Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Fence Repair And Installation

Open
RFQ-2026-029State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Zone 7 Water Agency is soliciting quotations for RFQ-2026-029 to secure a qualified contractor for the installation and repair of gates and fences on flood control facilities and other agency properties in Alameda County, California. The scope of work specifically focuses on 6-foot black vinyl-coated chain-link fencing and includes the installation of 800 linear feet of new fence, 10 new 15-foot width gates, and up to 120 repair occurrences of existing fencing. The contractor is responsible for all labor, materials, equipment, and disposal, ensuring all hardware is industrial grade and materials comply with ASTM F1043 and ASTM F1664 standards. Bidders must maintain a physical office or location within a 25-mile radius of 100 N Canyons Parkway, Livermore, CA. The contract is evaluated based on best value, considering the overall total cost for a three-year period, requirement compliance, contractor experience, and reputation. Awarded contractors must comply with the California Prevailing Wages Act and be registered with the Department of Industrial Relations. Invoices are processed on a one-time or monthly basis with standard 30-day payment terms. There is no specified set-aside status for this solicitation. Quotations must be submitted via the E-Procurement Portal by the deadline of December 8, 2026.

General Info

Zone 7 Water Agency seeks contractors for fence and gate installation and repairs.

Place of Performance

Livermore, CA, 94551, USA

Set-Aside

NONE

Documents

3
PDF, High priority: read this firstrfq
High
JPG
JPG

Read all 3 documents

Due in 18 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 18 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 3 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → ZONE 7 WATER AGENCY
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Bid #RFQ-2026-029: Zone 7 Water Agency desires to hire a qualified and reliable contractor to provide installation and repair services of gates and fences on Flood control facilities and other Zone 7 properties. The work includes initial site inspection, mobilization, removal of existing fence components, ground preparation and post installation, installation and repair of new fence components (panels, fabric, boards, rails, braces, gates, hinges, latches, locks), finishing work, cleanup, and disposal. The contractor is responsible for providing all labor, materials, equipment, tools, transportation, supervision, and other resources necessary to complete the work in accordance with Agency standards and applicable regulations.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation SD-462, is a construction effort located at the Main Wastewater Treatment Plant in California. The project has an estimated value between 18.5 million and 19.5 million dollars. The scope of work involves the rehabilitation of open and covered concrete structures, relining and replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Key technical requirements include the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, modifications to sluice and slide gates, and the installation of new instrumentation, electrical systems, and motor control center components. Additional tasks include excavation, trench work, surveying of reactors, and the installation of platforms for improved access. The solicitation is issued by Ranger Pipelines Incorporated and is designated as a Small Business set-aside, including SBA certified Veteran Owned Small Business, Service-Disabled Veteran Owned Small Business, Women-Owned Small Business, and HUBZone Small Business. The project encourages the participation of certified DBE, DVBE, and SBE subcontractors for services such as welding, electrical work, concrete rehabilitation, and coating. All work must comply with applicable state, county, and federal regulations. The response deadline for this solicitation is December 2, 2026.
Ranger Pipelines Incorporated

POSTED

34 minutes ago

DEADLINE

in 11 days
View Details

More opportunities from California → ZONE 7 WATER AGENCY

Same awarding agency

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS