facility project at Naval Submarine Base New London, dated 6/11/2026. It provides detailed wetland mitigation plans including best management practices, monitoring and maintenance protocols, construction sequencing, soil types, and erosion and sediment control measures. The amendment outlines responsibilities for erosion control, tree protection, and site grading to ensure compliance with environmental standards during construction. It supports the recapitalization project replacing existing magazines and buildings within the secure perimeter of the base.
PDF
PDF, High priority: read this first8 pages · price-proposal-form
HighAI Summary for P1102 Price Proposal Form - Bid Price Schedule: This document is the Bid Price Schedule for Project P-1102 Magazine & Ordnance Operations Facility. It includes line item prices for demolition, construction of various magazine types, site work, rock excavation, and optional items such as demolition of Building 524, installation of reinforced EPDM, and Electronic Security System equipment. The document specifies quantities, units, and pricing instructions, including detailed requirements for rock excavation volume calculations and photo-documentation. The form supports pricing for base and option items in accordance with project drawings and specifications.
PDF
PDF, High priority: read this first849 pages · specifications
HighAI Summary for P-1102 Weapons Magazine and Ordnance Operations Facility Final Design Submittal: This document is the Final Design Submittal for the P-1102 Weapons Magazine and Ordnance Operations Facility at Naval Submarine Base New London, Groton, CT. Prepared by CH2M and approved by NAVFAC, dated August 14, 2025, it includes detailed architectural, civil, structural, mechanical, electrical, fire protection, telecom/security, and cybersecurity specifications. The document contains a comprehensive project table of contents covering procurement, general requirements, existing conditions, concrete, masonry, metals, wood, thermal protection, openings, finishes, specialties, furnishings, special construction, fire suppression, plumbing, HVAC, and integrated automation divisions. It serves as a critical technical specification package for construction and contracting purposes.
PDF
PDF, High priority: read this first854 pages · specifications
HighAI Summary for P-1102 Weapons Magazine and Ordnance Operations Facility Final Design Submittal: This document is the Final Design Submittal for the P-1102 Weapons Magazine and Ordnance Operations Facility at Naval Submarine Base New London, Groton, CT. Prepared by CH2M and approved by NAVFAC on 08/14/2025, it includes detailed architectural, civil, structural, mechanical, electrical, fire protection, telecom/security, and cybersecurity specifications. The document contains a comprehensive project table of contents covering procurement, general requirements, existing conditions, concrete, masonry, metals, wood, thermal protection, openings, finishes, specialties, furnishings, special construction, fire suppression, plumbing, HVAC, and integrated automation divisions. It serves as a critical technical specification for construction and design compliance.
PDF
PDF, High priority: read this firstsow
HighAI Summary for P-1102 Weapons Magazine & Ordnance Operations Facility 1667770 Table of Contents: Project table of contents for P-1102 Weapons Magazine & Ordnance Operations Facility (project 1667770), dated 25 August 2026. The document lists divisions and specification sections for a construction project, including general requirements, masonry, metals, wood/plastics, thermal and moisture protection, openings, finishes, specialties, furnishings, special construction, fire suppression, electrical, communications, and electronic safety/security. It includes section numbers, dates, and change references, indicating the structure and scope of the project specification package.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
16 updates
PhaseClosed
Posted
Presolicitation
Type Changed
Presolicitation → Solicitation
Notice updated
The notice description changed.
Notice updated
The notice description changed.
Notice updated
The notice description changed.
Notice updated
Response deadline changed from Apr 30, 2026 to May 14, 2026. The notice description changed.
Deadline changed
Response deadline changed from May 14, 2026 to Jun 25, 2026.
Notice updated
The notice description changed.
Notice updated
Response deadline changed from Jun 25, 2026 to Jul 28, 2026. The notice description changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Response deadline changed from Jul 28, 2026 to Sep 1, 2026. The notice description changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
The notice description changed.
Notice updated
Response deadline changed from Sep 1, 2026 to Sep 29, 2026. The notice description changed.
Notice updated
The notice description changed.
Notice updated
The notice description changed.
Notice updated
Response deadline changed from Sep 29, 2026 to Oct 14, 2026. The notice description changed.
Notice updated
The notice description changed.
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Organization & Contact Information
Show more
AgencyDepartment Of Defense → Navfacsyscom Mid-Atlantic