Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Fleet and Equipment Compliance (CARB)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract requires the provision and ongoing maintenance of vehicles and equipment that meet California Air Resources Board (CARB) compliance standards, ensuring all fleet operations adhere to stringent emissions regulations. Contractors must manage a fleet of compliant vehicles and equipment while maintaining accurate records and submitting annual CARB Fleet Compliance Certification to demonstrate adherence to regulatory requirements. This subcontract is part of a broader effort by the Public Works Department of the City of Santa Ana to reduce environmental impact through cleaner transportation technology and operational practices. The solicitation is open with a response deadline of August 13, 2026, and falls under NAICS code 484220, which pertains to specialized freight trucking services. While the agency is located in California, specific details regarding the physical location of performance, point of contact, or set-aside status are not provided. Bidders must be prepared to fulfill all CARB compliance obligations, including documentation, reporting, and continuous maintenance of equipment to sustain eligibility, with no additional set-aside classifications indicated. The contract is accessible via the specified vendor portal link for further submission details.

General Info

Provide and maintain CARB-compliant vehicles and equipment with annual certification and accurate records.

Agency

California → PUBLIC WORKS Department of City of Santa AnaView Agency

NAICS

484220 - Specialized Freight (except Used Goods) Trucking, LocalView NAICS

Place of Performance

CA, US

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → PUBLIC WORKS Department of City of Santa Ana
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → PUBLIC WORKS Department of City of Santa Ana
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provision and maintenance of CARB-compliant vehicles and equipment, including recordkeeping and submission of CARB Fleet Compliance Certification.

Similar Contracts

Same NAICS industry code

More opportunities from California → PUBLIC WORKS Department of City of Santa Ana

Same awarding agency

NAICS: 562910
New
SLED
Hazardous Waste and Material HandlingThe contract pertains to the management and disposal of hazardous materials, specifically chemical residues generated from sandblasting operations, ensuring full compliance with the Resource Conservation and Recovery Act and all applicable environmental regulations. The scope requires proper handling, storage, transportation, and ultimate disposal of these materials through licensed and approved pathways to safeguard public health and the environment. All activities must adhere to federal and state environmental standards, with documented procedures for tracking, recordkeeping, and reporting to maintain regulatory compliance throughout the lifecycle of waste handling. This is a subcontract solicitation issued by the Public Works Department of the City of Santa Ana, California, with a response deadline of August 13, 2026, at 9:00 PM. The North American Industry Classification System code 562910 designates the work within the waste treatment and disposal services category. Performance location is within the jurisdiction of the issuing agency, although specific address details are not provided. Interested parties must submit proposals by the stated deadline, and the procurement is open to qualified subcontractors capable of meeting the rigorous environmental and safety requirements for hazardous material handling. The contract portal for details is accessible via the provided link.
Remediation Services

POSTED

4 days ago

DEADLINE

in 18 days
View Details
NAICS: 237310
New
SLED
South Main Street Crosswalk Art InstallationThe City of Santa Ana is soliciting proposals for the design and installation of six crosswalk art installations along South Main Street, specifically at intersections with Walnut Avenue, Pine Street, and Pomona Avenue. The project requires precision sandblasting within designated 10-foot-wide, gutter-to-gutter areas and demands full compliance with federal, state, and local regulations including RCRA for hazardous waste, CARB Fleet Compliance, Cal OSHA standards, and the City’s Community Workforce Agreement for contracts exceeding $750,000. All submissions must be made electronically through the PlanetBids portal by 2:00 P.M. on August 13, 2026, with no exceptions for late or improperly transmitted bids. Proposers are solely responsible for ensuring system compatibility, internet stability, and correct electronic submission, and must include an executed bid bond equal to 10% of the proposed contract amount. Required attachments include certifications on debarment, non-lobbying, non-discrimination, non-collusion, CARB compliance, subcontractor designation, and a proposer’s certification regarding local business status, with documentation of California DGS small business certification needed to claim local preference. The evaluation process is based on a trade-off methodology, weighing technical approach and methodology (30 points), qualifications and experience (30 points), proposed staffing and resumes of key personnel (25 points), organization and completeness of the response (5 points), and cost proposal (10 points, awarded proportionally to the lowest price). An optional interview may add up to 20 bonus points, increasing the maximum possible score to 120. The Statement of Qualifications is capped at 20 pages, excluding cover pages, table of contents, and required certifications, while the cost proposal has no page limit but must be submitted alongside the SOQ. Work must be performed entirely in Santa Ana, CA, with the contractor responsible for all costs including shipping, handling, and delivery. The City retains authority for final inspection and acceptance, and contractors must adhere to strict spill liability, safety, and recordkeeping obligations, including reporting property damage within 24 hours and maintaining hazardous waste documentation. No federal FAR clauses apply, and the solicitation does not require UEI or CAGE codes, but local socioeconomic preferences for small businesses based in Santa Ana or Orange County are recognized. Payment will be processed via ACH within 45 days of invoice receipt, though no specific remittance address or accounting codes are provided,
Highway, Street, and Bridge Construction

POSTED

4 days ago

DEADLINE

in 18 days
View Details