Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from North Carolina was posted on July 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fire Alarm System Design and Engineering

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
RFP/RFQ - On-Call Engineering Services for Torrington Transfer Station/NRRA
Solicitation # EDC 11- 2026 -01
The Northwest Hills Council of Governments (NHCOG) is soliciting proposals under solicitation number EDC 11- 2026 -01 for on-call engineering services to support the Torrington Transfer Station and the Northwest Resource Recovery Authority (NRRA). The agency seeks a qualified firm specializing in Municipal Solid Waste and Recycling Transfer Stations to provide technical analysis, facility and operational capacity assessments, site planning, and permitting assistance. These services are intended to support ongoing operations and inform the NRRA Strategic Plan and future capital investment decisions, ensuring compliance with CT DEEP General Permits. Interested firms must submit their proposals by November 30, 2026, at 11:00 AM. Submissions must include a project management plan, key personnel resumes limited to two pages, three relevant references, a technical approach, and a detailed project timeline. A fee proposal containing hourly rates or lump sum allocations must be submitted in a separate sealed envelope. Evaluation will be based on personnel qualifications, experience with multiuse trails and waste facility planning, the proposed project approach, and the fee schedule. Awardees must provide proof of workers compensation, liability, and vehicle insurance, including a waiver of subrogation and naming the State of Connecticut and NHCOG as additional insureds within ten days of the award. Required documentation also includes a Non-Collusion Affidavit and certifications of non-discrimination.
DAS Procurement

POSTED

about 9 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract involves the engineering design and system layout for a new fire alarm system tailored to meet the stringent safety requirements of a correctional facility, ensuring full compliance with NFPA 72 standards. The scope encompasses integrated design work that aligns with institutional safety protocols, requiring technical expertise in both fire protection systems and the unique operational constraints of correctional environments. All deliverables must address reliability, accessibility, durability, and regulatory adherence under high-security conditions, with considerations for inmate supervision, staff response, and system redundancy. This is a subcontract under the State of North Carolina's Construction Office, classified under NAICS code 541330 for architectural and engineering services. The solicitation was posted on July 28, 2026, with a response deadline of August 27, 2026. Performance location is within North Carolina, though specific facility details are not provided. The contract requires proposers to demonstrate proven experience in correctional facility systems and familiarity with state and national fire safety codes. All work must adhere to state procurement guidelines, and proposals must be submitted prior to the deadline to be considered for award.

General Info

Design and install NFPA 72-compliant fire alarm system for North Carolina correctional facility by August 27, 2026.

Documents

This scope was carved out of SCO-25-29808-01A.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

North Carolina Department of Adult Correction

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNorth Carolina → State of NC - Construction Office
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Engineering design, system layout, and compliance for a new fire alarm system integrated with correctional facility safety protocols and NFPA 72 standards.

More opportunities from North Carolina → State of NC - Construction Office

Same awarding agency

NAICS: 238220
SLED
North Carolina Department of Public Safety
Solicitation # SCO-25-30005-01A
The North Carolina Department of Public Safety is soliciting lump sum, single prime proposals for the Cabarrus YDC BAS Renovation project located at the Cabarrus Youth Development Center in Concord, North Carolina. The base scope of work includes the installation of a new Building Automation System, a new fire alarm panel, and a new smoke control system integrated with the existing fire alarm system. Additionally, the project includes two optional alternates: P1 for the replacement of domestic hot water heaters at the YDC facility and P2 for the replacement of domestic hot water heaters at the adjacent JDC facility. Bidders must hold the appropriate state licensure, with general contractors requiring an Unlimited classification under G.S. 87-1. A mandatory pre-bid meeting was scheduled for October 28, 2026, and failure to attend results in disqualification. Proposals must be submitted in sealed envelopes by November 17, 2026, with specific delivery requirements for the project site or the NCDPS Engineering office in Raleigh. Required financial securities include a bid deposit or bond of at least 5% of the proposal, as well as performance and payment bonds for 100% of the contract price. Payment terms are structured at 95% of monthly estimates, with the final payment issued upon the completion and acceptance of the work.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

8 days ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS