Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

FERM 2.0 (Forest Engineering Road Maintenance)

Active
1204N020Q0007Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The FERM 2.0 Forest Engineering Road Maintenance contract is a 10-year Blanket Purchase Agreement designed to support road maintenance and related engineering activities across three national forests in Oregon: Deschutes, Ochoco, and Fre-Win. The contract encompasses a broad range of services including routine road surface maintenance, roadside brushing, road reconstruction and decommissioning, asphalt surface treatments and pavement grinding, limited road construction, and both minor and major structural work. Additional responsibilities cover stream restoration and rehabilitation, pit development, and aggregate crushing. The aim of these activities is to ensure safe public access, protect transportation investments, and maintain or improve environmental resources adjacent to the roadways. Road construction will be limited to projects of two miles or less, with specific constraints on side slopes and use of blasting. Asphalt treatments include surface restoration with various materials and patching, while minor structures involve smaller-scale construction and repair work related to roads, trails, and associated facilities. Major structures are limited to four or fewer and involve activities such as fish passage structures and bridge maintenance. Stream restoration focuses on maintaining aquatic habitat and hydraulic function through bank stabilization and in-stream work. Pit development entails preparation and production of construction materials like aggregate. The contract is a total small business set-aside, with solicitation released in early 2020 by the Department of Agriculture’s Ochoco National Forest office, which manages the agreement’s oversight and points of contact.

General Info

10-year small business contract for road maintenance, reconstruction, stream restoration in Oregon forests.

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

OR, USA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhasePresolicitation
Posted

Presolicitation

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Ochoco National Forest
Contacts1 person available
OfficePRINEVILLE, OR, 97754, USA
Office AddressPRINEVILLE, OR, 97754, USA
Contacts

Full Description

Show more
FERM 2.0 FOREST ENGINEERING ROAD MAINTENANCE The FERM (Forest Engineering Road Maintenance) is a BPA that will serve 3 national forests in Oregon, the Deschutes, Ochoco and the Fre-Win. The activities that will be on this BPA are Road Surface Maintenance, Roadside Brushing, Road Reconstruction and Decommissioning, Asphalt Surface Treatments, Asphalt Pavement Grinding, Road Construction (limited), Minor Structures, Stream Restoration and Rehab, Major Structures and Pit Development and Crushing. This will be a 10 year BPA (Blanket Purchase Agreement). Road Surface Maintenance: Road Maintenance work will consist of routine work necessary to maintain the Federal Road System in a functioning condition providing safe public access, protecting the transportation facility investment and adjacent environmental resources. Work is generally confined within the limits of the existing traveled way and adjacent ditches, shoulders and cut/fill slopes. Roadside Brushing: Roadside brushing consists of cutting all vegetative growth, including trees and other vegetation above the ground, along the roadsides of the Federal Road System in order to maintain the desired road width and provide for safe public access. Road Reconstruction: Possible performance activities could include clearing, excavation, restoration or placement of bituminous, aggregate and native surfaces, drainage installation, drainage maintenance and repair, bridge maintenance and repair, cut and fill slope stabilization, erosion control measures, traffic control, and sign installation. Road Decommissioning: Possible performance activities could include excavating and removal of drainage pipes (various sizes), ripping, re-contouring, placement of mineral/woody material, installation of surface drainage (including waterbars, drain dips, rock fords and cross-drains) and access blocking features. Asphalt Surface Treatments: Asphalt surface treatments will involve traveled way and parking lot restoration of bituminous surfaces. Possible performance activities could include Placement of Bituminous Concrete Pavement (Not to exceed 1,000 tons), surface treatments include asphalt patches, slurry seal coat and tack or emulsion coat for application of chips for a chip seal surface, and necessary surface preparation needed prior to application of asphalt surface treatment. Road Construction: Road construction will be limited to two miles or less. This work will involve all construction activities normally associated with new road construction. The exception to this is, limited drilling and shooting will be anticipated, side slopes will not consistently exceed 60 % and not more than 80% of excavated material shall be designated for end haul. Blasting plans shall be provided when necessitated by project requirements. Possible performance activities could include Signing (traffic control), Safety, Construction Staking, Clearing, Earthwork, Drainage (surface, sub-surface, drainage pipe), Aggregate Placement (base and surfacing, riprap, pit run), Hot-Mix Asphalt Placement, Watering, Erosion Control Measures, and rock crushing for aggregate. Minor Structures: Miscellaneous construction work is that which requires the use of similar manpower and equipment normally associated with standard road construction/reconstruction and maintenance activities. Possible performance activities could include clearing, excavation, trenching, placement/repair road/trail, repair of curb sections, fences, and guardrail, removal of existing structures, concrete placement (quantities not exceeding 10 cy, including forming and finishing), structural embankments and buttresses, gate installation and repair, cattleguard installation and repair, and stock pond cleaning and restoration. Stream Restoration and Rehabilitation: Stream restoration and rehabilitation consists of maintaining sustainable stream channel function for hydraulic flow and aquatic organism habitat. Possible performance activities could include placing rip rap to stabilize banks or to prevent head cutting, construction of a variety of in-stream structures using both rocks and logs, reshaping stream banks, relocation of stream channel, and mechanical transplanting of riparian vegetation. Major Structures: Construction of major structures will be limited to four structures or less. This work will involve all construction activities normally associated with road structure construction or maintenance, including fish passage structures and bridges. Possible performance activities could include construction of Fish Passage Structures including Pre-cast Box Culverts and Corrugated Metal and associated in-stream structures (Spans from 5 to 20 ft), clearing and grubbing, excavation and compaction, concrete placement, installation of water diversions, asphalt paving, and maintenance to existing vehicle bridges including replacement of deficient concrete, steel or timber bridge members such as railing, curbs, decking, stringers, and abutment posts. Pit Development and Crushing: Pit development and crushing consists of all construction activities normally associated with development of a new or existing material source (aggregate, pitrun, riprap, etc) and the production of a specified aggregate material. Possible performance activities could include clearing and grubbing, stripping of topsoil, removing overburden, drilling and blasting of material source, screening/sorting of material, rock crushing, stockpiling of materials, construction of access roads and conduction restoration activities. The solicitation will be out the middle of March 2020. It will be advertised for a month once it is posted in beta.sam.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work encompasses site preparation, pipeline and utility installation, and surface improvements. Key activities include land surveying, site clearing, subsurface investigation, shoring, tunneling, boring, jacking, and micro tunneling. Additionally, the project requires the installation of steel casing, cathodic protection, valves, asphalt paving, landscaping, and the provision of traffic signs, signals, and lighting. Material requirements include ready mix supply, precast concrete, and manhole materials, alongside environmental support such as storm water pollution prevention. This solicitation is open to qualified subcontractors and suppliers, with a strong emphasis on Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise certified firms. To be considered responsive, bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system. The deadline for responses is November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 22 days
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Riverside County In Desert Hot Springs From 0.3 Mile South To 0.4 Mile North Of Pierson Boulevard
Solicitation # 08-1N8804
Solicitation 08-1N8804 is a construction project issued by the California Department of Transportation for work on a state highway in Desert Hot Springs, Riverside County. The project scope covers the area from 0.3 mile south to 0.4 mile north of Pierson Boulevard and involves the installation of hot mix asphalt, imported borrow, and signal and lighting systems. Key technical deliverables include the deployment of IP67-rated Type 4 cameras with real-time analytics for vehicle detection and the integration of network equipment at the Inland Empire Transportation Management Center. The estimated cost of the project is 3,530,000 dollars, with bids required on a unit price basis. The contract mandates strict adherence to Buy America standards per 2 CFR 184.6, requiring all manufacturing processes to occur within the United States. Compliance includes providing manufacturer certificates of compliance and ensuring hardware meets NEMA TS-1/TS-2 and IEEE 802.3 standards. Environmental and safety requirements include MASH compliance for highway safety features and certifications from a registered civil engineer or professional geologist regarding pH and lead levels in local materials. Additionally, the project requires the payment of prevailing wages as determined by the California Department of Industrial Relations and includes specific submittal requirements for Disabled Veteran Business Enterprise quotes. Final acceptance is contingent upon the successful completion of physical, performance, and functional tests, including specific network metrics such as latency and packet loss.
California Department of Transportation

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Mendocino County About 8 Miles South Of Willits From 0.2 Mile North Of Ridgewood Ranch Road To 0.4 Mile South Of Black Bart Road
Solicitation # 01-OL3804
Solicitation 01-OL3804 is a cost-plus-time construction contract issued by the California Department of Transportation for work on State Highway Route 101 in Mendocino County. The project is located approximately 8 miles south of Willits, extending from 0.2 mile north of Ridgewood Ranch Road to 0.4 mile south of Black Bart Road. With an estimated project cost of 13.7 million dollars, the scope of work includes roadway excavation, the placement of Hot Mix Asphalt and High Friction Surface Treatment, and the installation of asphalt concrete pavement and concrete barriers. Additional deliverables include the construction of concrete curbs, sidewalks, railings, fences, and the implementation of a lead compliance plan and erosion control measures. The contract is governed by 2025 Standard Specifications and Standard Plans, with project plans approved on June 9, 2026. Key compliance requirements include adherence to Buy America/Build America standards for manufactured products, the use of LCPtracker Pro for electronic certified payroll records, and strict environmental regulations regarding aerially deposited lead. Performance is subject to specific time constraints, notably that work within drainage channels is only permitted from June 15 to October 15. Bidders must comply with California Department of Industrial Relations prevailing wage rates and provide certifications for off-road diesel-fueled vehicle compliance. The response deadline for this solicitation is December 8, 2026.
California Department of Transportation

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Santa Barbara County Near Santa Ynez From 0.1 Mile North Of Route 246 To 0.1 Mile South Of Route 246
Solicitation # 05-1R5704
Solicitation 05-1R5704 is a unit price basis contract issued by the State of California Department of Transportation for infrastructure upgrades on State Highway 154 in Santa Barbara County. The project scope focuses on lighting, striping, and signage improvements from 0.1 mile north to 0.1 mile south of Route 246. Key technical requirements include micro-surfacing, tack coat application, thermoplastic traffic striping, and the installation of pavement markers. The work also involves relocating and installing roadside signs, modifying flashing beacon systems, and implementing erosion control through hydroseed and compost application. Specialized construction tasks include the installation of Cast-In-Drilled-Hole concrete piles, requiring a contractor with a proven track record of at least three similar foundation projects in the last five years. The project has an estimated value of 820,000 dollars and must be completed within 50 working days. Bids are due by 2:00 p.m. on November 19, 2026, via the Bid Express website and must include bidder security of at least 10 percent of the bid. Compliance requirements are stringent, including adherence to Buy America/Build America standards, DIR general prevailing wage rates, and environmental product declarations for concrete and asphalt. Quality control is managed through specific survey accuracy standards for horizontal and vertical coordinates and requires personnel with ACI Concrete Field-Testing Technician Grade 1 certification. The contract also emphasizes diversity through submittal requirements for Disabled Veteran Business Enterprise quotes and small business preferences.
STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION

POSTED

about 3 hours ago

DEADLINE

in 24 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS