This Solicitation opportunity from Florida was posted on January 9, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fire Hydrant and Valve Inspection and Maintenance

Closed
252670MRState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days for substantial completion. The contract is administered by the City of Belmont with Willis Engineers serving as the project engineer. Award will be granted to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on the submission of required MWBE documentation, including the Good Faith Efforts Form and Table A. Bidders must adhere to strict material standards, specifically using Class 250 ductile iron pipe with Protecto 401 lining. Contractual requirements include the provision of performance and payment bonds, proof of insurance, and compliance with EJCDC standard general and supplementary conditions. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the installation of FRP reinforcing systems and access hatches. Mechanical and infrastructure requirements include the relining, modification, or replacement of steel and ductile iron pipes, installation of valves and piping appurtenances, modifications to sluice gates, and the installation of new slide gates and access platforms. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and extensive electrical and instrumentation upgrades, including motor control center component replacement. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid. Requested quotes for services and supplies, including lead abatement, metals fabrication, painting, and trucking, are due by November 17, 2026, ahead of the project bid date on November 18, 2026. Any exceptions to standard subcontract documents must be submitted as redlines along with the quote.
Garney Pacific, Inc.

POSTED

about 4 hours ago

DEADLINE

in 20 days

General Info

Documents

1

Sarasota County IFB 252670MR - Fire Hydrant and Valve Inspection and Maintenance

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Public Utilities
Contacts1 person available
OfficeN/A
Organization / AgencyFlorida → Public Utilities
Office AddressN/A

Full Description

Show more
Sarasota County is seeking fire hydrant maintenance services. This project will include fire hydrant annual inspections with flushing, and valve inspections and maintenance services. The County anticipates an initial contract term of 3 years. Refer to the Solicitation Documents and Attachments section for minimum qualifications, scope/specifications, and insurance requirements. 

More opportunities from Florida → Public Utilities

Same awarding agency

NAICS: 238210
New
SLED
Northeast Advanced Pollution Control Facility Install Generator Docking Station at Sand Filter and Reclaim Buildings
Solicitation # 21-0019-UT
The City of Clearwater is soliciting bids for solicitation number 21-0019-UT to install generator docking stations at the Sand Filter and Reclaim Buildings of the Northeast Advanced Pollution Control Facility in Florida. The scope of work includes the installation of new docking stations, all associated electrical work, and selective demolition of obsolete equipment. Key deliverables include the construction of reinforced equipment pads and housekeeping pads, with an optional alternate for canopy foundations and pipe bollards. The project requires strict adherence to the Florida Building Code, NFPA 70, and specific safety standards, including the Florida Trench Safety Act and OSHA excavation regulations. The contract will be awarded as a single award to the lowest responsive and responsible bidder based on the combined bid total for both buildings. Bidders must provide bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds upon selection. Technical requirements include the application of specific arc flash labels compliant with UL969 and ANSI Z535.4, as well as the use of U.L. listed firestopping tested under ASTM E 814. Submissions must be made via the eProcurement portal or as sealed hard copies by the deadline of December 16, 2026, and must include various certifications, including a drug-free workplace certificate and E-Verify form.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

about 13 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237110
New
SLED
Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261
Solicitation # IFB-438-26-JM
The City of Hollywood, Florida, has issued Invitation for Bid IFB-438-26-JM (Project No. 25-4261) for the Water Treatment Plant Maintenance Package A. This project involves the repair and replacement of critical facilities at the Water Treatment Plant located at 3441 Hollywood Boulevard. The scope of work is divided into six primary elements: lime silo repairs, replacement of silo dust collectors, replacement of the sludge drum thickener and associated building repairs, replacement of valves for storage tanks 3 and 4, and the replacement of clearwell sample lines. The contract requires the contractor to provide all necessary labor, materials, and equipment, adhering to technical specifications from Arcadis U.S., Inc. and standards from organizations such as AWWA, FDEP, and OSHA. The contract will be awarded to the lowest responsive and responsible bidder, with bids due by November 25, 2026, via the OpenGov portal. According to Addendum 1, the project timeline is set for substantial completion within 615 calendar days and final completion within 645 calendar days from the Notice to Proceed. Financial protections include a 5% retainage on payments and liquidated damages of $2,500 per day for delays. Contractors must provide performance and payment bonds equal to the contract price and comply with US Department of Labor prevailing wage requirements for Broward County. The project also includes a City contingency allowance of up to $250,000 in the base bid and $300,000 in the bid alternate.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 28 days
View Details
NAICS: 541330
New
SLED
PROFESSIONAL SERVICES RELATED TO WATER AND WASTEWATER DISTRIBUTION, TRANSMISSION & WASTEWATER COLLECTION PROGRAM MANAGEMENT (PROJECT NO. 26-1352)
Solicitation # RFQ-428-26-JM
The City of Hollywood, Florida, is soliciting proposals under RFQ-428-26-JM for a professional program management team to lead the implementation of its Water and Wastewater Master Plan. This initiative involves overseeing a comprehensive list of 124 utility projects scheduled from 2026 through 2035, including water main replacements, lift station rehabilitations, sewer extensions, and upgrades to the Southern Regional Wastewater Treatment Plant. The selected consultant will be responsible for project planning, design, permitting, and construction management, ensuring infrastructure can meet future population demands and mitigate risks from sea level rise and storm surges. The contract features an initial five-year term with two optional two-year renewal periods. Procurement is conducted in accordance with the Consultants Competitive Negotiation Act of Florida, with selection based on personnel quality, past performance, and firm qualifications, which account for 25 percent of the evaluation. Proposals must be submitted electronically via the OpenGov portal by November 17, 2026, and must not include pricing, as compensation is negotiated after the short-listing process. The project is subject to various Florida Statutes, including prohibitions against contingent fees and specific certifications regarding foreign business operations. Technical requirements include strict marking and labeling for non-potable water facilities and the integration of cybersecurity preparedness within facility operation and maintenance manuals.
Engineering Services

POSTED

2 days ago

DEADLINE

in 20 days
View Details
NAICS: 237110
New
SLED
Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262
Solicitation # IFB-440-26-JM
The City of Hollywood, Florida, is soliciting bids for Water Treatment Plant Maintenance Package B, Project No. 25-4262, under solicitation IFB-440-26-JM. The project involves the demolition and installation of critical process systems and equipment at the City of Hollywood Water Treatment Facility. Major work elements include the removal and replacement of lime slaker systems 2 and 3, the filter surface wash system, and the sodium hexametaphosphate feed system, as well as the reconfiguration of the standby sludge pump and replacement of associated piping and flushing water lines. The scope encompasses all necessary structural repairs, electrical work, controls, and instrumentation, concluding with start-up, testing, and commissioning to ensure fully operational systems. The contract requires the prime contractor to hold an active Florida General Contractor license and adhere to U.S. Department of Labor prevailing wage rates for Broward County. Performance and payment bonds equal to the contract price are required, along with a 12-month guarantee against poor workmanship. The project timeline allows 365 days for final completion, with liquidated damages set at 500 dollars per day for delays. Additionally, the contractor is liable for 10,000 dollars per day for any water quality violations resulting in a boil water notice caused by their actions. Award will be granted to the lowest responsive and responsible bidder, with a local preference policy allowing Hollywood-based vendors to compete if their bid is within 5 percent of the lowest non-local bid.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
SLED
Water Treatment Plant MS/RO Chemical Area Recoating; Project No. 25-4262A
Solicitation # IFB-441-26-JM
The City of Hollywood, Florida, is soliciting bids under IFB-441-26-JM (Project No. 25-4262A) for the rehabilitation of chemical storage and containment areas at the Water Treatment Facility MS/RO chemical storage area. The scope of work includes demolition, disposal, and surface preparation of the bulk chemical storage area, the application of a new chemical-resistant coating system consisting of a high solids epoxy-polyamine primer and 100 percent solids phenol novolac coating, and the replacement of the pump-out system including all associated piping, valves, electrical controls, and appurtenances. Additionally, the contractor is responsible for concrete repairs and epoxy injection for cracks as directed by the Engineer. Bids are due by December 3, 2026, at 3:00 pm via the OpenGov portal, with the contract being awarded to the lowest responsive and responsible bidder. The project is subject to strict compliance with US Department of Labor prevailing wage standards for Broward County and requires the contractor to provide performance and payment bonds equal to 100 percent of the contract price. Insurance requirements include Commercial General Liability, Pollution Liability, and Commercial Automobile Liability, with the City named as an additional insured. Key personnel requirements include a CQC Plan Manager with at least 10 years of experience and an Instrumentation and Control Systems Contractor with a minimum of five years in the PLC-based control systems business. The contract includes a 5 percent retainage and liquidated damages of 500 dollars per day for delays. All work must be completed in accordance with technical specifications, including SSPC cleaning standards and the 2023 Florida Building Code.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS