Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on September 20, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fence Replacement, Canso Canal

Closed
30005993International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract involves the replacement of deteriorated perimeter fencing at the Canso Canal, an active operational zone managed by the Canadian Coast Guard in Nova Scotia. The scope of work includes the mobilization of labor and equipment to remove existing fencing and vegetation, and the installation of new 2.44 meter high galvanized chain link fencing topped with barb wire, along with various single and double swing gates. The contractor is responsible for providing all necessary materials, including galvanized steel base plates and wire mesh, while reusing certain existing posts where applicable. Due to the secure nature of the site, the contractor must be entirely self-sufficient, providing their own portable trailers, washrooms, power, and water. Strict security protocols are in place, requiring a commissionaire escort at all times and a site access request submitted 48 hours in advance. The contractor must adhere to site-specific safety and information documents and provide several deliverables prior to mobilization, including shop drawings, a work schedule, a site security plan, a waste disposal plan, and a health and safety plan. Additionally, temporary lockable fencing must be installed at the end of each shift to maintain site security.

General Info

Contractor replaces perimeter fencing and gates at Canso Canal under strict security protocols.

Agency

Government of Canada → Fisheries and Oceans Canada

Place of Performance

*Cape Breton *Nova Scotia, CAN

Set-Aside

NONE

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Fisheries and Oceans Canada
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Fisheries and Oceans Canada
Office AddressN/A

Full Description

Show more
Work under this Contract includes but is not limited to the provision of all labour, materials, and equipment required to: • Mobilize/demobilize including site preparation and organization; • Remove and dispose of all existing fence and wire mesh to be replaced; • Remove trees and shrubs at location of new installations; • Supply and install new complete 2.44 meter high galvanized chain link fence including 0.30 meter high barb wire, includes sections installed on galvanized steel base plate; • Supply and install 2.44 meter high galvanized wire mesh, top rail and 0.30 meter high barb wire (This section of existing fence posts will be reuses as in-place); • Supply and install various sizes of single and double swing gates; • Install temporary fence at the end of each working shift to keep the site secured during off working hours The Canso Canal is a manmade waterway that forms part of the Canso Causeway to allow marine traffic to transit the Strait of Canso. The Canso Canal is operated by the Canadian Coast Guard (CCG) Atlantic Region from April 14 to December 23 on a 24/7 basis. The Canso Canal site also includes storage facilities from the Environmental Response (ER) program of the CCG. The Canso Canal site is secured by a perimeter fence with limited access to security screened employees. The fence has been in place for over 30 years and has been exposed to salt water environment and harsh winter conditions that have led to extensive deterioration. Replacing these sections of fence is necessary to ensure safety, maintain aesthetics and minimize future maintenance costs. The Canso Canal site is an active operational zone controlled by the Canadian Coast Guard (CCG). The Officer-in-Charge is responsible for the site’ operation and the contractor must follow his instructions if and when given. The contractor will not have access to any of the facilities onsite. The contractor will require to be self-sufficient, this includes portable site trailers, portable washroom, electrical power and drinking water. The contractor must follow Canso Canal’s Site Specific Safety, Process and Information Document. Contractor’s management must assure this information must be known and followed by every participant to this project of their control, this includes but not limited to, all employees, subcontractors, consultants and deliveries. the contractor must also submit site specific Health and Safety Plan within 7 days of notice to proceed and prior to commencement of work. Please refer to Health and Safety Requirement section 01 35 29 of the specification for more information. The contractor must be accompanied by a commissionaire when onsite performing work. A site Access Request must be submitted to departmental representative 48hrs in advance of arrival to site. The commissionaire will be assigned with the contractor by the departmental representative at no cost to the contractor. The contractor must provide temporary site enclosure fencing with lockable gates to prevent unauthorize access at the end of the work shift. Locks are to be supplied by departmental representative and the commissionaire will have access to the keys. Please refer to Temporary Controls Section 01 57 00 of the specification for more information. The contractor must submit a waste disposal plan that will demonstrate the commitment to reduce and divert waste materials from landfill. Deliverables to be submit prior to mobilization to site includes: 1. Shop drawings a. Chain link fences and gates i. Fence fabric gauge and finish ii. Post and rail dimension and finish iii. Gate frame dimension and finish iv. Required fittings and hardware v. Other information as requested b. Proposed base plate and anchoring detail c. Concrete mix 2. Proposed work schedule 3. Site specific safety plan 4. Site security plan 5. Waste disposal plan

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS