Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Fenton Parkway Bridge Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Fenton Parkway Bridge Project, led by the Board of Trustees of the California State University with San Diego State University as the project applicant, involves the construction of a vehicular and pedestrian bridge spanning the San Diego River. The structure will be a conventional prestressed concrete girder bridge supported by piers within the river channel and abutments in the river embankments. Located in San Diego, California, the project aims to enhance local and regional connectivity and establish a high-water crossing to mitigate risks in an area prone to significant flooding. The project has received a Clean Water Act section 401 water quality certification (Certification No. R9-2025-0150) from the San Diego Water Board, which acted as a responsible agency in the approval process. A Notice of Determination was issued on August 11, 2025, confirming that the project complies with CEQA requirements, including the adoption of a final Environmental Impact Report, specific mitigation measures, and a monitoring plan. The project is classified under NAICS code 237310 for highway, street, bridge, and tunnel construction.

General Info

Fenton Parkway Bridge construction approved for vehicular and pedestrian use with environmental compliance for flood-prone San Diego River crossing.

Agency

California State University Board of Trustees

Place of Performance

Fenton Parkway and River Park Road, San Diego, CA, 92108

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia State University Board of Trustees
Contacts2 people available
OfficeN/A
Organization / Agency
California State University Board of Trustees
Office AddressN/A

Full Description

Show more
The San Diego Water Board issued a Clean Water Act section 401 water quality certification (Certification No. R9-2025-0150) to the Project Applicant to construct a vehicular and pedestrian bridge spanning the San Diego River from Fenton Parkway to the north to Camino Del Rio North to the south. The bridge will be a conventional prestressed concrete girder structure supported by abutments in the river embankments and piers within the river channel. The Project will improve local and regional connectivity and provide a high-water crossing in an area prone to significant flooding.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 10 hours ago

DEADLINE

in 23 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS