Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on June 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fixed-Wind Forward Looking Infrared (FLIR) Camera Survey for Wildlife Big Game Program

Closed
802-26-74009State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541360
New
SLED
City of Norco 2050 General Plan Update Project
Solicitation # 2024110840
The City of Norco is undertaking the 2050 General Plan Update Project to establish a long-term vision for land use, development patterns, infrastructure planning, and resource conservation within the city's incorporated limits. The project focuses on preserving the rural, equestrian-oriented atmosphere of residential agricultural neighborhoods, supporting local businesses, and creating a prominent downtown identity. To comply with State Planning and Zoning Law, the update includes six mandatory elements: Land Use and Community Character, Circulation, Infrastructure and Facilities, Open Space and Conservation, Safety, and Noise. The plan incorporates goals and policies developed through community outreach to enhance public facilities, parks, and transportation safety. The project is managed by the Community Development Director, Colby Cataldi, with support from Meridian Consultants. A Program Environmental Impact Report has been developed to ensure compliance with CEQA guidelines, identifying a significant environmental impact regarding paleontological resources that requires specific mitigation. The project also mandates adherence to the Americans with Disabilities Act for pedestrian infrastructure and requires strict confidentiality regarding tribal cultural resources. Additionally, any construction activities involving soil disturbance must comply with NPDES General Permit requirements, including the development of a Stormwater Pollution Prevention Plan. The public review period for the draft environmental documents was scheduled from August 14, 2026, to September 28, 2026.
City of Norco

POSTED

7 days ago

DEADLINE

N/A

AI Contract Overview

Show more

The Texas Parks and Wildlife Department is soliciting proposals under RFP 802-26-74009 to establish a blanket contract for fixed-wing Forward-Looking Infrared (FLIR) camera surveys aimed at accurately estimating populations of desert big game species including mule deer, pronghorn, bighorn sheep, aoudad, and elk. Operations require aircraft with a minimum of 200 horsepower per engine and 87 knots true airspeed, conducting surveys at 1,500 feet above ground level with missions lasting up to six hours and covering at least 50 percent of assigned transects. Contractors are responsible for all equipment, personnel, logistics, and operational costs and must deliver comprehensive reports within 15 business days post-survey containing GPS-located detection data with ≤20m accuracy, timestamps, KML and .shp GIS files, representative video clips, and an Excel spreadsheet detailing species, times, distances, and coordinates. All work must comply with FAA standards, acceptable industry practices, and Texas Administrative Code §20.115, with inspections conducted by TPWD to ensure conformance. Proposals must be submitted via hard copy or email by 2:00 PM Central Time on June 25, 2026, referencing RFP 802-26-74009 on all documentation and including one signed original marked as such. The evaluation is based on a best value approach with equal weighting of 35 percent each for qualifications and experience including company profile, equipment, and past performance, and for expertise in pilot qualifications, safety, and operational effectiveness including personnel certifications and safety records; 15 percent each for pricing and technical proposal. Contractors must submit nine exhibits including detailed company profiles, key personnel resumes capped at one page each, equipment lists, licenses, safety records, and past project references, all accompanied by a signed Execution of Proposal containing certifications on truthfulness, lobbying restrictions, antitrust compliance, Texas residency, SAM registration status, and federal debarment status. Additional requirements include compliance with E-Verify, drug-free workplace standards, immigration verification under IRCA, indemnification of Texas and TPWD against claims, disclosure of former TPWD employees and relatives, felony convictions, and insurance policies issued by carriers with an A.M. Best “A” rating or better, with failure to meet any pass/fail criteria leading to disqualification. Payment will be processed by TPWD Accounts Payable at

General Info

Texas Parks seeks FLIR survey provider for desert big game population estimates, proposals due June 2026.

Agency

Texas → Parks and Wildlife Department

Place of Performance

TX, USA

Set-Aside

NONE

Documents

2

RFP 802-26-74009 Fixed-Wing FLIR Camera Survey for Wildlife Big Game Program

PDF, High priority: read this firstrfp
High

Solicitation 802-26-74009 Addendum 1 - Fixed-Wing FLIR Camera Survey

PDF, High priority: read this firstamendment
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Solicitation

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Parks and Wildlife Department
Contacts1 person available
OfficeTX, USA
Organization / Agency
Texas → Parks and Wildlife Department
Office AddressTX, USA
Contacts

Full Description

Show more
Texas Parks and Wildlife Department (TPWD) is soliciting proposals to establish a blanket contract for an experienced provider to conduct Fixed-Wing Forward-Looking Infrared (FLIR) Camera Surveys to provide more accurate and precise desert big game population estimates.Species shall be inclusive of, but may not be limited to mule deer, pronghorn,bighorn sheep, and exotics such as aoudad and elk.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS