Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Colorado was posted on July 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Firestone Reservoir No. 2 Infrastructure Design

Closed
W2025-9537.01State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 10 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The contract W2025-9537.01 pertains to the engineering design and preparation of construction bidding documents for the infrastructure development of Firestone Reservoir No. 2 in Weld County, Colorado. The project encompasses designing a pumping system to transfer water from Reservoir 2 to Reservoir 1, constructing two grouted riprap channels for water inflow from a ditch diversion pipe, and implementing riprap slope protection, which includes a grouted riprap boat launch. The scope aims to enhance water conveyance and protection facilities at the site, supporting the Town of Firestone’s water infrastructure needs. This solicitation was issued on July 24, 2025, with a response deadline of August 22, 2025. The project is classified under NAICS code 237310, which covers water and sewer line and related structures construction, and has an estimated value ranging from $500,000 to $2,000,000. The contract is managed by the Town of Firestone, Colorado, with Julie Pasillas serving as the primary contact. Interested parties can find additional details and submit responses through the designated procurement platform.

General Info

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 10 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 14 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyColorado → Town of Firestone
Contacts1 person available
OfficeN/A

Full Description

Show more
W2025-9537.01 - Design of Infrastructure for Firestone Reservoir No. 2. Located in Weld County, Colorado, within the Town of Firestone. The project involves the engineering design and creation of construction bidding documents for: 1) a pumping system to move water from Reservoir 2 to Reservoir 1, 2) two grouted riprap channels for water inflow from the ditch diversion pipe, and 3) riprap slope protection that includes a grouted riprap boat launch.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS