Fenton Parkway Bridge Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Fenton Parkway Bridge Project, led by the Board of Trustees of the California State University with San Diego State University as the project applicant, involves the construction of a vehicular and pedestrian bridge spanning the San Diego River. The structure will be a conventional prestressed concrete girder bridge supported by piers within the river channel and abutments in the river embankments. Located in San Diego, California, the project aims to enhance local and regional connectivity and establish a high-water crossing to mitigate risks in an area prone to significant flooding. The project has received a Clean Water Act section 401 water quality certification (Certification No. R9-2025-0150) from the San Diego Water Board, which acted as a responsible agency in the approval process. A Notice of Determination was issued on August 11, 2025, confirming that the project complies with CEQA requirements, including the adoption of a final Environmental Impact Report, specific mitigation measures, and a monitoring plan. The project is classified under NAICS code 237310 for highway, street, bridge, and tunnel construction.

General Info

Fenton Parkway Bridge construction approved for vehicular and pedestrian use with environmental compliance for flood-prone San Diego River crossing.

Agency

California State University Board of Trustees

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Fenton Parkway and River Park Road, San Diego, CA, 92108

Set-Aside

NONE

Documents

(1)

NOD_897582_Fenton Parkway Bridge Project Notice of Determination

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia State University Board of Trustees
Contacts2 people available
OfficeN/A
Organization / Agency
California State University Board of Trustees
Office AddressN/A
Contacts
Lauren KimEnvironmental Scientist
Anne Collins-DoehneDirector of Land Use Planning and Environmental Review

Full Description

Show more
The San Diego Water Board issued a Clean Water Act section 401 water quality certification (Certification No. R9-2025-0150) to the Project Applicant to construct a vehicular and pedestrian bridge spanning the San Diego River from Fenton Parkway to the north to Camino Del Rio North to the south. The bridge will be a conventional prestressed concrete girder structure supported by abutments in the river embankments and piers within the river channel. The Project will improve local and regional connectivity and provide a high-water crossing in an area prone to significant flooding.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 10 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS