Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

First Article Testing (FAT) and Approval Services

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract requires comprehensive first article inspection and testing of the Shift Rod Assembly, encompassing dimensional accuracy, material composition, and surface finish verification to ensure strict adherence to specified standards. All testing must be conducted in accordance with the DI-NDTI-80809B requirements, and a compliant report must be submitted for government approval prior to the commencement of any production activities. The work is classified as a subcontract under NAICS code 541330, performed for the Defense Logistics Agency under the Department of Defense, with the intent to validate the assembly's conformity before mass manufacturing. Approval hinges on the completeness and accuracy of the inspection documentation, making the report a critical gatekeeper to production authorization.

General Info

First article inspection and testing of Shift Rod Assembly per DI-NDTI-80809B required before production approval.

Agency

Department Of Defense → Defense Logistics AgencyView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

This scope was carved out of SPE4A7-26-P-D876.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

SHIFT ROD ASSEMBLY

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Defense Logistics Agency
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → Defense Logistics Agency
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Perform full first article inspection and testing of the Shift Rod Assembly, including dimensional, material, and surface finish verification, and produce a DI-NDTI-80809B compliant report for government approval prior to production.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals for the Corydon Well Replacement Project (Work Order C2305) on behalf of the Elsinore Valley Municipal Water District in California. This professional services agreement seeks qualified DBE firms to provide comprehensive design, bidding support, and engineering services during construction. The scope is divided into two phases: Phase 1 focuses on civil site design, technical specifications, and construction management for the drilling of a new well and the abandonment of the existing one; Phase 2 covers architectural, civil, mechanical, structural, electrical, and I&C design drawings, as well as equipping, testing, and commissioning. Technical requirements specify the use of 24-inch diameter stainless steel Ful-Flo louvered well screens and compliance with AWWA potable water well construction standards, Riverside County, and California State Water Resources Control Board regulations. The contract is set aside for small and disadvantaged businesses, including DBE, WOSB, and SDVOSB entities. Award selection is based on the most advantageous proposal, considering both price and other factors. Key requirements include the provision of performance and payment bonds for 100 percent of the contract price, a bid guarantee of five percent, and adherence to California prevailing wage laws. Consultants must maintain active SAM registration and provide a project manager as the primary point of contact. Payment is processed via monthly itemized statements, with a 45-day review and payment cycle. Proposals must be submitted via PlanetBids by September 1, 2026, and must include a cover letter, a detailed project approach, staff resumes, a five-year representative project list, and three professional references.
Ardurra Group, Inc.

POSTED

about 14 hours ago

DEADLINE

in 5 days
View Details

More opportunities from Department Of Defense → Defense Logistics Agency

Same awarding agency