Work Orders 2, 3, and 11 for the SisTel Broadband Capital Oversight Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The SisTel Broadband Capital Oversight Project, encompassing Work Orders 2, 3, and 11, involves the installation of approximately 89 miles of fiber optic broadband infrastructure along key roadways in Siskiyou County, California, including SR 96, Klamath River Road, Humbug Creek Road, Hawkinsville-Humbug Road, and Sawyers Bar Road. The project, aligned with the statewide Middle-Mile Broadband Network initiative, will lay a single 4-way microduct containing two 288-count fiber optic cables—one each for the California Department of Technology and Siskiyou Telephone Company—with two spare ducts for future use. Construction methods include rock saw trenching, open trenching, and horizontal directional drilling, with conduit placed 4 to 8 inches off the pavement edge or within the shoulder, adjusted as needed to avoid environmental sensitivities. Access vaults or handholes will be installed every 1,500 to 2,400 feet, with every fifth vault enlarged for splicing, and all will be flush or buried. Additional infrastructure includes pullboxes spaced roughly one mile apart, fiber optic cable attachments to existing bridges and three PacifiCorp utility poles using overlashing and single-strand methods, and fiberglass marker posts placed approximately every mile to indicate cable presence. The project will operate entirely within existing rights-of-way, with construction corridors limited to about 30 feet in width and reduced to a permanent 10-foot width post-construction. Staging areas will be established adjacent to the alignment without requiring new roads, grading, or removal of woody vegetation, and best management practices such as silt fences will be employed if bulk materials are stored onsite. The fiber route will leverage existing transportation infrastructure managed by Caltrans District 2, Siskiyou County, the Klamath National Forest, and the Bureau of Land Management. The initiative fulfills the mandate of California Senate Bill 156, signed into law in 2021, to establish an open-access middle-mile network that bridges the connectivity gap across underserved rural communities, ensuring reliable, affordable high-speed internet access for residents, businesses, and public institutions statewide. The effort is foundational to achieving universal broadband access as part of California’s broader commitment to digital equity and future-ready infrastructure.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
