Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity was posted on November 19, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Flight Line Tow Tractors

Closed
FA853308R24092Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

Agency

N/A

Contract Value

$0

NAICS

336112 - Light Truck and Utility Vehicle Manufacturing

Place of Performance

Not specified

Set-Aside

SBA

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

9 updates
PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Notice updated

Response deadline changed from Dec 5, 2008 to Mar 19, 2009. The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Mar 19, 2009 to May 11, 2009.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A

Full Description

Show more
This requirement is for a 5-year, Firm-Fixed Price, Requirements-type Indefinite-Delivery contract for the procurement of Flight Line Tow Tractors (FLTT), 4x2, Generic NSN: 1740-01-068-8945YW and Flight Line Tow Tractors (FLTT), 4x4, Generic NSN: 1740-01-452-4117YW, which are used to tow Aircraft Ground Equipment (AGE), munitions trailers, and military aircraft. The FLTT has a minimum Gross Vehicle Weight (GVW) of 8,000 pounds. The minimum Gross Vehicle Weight Rating (GVWR) for the commercial truck chassis required for the application is 9,500 pounds. The prime contractor shall maintain a 1,500 pound separation between the GVW and GVWR. The minimum Draw Bar Pull (DBP) force required for the FLTT is 4,500 pounds. The FLTT is used to tow trailers weighing up to 40,000 pounds and aircraft weighing up to 70,000 pounds on grades up to 2.5% on asphalt or concrete surfaces, and will be available in two-wheel or four-wheel drive variants. Material: Various The requirement will consist of one basic period of 12 months and 4 annual options. The best estimated quantities (BEQs) are as follows: Flight Line Tow Tractors, 4x2 - First Production Qty: BEQ 1 EA; Basic Production Qty: BEQ 239 EA; Option I Qty: BEQ 1-191 EA; Option II Qty: BEQ 1-208 EA; Option III Qty: BEQ 1-115 EA; Option IV Qty: BEQ 1-160 EA. Flight Line Tow Tractors, 4x4 - Basic Production Qty: BEQ 17 EA; Option I Qty: BEQ 1-9 EA; Option II Qty: BEQ 1-6 EA; Option III Qty: BEQ 1-12 EA; Option IV Qty: BEQ 1-10 EA. There is no minimum or maximum order amounts established. FAR Part 12 and FAR Part 15 procedures will be utilized with first production unit testing required. Multiple shipping locations are involved, to include both USAF and FMS requirements. Delivery schedule: 180 Days ARO. Offerors shall prepare their proposals in accordance with mandatory, explicit, and detailed instruction contained in the RFP. The Government will utilize the Performance Price Trade-off (PPT) procedures, and will evaluate proposals and make award in accordance with the Evaluation Basis for Award provision in the RFP. It is anticipated that the RFP will be released on or around 4 December 2008 and anticipated award on or before 24 April 2009. Electronic procedures will be used for this solicitation. To request a copy of this solicitation, go to http://www.fedbizopps.gov. All responsible sources may submit a bid, proposal, or quotation which shall be considered by the agency. All questions regarding the solicitation and/or the data package must be submitted in writing to Alicia.Vogel@robins.af.mil with a copy to Christie.Brown@robins.af.mil. No telephonic questions. All questions and answers will be uploaded to http://www.fedbizopps.gov ; however, the identity of the potential offeror will not be included. Offerors are encouraged to register to receive notification for solicitation and all amendments/revisions and to check the FEDBIZOPPS site prior to submission of quote. See Numbered Notes 1and 8.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS