Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Fire Station 9 Redevelopment

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Fire Station 9 Redevelopment project, managed by the Contra Costa County Fire Protection District, involves the demolition and reconstruction of an operational fire station on a 0.92-acre site located at 209 Center Avenue, Pacheco, California. The project replaces an outdated 2,215-square-foot facility with a modern, 15,400-square-foot two-story building designed to support a double-company operation. The new structure will feature three apparatus bays and extensive interior facilities, including nine dorm rooms, a battalion chief's office, a multipurpose room, and specialized crew quarters. To ensure sustainability, the building must comply with LEED Silver standards. Site improvements include the installation of an equipment yard, two fuel tanks, an emergency generator, stormwater retention basins, and a 6-foot-tall privacy wall. The project also requires the removal of mature redwood trees and a front yard setback variance of 4 to 10 feet. Construction is scheduled to begin in late 2026 and is expected to last approximately 17 months. The project will follow a phased timeline starting with a two-month demolition period, followed by one month for site grading and one month for utility trenching. The primary building construction and interior work are estimated to take 12 months, concluding with two months of final site work, paving, and landscaping. Approximately 2,000 cubic yards of fill material will be used during construction. This project is identified under solicitation number WH728B with NAICS code 236220.

General Info

Demolish old Fire Station 9, build new 15,400 sq ft double-company station on same site by late 2026.

Agency

California → Contra Costa County Fire Protection District

Place of Performance

Center Avenue and Blackwood Drive, CA, 94553

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Contra Costa County Fire Protection District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Contra Costa County Fire Protection District
Office AddressN/A
Contacts
Christian MontoyaEnvironmental Analyst
Sam NicholsAssistant Chief, Support Services

Full Description

Show more
The proposed project would demolish and reconstruct an operational fire station on the same site (0.92 acre). The existing station, which was constructed in 1956, is outdated and unable to support the staff or equipment needed for a modern fire protection agency. The new fire station building would be larger than the fire station that currently exists. The current station is a 2,215-square-foot single company, one-story station with two apparatus bays. The new structure would be an approximately 15,400-square-foot double-company, two-story station with three apparatus bays that would have a maximum height of 35 feet. The existing station has a three-person crew with one captain, one engineer, and one firefighter that works a 48-hour shift; it houses two fire engines. The new fire station would include offices and crew quarters for up to nine firefighters during their 48-hour shifts and an apparatus bay for storing three fire engines when not on call. The office/crew quarters portion of the building would include a lobby area, a battalion chief's office, station office, nine dorm rooms, a kitchen, dining and day rooms, an exercise room, a laundry room, a communications/IT room, multipurpose room, and five restrooms. The apparatus bay would include turnout and washrooms, gear storage rooms, a restroom, storage and compressor rooms, and mechanical and electrical rooms. The project would comply with Leadership in Energy and Environmental Design (LEED) Silver standard requirements which provides a framework for healthy, efficient, and cost-effective green buildings. The parcel would also be developed with paved areas for parking and an equipment yard for on-site vehicle cleaning and maintenance, along with two fuel tanks, an emergency generator, and a trash enclosure. In addition, landscaping and pedestrian walkways would be installed at the fire station entrance; stormwater retention basins would be installed within the landscaping throughout the parcel. Existing mature redwood trees at the corner of Center Avenue and Blackwood Drive would need to be removed from the project site. A 6-foot-tall privacy wall would be installed along Blackwood Drive, around the back of the property, and along Grayson Creek. The project would require the following variance and exception: • A front yard setback of approximately 4 to 10 feet is required. Access, Circulation, and Parking Fire engines would leave the station via Center Avenue and enter the station from Blackwood Drive. Three visitor parking spaces would be provided in the front parking lot that would be accessed from Center Avenue. Up to 16 employee parking spaces and two bike racks, for a total of four bikes, would be provided behind the building; these could be accessed from either Blackwood Drive or Center Avenue through automatic gates. Site plans are attached. Construction Project construction is anticipated to begin in late 2026 and take approximately 17 months. The first phase of construction would involve demolition of the existing fire station, which would take approximately 2 months. Site preparation, including grading activities, would take approximately 1 month. Trenching and utility line preparation would then occur and take approximately 1 month to complete. Construction of the building and its interior would follow and take approximately 12 months to complete. Following building construction, site work, including paving and landscaping, would take approximately 2 months to complete. A total of 2,000 cubic yards of fill material is anticipated over the course of project construction.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for comprehensive interior modernization. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms by replacing vanities and lavatories, and updating interior surfaces with new paint. Technical upgrades involve installing raised flooring and electrical distribution to support classroom needs, implementing simple dimming lighting controls, replacing lamps, ballasts, and ceiling fans, and replacing variable air volume systems to correct HVAC and plumbing deficiencies. The project also encompasses the installation of new signage and ensures all work complies with ADA accessibility guidelines. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeframe of 425 calendar days after the notice to proceed. Award will be determined using a best suited negotiate methodology, evaluating price alongside past performance and corporate relevant experience. The contractor is required to provide performance and payment bonds equal to 100 percent of the contract price and must adhere to specific prevailing wage rates for the Georgia region. Quality control is strictly managed through a required Construction QC Plan, with a multi-stage inspection process including punch-out, pre-final, and final acceptance inspections. Proposals must be submitted electronically to the contracting officer by November 9, 2026.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 12 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, located at MCB Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Critical infrastructure upgrades include new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, updated electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project encompasses site improvements such as paving removal and replacement, drainage upgrades, water, sanitary, and storm system repairs, and hazardous materials abatement. The estimated contract value ranges between 10 million and 25 million dollars, with a performance period of 730 days after award. Award will be based on the lowest price, evaluated by combining the costs for building renovation and paving replacement. Bidders must adhere to Davis-Bacon Act wage determinations and Buy American requirements. Bonding requirements are tiered, with proposals exceeding 150,000 dollars requiring bid, payment, and performance bonds. Contractors must submit a Quality Control Plan for approval prior to construction and utilize a three-phase control process for each Definable Feature of Work. Invoicing is managed through Wide Area Work Flow with specific NAVFAC form requirements.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 26 days
View Details
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific performance area in Riverside or Los Angeles, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 27, 2026, with a response deadline of November 4, 2026. To secure project financing, bidders must strictly adhere to Disadvantaged Business Enterprise Good Faith Effort (GFE) requirements. Bids will be deemed non-responsive if they fail to include proof of GFE #2, requiring solicitations to be posted in an online publication for 30 consecutive calendar days and in a print newspaper for one day prior to the bid opening. Additionally, proof of utilizing the Small Business Administration (SBA) and Minority Business Development Agency (MBDA) per GFE #5 must be submitted with the bid package. Documentation for outreach efforts under GFE #1 may be submitted up to three business days after the bid closing. Prime contractors are further required to flow down these GFE requirements to any subcontractors they award.
RT CONTRACTOR CORP

POSTED

about 3 hours ago

DEADLINE

in 7 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, mechanical and electrical utilities, and an underground stormwater retention system. An additional option for the P1016 facility includes the construction of a 17,978 square foot laboratory and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection, among others. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that impacted the first, second, and third floors, including dormitories, offices, and medical areas. The scope of work involves comprehensive architectural repairs, including the replacement of drywall, painting, ceiling tiles, flooring, and rubber wall bases, as well as electrical and plumbing restoration to return the facility to its original condition. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Award will be based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Requirements include a valid Massachusetts Contractor's License, compliance with NFPA-101 Life Safety Code, OSHA, EPA, and ADA regulations, and adherence to Davis-Bacon Act wage determinations. Contractors must provide a one-year workmanship guarantee and a 20-year product warranty for Luxury Vinyl Plank flooring.
Grafton Job Corps

POSTED

about 3 hours ago

DEADLINE

in 20 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS