Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Defense was posted on May 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

First Article Testing (FAT) Services

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS Units 1&2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing professional and technical services such as civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as utility locating, potholing, geotechnical and geophysical investigations, LIDAR surveying, BIM/3D modeling, and environmental assessment and compliance. Additional requirements include hazardous materials surveys, permitting support, and CPM scheduling. The solicitation specifically encourages participation from certified Disadvantaged Business Enterprises, including MBE, WBE, and OBE firms. Interested bidders must contact Kiewit to receive an Invitation to Bid through the Building Connected system, with a bid deadline of September 11, 2026. To be considered responsive, firms must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, though Kiewit will reimburse the bond premiums. Kiewit is a signatory to several collective bargaining agreements and requires bidders to demonstrate an ability to maintain labor harmony on the project. Plans and specifications are available for review at Kiewit's Costa Mesa, California office, and further inquiries should be directed to Lead Estimator Joe Bockelman.
Kiewit Infrastructure West Co.

POSTED

about 8 hours ago

DEADLINE

in 18 days
NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending a gravity trunk sewer line to unsewered areas, decommissioning existing pump stations in the Romaine Village area, and installing service laterals to transition properties from private septic systems to public sewer. The scope may also include roadway reconstruction, ADA curb ramp and curb design, and minor transportation improvements such as turn lanes or mini roundabouts. The project is funded by the Clean Water State Revolving Fund administered through the Oregon Department of Environmental Quality, with a total design and construction budget of 3,875,000 dollars. The procurement process is managed by the City of Bend, with a proposal deadline of September 29, 2026. Selection is based on technical and administrative capabilities, with the potential for interviews to influence final scoring. Key deliverables include a preliminary engineering report, a public outreach plan, and construction contract documents at 30, 60, 90, and 100 percent completion, culminating in record drawings. The City intends to advertise for construction services in Fall or Winter 2027. Parametrix is actively soliciting firms with recognized federal, tribal, state, local, or independent DBE certifications as part of a good faith effort to include small, minority-owned, women-owned, and veteran-owned businesses.
Parametrix

POSTED

about 8 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The contract involves performing First Article Testing (FAT) services to validate the design and production processes of an exhaust component. The scope includes comprehensive inspections, material verification, and the preparation of detailed test reports, all conducted in accordance with defense standards. This ensures that the manufacturing and quality control processes meet the stringent requirements set by the Department of Defense. Issued by the Supplier Operations Support Division within the Department of Defense, this subcontract under NAICS code 541330 focuses on technical testing and engineering services. The solicitation was posted on May 18, 2026, with a response deadline of May 26, 2026. Specific location details for performance are not provided, and the contract emphasizes adherence to established defense protocols to guarantee component reliability and compliance.

General Info

Perform First Article Testing of exhaust components with inspections and reports per DoD standards.

Agency

Department Of Defense → SUPPLIER OPER SUPPLIER SPT DIVView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

USA

Set-Aside

NONE

Documents

This scope was carved out of SPE4A4-26-T-0117.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

GOVERNMENT FIRST ARTIC

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → SUPPLIER OPER SUPPLIER SPT DIV
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → SUPPLIER OPER SUPPLIER SPT DIV
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Execution and documentation of First Article Testing to validate design and production processes for the exhaust component, including full inspection, material verification, and test reporting per defense standards.

More opportunities from Department Of Defense → SUPPLIER OPER SUPPLIER SPT DIV

Same awarding agency

NAICS: 336413
DIBBS
GOVERNMENT FIRST ARTICLE TEST
Solicitation # SPE4A4-26-Q-0018
Solicitation SPE4A4-26-Q-0018 is a fixed-price request for quotations from the Department of Defense, specifically DLA Aviation, for ten units of structural support (NSN 1560-01-142-3742). The items are designated as Air Force Critical Safety Items and must be manufactured according to specific reference drawings and Quality Assurance Provision QAP 13873 QAP-106. Delivery is required within 359 days after the date of order, with both inspection and acceptance occurring at the origin. The government will determine the best value based on a comparative assessment of price and non-price factors, with significant weight placed on past performance, specifically SPRS assessments and historical quality and delivery compliance. The contract imposes strict technical and security requirements, including compliance with CMMC Level 2 and DFARS 252.204-7012 for safeguarding covered defense information. Technical data is subject to ITAR and EAR export controls, and vendors must adhere to a Northrop Grumman license agreement regarding restricted technical data. Packaging and marking must comply with MIL-STD-129 and RP001, though item unique identification is not required. Invoicing must be processed through the Wide Area WorkFlow system. Quotations are due by October 28, 2026, to the DLA Aviation office in Richmond, Virginia.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

16 days ago

DEADLINE

in about 2 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS