Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on January 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Flood Park Restroom A Sewer Line Replacement

Closed
State & Local
Submission Closed
Solicitation #
2026-RFP-00308

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Federal
Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Contract K-27-2470-DBB-3-C
Solicitation # K-27-2470-DBB-3-C
Flatiron Dragados Constructors, Inc. has issued an invitation to bid for the Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A (Contract K-27-2470-DBB-3-C) for the City of San Diego. This project is funded by CASRF and the EPA and is subject to a Project Labor Agreement. The scope of work encompasses a wide range of civil and infrastructure services, including aggregate and pipe supply, asphalt paving, electrical work, fencing, geotextile supply, hydroseding, landscape and irrigation, minor concrete, QC testing, ready mix concrete supply, street sweeping, striping, survey, and water truck services. The contract is set aside for SBA certified Women-Owned Small Businesses (WOSB) and Disadvantaged Business Enterprises (DBE) through the Department of Transportation. Subcontractors must possess a valid California contractor license and be registered with the California Department of Industrial Relations per Public Contract Code Section I725.5. Bids must remain valid for 120 days from the submission date. Flatiron Dragados reserves the right to require payment and performance bonds equal to 100% of the contract value, with bond premium reimbursement capped at 3%. Interested parties should submit quotes via email to Veronica Garcia at [email hidden] or via fax. The response deadline is December 3, 2026.
Flatiron Dragados Constructors, Inc.

POSTED

about 2 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The contract involves the complete replacement of an approximately 130-foot section of failing 6-inch vitrified clay sewer pipe serving the Flood Park restroom facilities in California. The existing sewer line, originally installed during the park's construction, has deteriorated with issues such as a significant belly in the pipe, pipe joint separations allowing groundwater infiltration, and extensive root intrusion. The replacement scope includes the entire sewer line from the restroom building to the downstream manhole, with installation methods acceptable as either directional boring or open trench construction. Critical requirements include installing the new line with a minimum slope of 1% to maintain proper flow, reconnecting two lateral sewer connections from adjacent restroom fixtures—including a toilet and sink in a nearby adobe building and a public restroom with multiple sinks, toilets, and urinals—and installing a new cleanout for one of the lateral connections. The goal is a durable, fully functional sewer system free from infiltration and structural defects. Procured by the California Parks Department under solicitation number 2026-RFP-00308, this project is managed by the San Mateo County office located in Redwood City, with Travis Dunn serving as the primary contract administrator. The contract will be governed by San Mateo County’s standard contractual terms applicable for agreements under $200,000, which cover scope of services, payment terms, termination provisions, and compliance requirements. This contract framework ensures the county retains oversight and legal protections while holding the contractor accountable for delivering a sewer line replacement that meets performance and regulatory standards within the specified timeline.

General Info

Replace 130-foot deteriorated sewer pipe at California Flood Park restroom, ensuring proper slope and connections.

Documents

9
PDF, High priority: read this first17 pages · rfp
High
DOCX, High priority: read this first20 pages · contract-document
High
DOCX, High priority: read this first20 pages · contract-document
High
JPG
JPG
JPG
JPG
JPG
JPG

Read all 9 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 8 days
  • Columbia, SC Major Pipe Rehabilitation GeopolymerOpen now, due in 18 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Parks Department
Contacts1 person available
OfficeRedwood City, CA, 94063, USA

Interested Companies (21)

A3 PipelineSan Francisco, CA
ajm generalsanta rosa, CA
BidamericaSheridan, WY

See All 21 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The Flood Park Restroom sewer line consists of approximately 130 linear feet of 6-inch vitrified clay (terra cotta) pipe dating to the original construction. The existing sewer line is in a state of failure and requires full replacement. Documented deficiencies include a pronounced belly in the line, progressive separation of pipe joints resulting in groundwater infiltration, and significant root intrusion. The sewer line extends from the restroom facilities to the downstream manhole connection. Replacement of the entire sewer line from the restroom structure to the manhole is required. Acceptable construction methods include directional boring or open trench installation. The replacement line must be installed at the proper grade to ensure adequate conveyance of solids, with a minimum slope of 1 percent required. Two lateral connections currently discharge into the sewer line. One connection serves a toilet and sink located in the adjacent adobe building, as shown in the provided photographs. A new cleanout is required for this lateral connection. The second connection serves a public restroom facility consisting of two sinks, four toilets, and two urinals. All interior restroom connections are newly constructed, as documented in the restroom closet photograph, and must be properly reconnected to the replacement sewer line. The completed work shall result in a fully functional sewer system with appropriate slope, durable materials, and compliant connections to eliminate infiltration, root intrusion, and structural deficiencies.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS