Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Floating Dock Replacement and Dock Pile Relocation at Coronado Cays

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves the in-kind replacement of a 546-square-foot L-shaped floating dock at 29 The Point in Coronado, California, with a new dock of identical size and configuration, measuring approximately 58 feet in length. One existing 14-inch by 14-inch dock pile will be relocated to the end of the new structure using water-jetting, while the two 12-inch by 12-inch piles and the gangway will remain untouched. No additional piles or increased overwater coverage are proposed, ensuring no net change to the aquatic footprint. Construction is scheduled to occur in early 2026 and is expected to take about two weeks, with equipment staged on adjacent existing docks and removed afterward. The work is subject to strict environmental compliance protocols, including mandatory pre-construction surveys for eelgrass and Caulerpa prolifera, an invasive algae detected in San Diego Bay in Spring 2024. Although preliminary surveys found no presence of these species in the immediate area, a high-intensity survey must be conducted at least 60 days before a second eradication-level survey, which must occur no more than 40 days before any bottom-disturbing activity. If Caulerpa is detected, work must halt until regulatory agencies and the Southern California Caulerpa Action Team approve further steps. Best Management Practices such as silt curtains, north-south orientation of the dock, and minimization of environmental disturbance are required to protect aquatic vegetation and water quality. The project qualifies for categorical exemptions under CEQA Sections 15301 and 15302 due to its in-kind nature and lack of environmental expansion. The applicant, Swift Slip Dock & Pier Builders, Inc., is responsible for all compliance with federal, state, and local laws regarding stormwater, hazardous materials, and demolition debris, and must obtain necessary state receipts for environmental fees. No formal contract value, pricing structure, or competitive evaluation process is documented, suggesting a ministerial or non-competitive approval process tied to environmental permitting rather than traditional procurement. The San Diego Unified Port District serves as the lead agency, with Davin Cox as the primary point of contact, and no formal contracting officer, COR, or COTR designation is specified in the records.

General Info

In-kind replacement of 546 sq ft L-shaped dock at 29 The Point, Coronado, scheduled for early 2026 with strict environmental compliance.

Agency

California → San Diego Unified Port District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Coronado, CA

Set-Aside

NONE

Documents

(1)

2025-101 Winship Dock Replacement Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego Unified Port District
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Diego Unified Port District
Office AddressN/A
Contacts
Marissa MoralesPermit Coordinator

Full Description

Show more
The proposed project would involve the removal and replacement of an existing floating dock by Swift Slip Dock & Pier Builders, Inc. (Applicant) in the city of Coronado, California. Work to specifically complete the proposed project would involve the in-kind replacement of an existing 546 square foot (sf) “L”-shaped floating dock with a new 546 sf “L”-shaped dock measuring approximately 58 feet in length. An existing 14”x14” dock pile would be relocated from the “L” side of the existing dock to the end of the new dock, which would be water-jetted into place; the two (2) existing 12”x12” remaining dock piles and the existing gangway would remain in place. No new or larger piles are proposed as part of this project, and the replacement of the floating dock and relocation of the dock pile would result in no changes to overwater coverage and/or fill. A preliminary survey of the proposed project site was conducted in May 2024 and concluded that, although eelgrass was detected within the general project vicinity, the proposed dock replacement and piling relocation are not anticipated to impact any existing eelgrass in its ability to receive the adequate amount of light, through any changes to environmental conditions, or by construction. Best Management Practices (BMPs) and project design features, including, but not limited to, minimizing the footprint of the overwater structure, utilizing north-south orientation to the maximum extent, and the use of silt curtains, would be implemented. A pre-construction eelgrass survey would also be conducted prior to the commencement of the proposed project, and if changes in the above circumstances are found, the Applicant would be required to resubmit a new project application for review. Additionally, the proposed project would involve bottom disturbing activities within the infestation area limits of Caulerpa prolifera (Caulerpa), an invasive algae discovered within San Diego Bay in Spring 2024; as a result, additional verification steps are required as part of the proposed project per the Caulerpa Control Protocol (protocol). While Caulerpa was not detected within the project area during a preliminary survey in May 2024, the following surveys may be required prior to the commencement of the proposed project: • A high intensity survey within the project area, immediate surrounding seafloor area, and any barge staging areas (if outside the project area). This survey would follow the protocol and be performed at least 60 days before the second Caulerpa survey. • An eradication level (100% cover) survey, assuming Caulerpa is not detected during the first survey, of the same areas previously surveyed. This survey would be performed at least 60 days after the first survey and within 40 days of any bottom disturbing activities. Assuming no Caulerpa is detected from surveying activities, then the project may commence. If Caulerpa is detected, it must be reported following protocol and subsequent surveys and/or appropriate treatment efforts would be performed based on concurrence from regulatory agencies and the Southern California Caulerpa Action Team (SCCAT). Construction of the proposed project is anticipated to approximately occur in early 2026 and would take approximately two (2) weeks to complete, with ongoing maintenance as needed. Staging for construction equipment would be placed on the existing adjacent docks, and would be removed upon completion of the proposed project. Due to its nature and limited scope, construction of the proposed project would generate a minor amount of vehicle trips and would require limited use of equipment. Therefore, impacts related to air quality, greenhouse gas emissions, and transportation and traffic are not anticipated to occur. Furthermore, the Applicant would be responsible for complying with all applicable federal, state, and local laws regarding construction demolition debris, hazards and hazardous materials, and stormwater.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
City of Calgary - Request for Proposal - RFP 26-1667 For Glenmore RWPS Penstock Crossover Piping and Valve Replacement
Solicitation # AB-2026-05612
The City of Calgary is seeking qualified contractors to perform construction services for the Glenmore Raw Water Pump Station Penstock Crossover Piping and Valve Replacement project, which involves the complete replacement of existing penstock crossover piping and associated valves, demolition of the current standpipe, and lead abatement on existing infrastructure. The scope includes the supply, installation, testing, and commissioning of new crossover and standpipe piping systems, along with all valves, fittings, supports, steelwork, platform structures, grating, and other miscellaneous metalwork required to restore and enhance system functionality. All work must comply with applicable safety and environmental standards, particularly regarding lead abatement procedures. This opportunity is exclusively available to contractors pre-qualified by the City of Calgary and is issued under solicitation number AB-2026-05612, posted on August 8, 2026, with responses due by September 1, 2026. Proposals must be submitted via SAP Ariba, where detailed technical and administrative requirements are outlined in the RFP documents. The project is located in Alberta, and all inquiries should be directed to Waris Khattana, the primary point of contact, via the provided email or phone number. Only firms meeting the City’s pre-qualification criteria will be considered for award.
City of Calgary

POSTED

about 19 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237990
New
SLED
27003-B Solids Removal
Solicitation # PE-65600-NONST-2027-000000250
Fayette County, Georgia is soliciting bids for the dredging and solids removal from lagoons under solicitation number PE-65600-NONST-2027-000000250, titled 27003-B Solids Removal. Interested contractors must submit their proposals by 3:00 p.m. on Tuesday, September 8, 2026, to the Purchasing Department located at 140 Stonewall Avenue West, Suite 204, Fayetteville, GA 30214. The opportunity is open to all qualified bidders without specific set-aside restrictions, and all bids must comply with the detailed requirements outlined in the attached Invitation to Bid document. The work will be performed within Fayette County, Georgia, and the county anticipates selecting a contractor capable of safely and efficiently removing accumulated solids to maintain lagoon functionality and regulatory compliance. All questions regarding the bid should be directed to Colette Cobb, the primary point of contact, via email at ccobb@fayettecountyga.gov or by phone at 770-305-5115. The solicitation was posted on August 7, 2026, and additional information, including full bid documents, can be accessed through the official state procurement portal using the provided UI link. Contractors are responsible for reviewing all documentation thoroughly prior to submission, as failure to meet specifications or deadlines may result in bid rejection. The county reserves the right to accept or reject any or all bids without explanation, and award decisions will be made based on compliance, competitive pricing, and demonstrated technical capability.
Fayette County Board of Commissioners

POSTED

about 22 hours ago

DEADLINE

in about 1 month
View Details