The Department of Public Utilities owns and maintains the municipal water and sanitary sewer collection systems. The treatment of sanitary sewage (wastewater) is provided by another agency Hampton Roads Sanitation District (HRSD). The following is a review of the population and customer growth beginning FY2020 through FY2025: Year Population Water Customers Sanitary Sewage (Wastewater) Customers 2025 256,031 70,627 69,059 2024 254,997 70,101 68,535 2023 253,886 68,921 67,626 2022 252,488 68,585 67,193 2021 251,269 67,659 66,087 2020 249,787 67,133 65,545 The City's water system contains components for the production, treatment, transmission and distribution, and delivery of water to its customers. Below is the status of each of these components: Water Production and Treatment : The City's water resources include treated surface water from the Northwest River, treated ground water from several wells, surplus raw water purchased from the City of Norfolk to supply the Lake Gaston Water Treatment Plant (LGWTP), the In-Town Lakes Facility, and bulk finished water purchased from the neighboring cities of Norfolk and Portsmouth. In addition, Chesapeake's one-sixth share of the Lake Gaston partnership with the City of Virginia Beach is being reserved for future usage. Based on current projections, it is estimated that the City has a supply adequate to meet its needs through the year 2040. Bulk Finished Water Purchases : Since 1965, the City has obtained a portion of its water supply through bulk water purchases from the cities of Norfolk and Portsmouth. Since June 12, 2002, the City has been operating under a 40-year contract with Norfolk (Norfolk Contract) to purchase bulk water from Norfolk's surplus finished water supply. The Norfolk Contract will ex pire on December 31, 2042. The FY2025 current rate is $8.596 per thousand gallons and purchases in fiscal year 2025 have averaged 2.0 MGD. The Portsmouth bulk water contract (Portsmouth Contract) was effective on January 1, 1990, updated on June 12, 1996, updated July 1, 2017, and expires on June 30, 2047. The FY 2025 rate under the Portsmouth Contract is $7.187 per thousand gallons for purchases up to 3.0 MGD. Treated Surface Water from the Northwest River : Beginning in 1980, a portion of the City's water supply has been provided by water from the Northwest River and treated at the Northwest River Water Treatment Plant (NWRWTP). The NWRWTP was upgraded during the period 1996 to 1999 to include ground and surface water reverse osmosis capability including four deep wells. It became, and remains, one of the most advanced and complex plants of its size on the East Coast. Well Water : In order to supplement its existing water supply and provide an alternate supply of fresh water in the event of saltwater intrusion in the Northwest River prior to an upgrade of the NWRWTP in the late 1990's, the City developed four wells during the period 1987 to 1989 (one of the original wells has since been removed from service). These wells are located in the western portion of the City and are referred to collectively as the Western Branch Well System. The Western Branch Well System consists of four deep wells, one of which is an Aquifer Storage and Recovery (ASR) well. The ASR well allows more efficient use of the City's existing water in an underground aquifer. During periods of high demand, this water is retrieved, retreated for manganese removal, disinfected and pumped to customers after being blended with finished water from the LGWTP. The ASR well is not a new water source but rather a water storage operation. Each well has a 3.0 MGD capacity. Surplus Raw Water Purchases from the City of Norfolk for the LGWTP : In December 2002, the City of Chesapeake entered into a 30-year surplus raw water purchase contract with Norfolk to supply raw water to the LGWTP. The rate is adjusted yearly in accordance with the annual average Consumer Price Index . The current rate is $1.68 per thousand gallons and was effective July 1, 2025. Initially, the contract allows for the purchase of 7.0 MGD of raw surplus water. I n the future, this contract amount can be increased up to a total of 10.0 MGD with the mutual agreement of both parties, provided Norfolk has further surplus raw water available to accommodate the increase. In-Town Lakes Facility : Two large former borrow pits are owned by the Department to serve as a supplemental, temporary supply of raw water for the LGWTP. The need for such a facility was envisioned based on the possibility of damage to the raw water main, which normally conveys water to the LGWTP from its point of connection with Norfolk's raw water transmission mains. With sufficient storage to supply 7.0 MGD to the LGWTP for approximately 100 days, the In-Town Lakes are an important part of the City's water resources. The water stored at this location is routinely "freshened" with raw water purchased from Norfolk t o ensure c onsistent quality and a state of readiness. Numerous trials have been run utilizing this water to supply the LGWTP. Experience has demonstrated that the raw water supply can easily be changed from its normal source (directly from the City of Norfolk) to the In-Town Lakes without causing any undesirable operational impacts to the treatment plant. In 1987, the City entered into an agreement with the City of Virginia Beach for the development of a water supply from Lake Gaston on the Virginia-North Carolina border. Under the terms of the agreement, the City would pay one-sixth of the development costs and was guaranteed one-sixth of the water transported by the pipeline from Lake Gaston. The project is currently permitted for withdrawals up to 60.0 MGD. The pipeline was placed in service in November 1997. Since then, Lake Gaston water has been providing drinking water for the City of Virginia Beach. Chesapeake's share of the water is available for the City to transport into Chesapeake's corporate limits for treatment. As stated above, this supply will now be held in reserve for the future while the City addresses its intermediate demands via the Norfolk surplus raw water contract. Water Distribution System : The physical property of the water system as of June 30, 2024, included approximately 973 miles of transmission and distribution lines varying in size from 2 inches to 36 inches in diameter, 6,209 fire hydrants, five elevated water tanks, eight ground storage tanks, seven wells and two water treatment plants. The water system is fully metered, with meter sizes ranging from 5/8 inch to 10 inches. The daily average water consumption in gallons (in MGD) during the last six audited fiscal years: Fiscal Year AVG Daily Demand (MGD) 2025 16.16 2024 15.78 2023 15.37 2022 15.85 2021 15.60 2020 15.38 The Sewer System : Chesapeake's sanitary sewer (wastewater) collection system became operational with the acquisition of assets of six sanitary districts existing within Chesapeake's corporate limits at the time of the creation of the City in 1963. Since that time, the City, through the Department, has expanded the sewer system, which consists of 281 pumping (lift) stations, 132 miles of force main, 773 miles of the gravity collection system, nearly 17,612 manholes and nearly 1,964 sewer clean outs as of June 30, 2024. The following table shows the increase in sanitary sewer connections over the last five audited fiscal year: Fiscal Year FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 * FY 2025 Sanitary Sewer (Wastewater) Connections : 67,888 68,501 68,932 69,262 68,701 69,374 * In FY2024 , Public Utilities went through a system conversion to Hampton Roads Sanitation District's (HRSD) Customer Care and Billing (CC&B) software. The previously utilized Customer Information Syste m (CIS) re porting system included new development premises in the overall active number of accounts even before they were provided individual service. The new CC&B report excludes the new development premises from the count until the service is established at each property location . The difference is reflected in the reduction of active accounts from FY2023 to FY2024. Renewal and upgrading of the sewer system and appurtenances are priorities of the Department. In addition to the renewal of certain areas of the system, new construction continues as raw land is developed and the system is extended to areas of the City currently served by septic tanks. To maintain the high degree of responsiveness and assurance of uninterrupted service to its customers, the Department has purchased state-of-the-art maintenance equipment. The Department operates four high pressure washer/vacuum sewer cleaner trucks, one pump and dump truck and three television inspection/grout trucks to clear stoppages of main lines, to remove sludge and debris from manholes and pumping station wet wells, and to visually inspect main lines for breaks and cracks and grout those defects when grouting is possible. In addition, the Department has six portable generators that can be delivered to pumping stations that are not equipped with standby generators and connected to such pumping stations to restore power to the pumping station during periods of power outages. All of the City's pumping stations are equipped with telemetry to alert the Department of power outages. Wastewater Treatment : Wastewater treatment is provided by the Hampton Roads Sanitation District (HRSD), an entity of the Commonwealth of Virginia acting under the direction of the HRSD Commission. The Department coll ects connection fees as agent for the HRSD Commission. Because such fees are passed through to the HRSD Commission, they do not constitute Revenues of the System. Billing : HRSD offers a joint billing service. This joint billing is known as Hampton Roads Utility Billing Service. (HRUBS) allows the respective jurisdictions' charges for both water and sewer (wastewater) service, and HRSD's charges for wastewater treatment to appear on the same bill. Chesapeake joined this regional program in 1997. Billing information is transmitted electronically from the City to HRSD. HRSD then uses the City's meter reading information to calculate their charges for wastewater treatment. Customers send their payments to HRSD and HRSD transmits funds due to the City.