Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Fiber Optic Cable Installation (Trenching & Boring)

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the physical installation of middle-mile broadband conduit and fiber optic cabling for prime contractors on Caltrans District 3 utility projects. The scope of work focuses on the SR 99 corridor in Yuba City, requiring the execution of trenching, boring, and horizontal directional drilling to place conduit and pull fiber optic cable. All activities must be performed in strict accordance with Caltrans encroachment permit specifications and Public Resources Code Section 21080.51. The contractor is responsible for providing and operating specialized equipment, including HDD rigs and conduit fusion tools, to deliver completed underground infrastructure. This project falls under NAICS code 335921 and is managed through the California agency Caltrans, District 3, serving the Marysville and Sacramento regions.

General Info

Subcontract for installing middle-mile broadband conduit and fiber optic cabling for Caltrans District 3.

Agency

California → Caltrans, District 3 - Marysville/Sacramento

Place of Performance

Yuba City, CA

Set-Aside

NONE

Documents

This scope was carved out of 03-25-6-BB-0722.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

CVIN, dba Vast Networks State Route 99 Middle-Mile Broadband Network Project (Encroachment Permit 03-25-6-BB-0722)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom CVIN, dba Vast Networks State Route 99 Middle-Mile Broadband Network Project (Encroachment Permit 03-25-6-BB-0722)
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 3 - Marysville/Sacramento
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Caltrans, District 3 - Marysville/Sacramento
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs physical installation of middle-mile broadband conduit and fiber optic cabling for prime contractors on Caltrans District 3 utility projects. Executes trenching, directional drilling (HDD), boring, and conduit placement along the SR 99 corridor per Caltrans encroachment permit specifications and Public Resources Code Section 21080.51. Utilizes HDD rigs and conduit fusion equipment. Delivers installed underground conduit and pulled fiber optic cable.

Similar Contracts

Same NAICS industry code

NAICS: 335921
New
Federal
56 CS FOC to Flightline and Wx Equipment, Luke AFB
Solicitation # F3YCFA6173AC01
This firm-fixed-price contract requires a contractor to engineer, furnish, install, and test new 12-strand single-mode fiber optic cable at Luke Air Force Base, Arizona. The scope of work involves connecting multiple critical facilities, including Radar Approach Control, the Air Traffic Control Tower, Base Operations, the Command Post, and various flightline and meteorological stations. The installation will utilize a combination of existing manhole/handhole duct systems and direct burial, with the latter requiring a minimum depth of 36 inches below grade. All provided materials must be new, rust-proof, and corrosion-resistant. The project must be completed within 120 days of award, with a total period of performance not to exceed 180 calendar days. This requirement is a 100% Women-Owned Small Business set-aside. Award will be based on the lowest priced, technically acceptable quote, with evaluation factors focusing on technical capability, past performance via the Supplier Performance Risk System, and price reasonableness. Technical submissions must include a detailed installation design and a quality control plan. All work must be performed by a certified telecommunications contractor, and final acceptance is contingent upon successful OTDR and optical power meter testing in accordance with TIA 526-7. Contractors must adhere to strict base access security protocols and Luke AFB environmental guidelines regarding hazardous materials and lead-based paint.
FA4887 56 Cons Cc

POSTED

1 day ago

DEADLINE

in 17 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS