Fiber Optic Cable Installation (Outside Plant)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This subcontract for Fiber Optic Cable Installation (Outside Plant) involves the deployment of broadband infrastructure for prime contractors on Caltrans District 2 projects. The scope of work includes trenching, directional drilling, conduit placement, fiber pulling, splicing, and testing of middle-mile fiber optic cables along SR 96 and various roads within Siskiyou County. The contractor is required to utilize OTDR testers and directional boring machines while adhering strictly to Caltrans Standard Specifications and SHS safety standards. The ultimate objective of the contract is the delivery of a fully installed and tested open-access middle-mile fiber optic network.
General Info
Agency
Place of Performance
CASet-Aside
Documents
This scope was carved out of Work Orders 2, 3, and 11 for the SisTel Broadband Capital Oversight Project.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
