Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on July 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fire Alarm System Repair

Closed
2100253State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Dallas Area Rapid Transit (DART) is soliciting bids for Fire Alarm System Repair services at its CROF Facility located at 555 S 2nd Avenue, Dallas, TX 75226. Only qualified firms that fully comply with the Scope of Work requirements will be considered responsive, and the contract will be awarded to the vendor submitting the lowest acceptable price. All submissions must be made through the Bonfire platform, where detailed bid instructions and response fields are accessible only after initiating the “Prepare Your Submission” process. Bids must adhere to FOB Destination shipping terms, with all freight costs included in the quoted price, and DART will not accept FOB Origin or Prepay and Add terms. Timely delivery is critical, and failure to meet agreed-upon timelines may result in contract rejection or default termination. Payment terms are strictly Net 30, with invoices required to be submitted in triplicate to APInvoices@dart.org, clearly referencing the purchase order number, item details, quantities, unit prices, and extended totals; one copy must be marked “Original.” Payment will be processed 30 days from receipt of the invoice or the order, whichever is later, and partial deliveries may be paid if they meet accepted thresholds. DART reserves the right to terminate the contract for default if the vendor fails to perform within specified timeframes, and the vendor may be held liable for reprocurement costs or other damages. However, if the failure to perform is beyond the vendor’s or their subcontractors’ control, fault, or negligence, termination may be reclassified as for convenience. All purchase orders are governed by DART’s standard Terms and Conditions, which are available in the supporting documentation.

General Info

DART seeks lowest-priced fire alarm repairs at CROF Facility, net 30 payment, Bonfire submissions, FOB Destination, strict deadlines.

NAICS

N/A

Place of Performance

TX, USA

Set-Aside

NONE

Documents

3

Purchase Order Terms and Conditions - Dallas Area Rapid Transit Authority

PDF, High priority: read this first4 pages · contract-document
High

Schedule.pdf

PDF

SOW Fire Alarm Repair FA2 Building.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Dallas Area Rapid Transit
Contacts2 people available
OfficeTX, USA
Office AddressTX, USA

Full Description

Show more
Dallas Area Rapid Transit (DART) is seeking bids from **qualified firms** to provide Fire Alarm System Repair services at 1 (One) DART Facility listed below.
Please review this opportunity and all of the attached documents. This opportunity will be awarded to one vendor offering the lowest acceptable pricing. All vendors must meet all the requirements in the Scope of Work (SOW) in order to be considered responsive.
LOCATION(S) / FACILITIES INCLUDED The Contractor shall provide services at the following DART facility:
CROF Facility: 1. CROF 555 S 2nd Avenue, Dallas, TX 75226
--- ***BONFIRE REGISTRATION IS REQUIRED TO ACCESS DETAILS / BIDTABLE*** *To access details / BidTable, please initiate the "Prepare Your Submission" process at the bottom of the page -- Thereafter, locate the in-browser BidTable window and scroll right for project details and vendor response fields.*
--- **PURCHASE ORDER TERMS AND CONDITIONS** -- All purchase orders are subject to Dallas Area Rapid Transit Authority's Terms and Conditions. The complete PO Terms and Conditions PDF is available for download in the "Supporting Documentation" section below.
**Freight Terms Notice -** Please ensure that all bids/quotes reflect FOB Destination shipping terms with the freight cost included in the overall price. DART does not typically accept FOB Origin or Prepay and Add terms.
**Delivery Terms Notice -** Time and rate of deliveries are of the essence of this order. Seller's failure to deliver at the time and rate specified shall be the basis for rejection and default termination by the Authority (*Dallas Area Rapid Transit Authority*).
**Payment Terms Notice -** All vendors are advised that DART's payment terms are Net 30. Invoices shall be submitted (APInvoices@dart.org) in triplicate (one copy shall be marked 'Original"), unless otherwise specified, and shall contain the following information: purchase order number; item number; purchase order description of supplies, services, or construction; sizes; quantities; unit prices; and extended totals. Unless otherwise specified, payment will be made on partial deliveries accepted by the Authority when the amount due on such deliveries so warrants. *Invoices will be paid 30 days from receipt of the invoice or 30 days from receipt of the order, whichever is later, unless other payment terms have been agreed upon in writing.*
**Termination for Default Notice -** The Contracting Officer may by written notice terminate this order, in whole or in part, for failure of the Seller to perform any of the provisions hereof within the time periods specified. In such event, the Seller shall be liable for damages, including the excess cost of reprocuring similar supplies or services or completing construction; provided that, if (i) it is determined for any reason that the Seller was not in default, or (ii) the Seller's failure to perform is without his and his subcontractor's control, fault, or negligence, the termination shall be deemed to be a termination for convenience under paragraph 12. As used in this provision, the term "subcontractor" and "subcontractors" means subcontractors, vendors, and suppliers at any level.

More opportunities from Texas → Dallas Area Rapid Transit

Same awarding agency

NAICS: 541330
SLED
Trinity Railway Express (TRE) 2MT IH-35E Design
Solicitation # P-2096182
Dallas Area Rapid Transit is soliciting professional engineering design services for the Trinity Railway Express Second Main Track project in Dallas, Texas. The scope of work involves preparing construction documents for 1.95 miles of double track from I-35E to the Mockingbird Lane grade separation. Key technical requirements include the replacement of the DART Rail Bridge at I-35E and SH 183 Lower Stemmons, the relocation of the historic Tresse Bridge, and the construction of new bridges over Inwood Boulevard and the Knights Branch and Noble Branch stream crossings. The design must adhere to a 18.5 foot vertical clearance requirement for the I-35E freight corridor and accommodate design speeds of 60 mph for freight and 79 mph for passenger rail. The project integrates with the Harry Hines Boulevard Transportation Master Plan, requiring the evaluation of multiple intersection layout alternatives to improve connectivity, accessibility, and safety for multimodal users. Deliverables include detailed design schematics, conceptual phasing plans, and technical specifications for steel and concrete materials. The winning bidder must sign a confidentiality agreement and ensure all personnel complete specialized training on new bridge design and construction methods. Coordination with the Texas Department of Transportation Dallas District is required to manage traffic control and track alignment shifts during the phased construction process.
Engineering Services

POSTED

8 days ago

DEADLINE

in about 2 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS