Flood Road Resurfacing 2026

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Flood Road Resurfacing 2026 project involves the rehabilitation of a 20-foot-wide roadway segment between Escalon-Bellota Road and Waverly Road in San Joaquin County, California, with the goal of addressing significant structural deterioration including alligator cracking, potholes, and pavement settlement. The work includes resurfacing the entire length with a 0.25-foot layer of Hot Mix Asphalt (HMA) Type A, repairing damaged areas with full-depth HMA Type A, restoring 4-foot-wide shoulders with an 8% slope on one side and a conforming profile on the other, constructing 8-foot-wide HMA driveways, applying penetration treatment at intersection radii and extending 50 feet or to grade, adjusting survey monuments to the new finish grade, and removing high shoulder areas through earthwork. The project is located in a rural area adjacent to large trees that provide habitat for protected migratory birds, including the listed Swainson’s Hawk, which necessitates a pre-construction survey if any work occurs between February 15 and September 1 to ensure compliance with the Migratory Bird Treaty Act. The project qualifies for a categorical exemption under CEQA Section 15301(c) as it involves the rehabilitation of an existing facility, and the lead agency, San Joaquin County Public Works Department, has indicated administrative compliance through environmental fees for MND, CRP, and EIR filings. No formal contract pricing, line items, or award evaluation factors are specified, and the procurement is classified as a forecast; however, payment will be handled by the county’s Public Works Department at the designated remit-to address, with acceptance of work occurring on-site. The contractor will be responsible for meeting the technical specifications outlined in the scope, and while no federal FAR clauses or contracting officer information are detailed, the county retains full oversight for inspection and final acceptance. The project aims to reduce long-term maintenance, improve public safety, and enhance roadway reliability for local residents and travelers.

General Info

Resurface 20-ft roadway with HMA, repair shoulders and driveways, comply with bird protection rules, San Joaquin County oversees work.

Agency

California → San Joaquin County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Escalon-Bellota Road, Waverly Road, Stockton, CA

Set-Aside

NONE

Documents

(1)

Flood Road Resurfacing 2026 Notice of Exemption and Environmental Filing Fee Receipt

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Joaquin County
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Joaquin County
Office AddressN/A
Contacts
Fatima GutierrezAssistant Planner

Full Description

Show more
FLOOD ROAD RESURFACING 2026 Project Description Project Location: Flood Road: Escalon-Bellota Road to Waverly Road. See attached Vicinity Map. Project Justification: The original construction date and existing roadway structure for this portion of Flood Road are unknown. The road has been periodically chip sealed with the last being in 2024. The existing pavement surface has moderate structural failures with alligator cracking. The roadway has some potholes and pavement settlement. Scope of Work: The project will consist of: 1. Resurfacing existing roadway (20 feet wide) with 0.25 feet Hot Mix Asphalt (HMA) (Type A). 2. Repairing pavement structural failure areas with full depth 0.25 feet HMA (Type A). 3. Replenishing 4-foot-wide shoulder backing: 2 feet (8%) and 2 feet to conform. 4. Constructing 8 feet HMA (Type A) driveways. 5. Applying penetration treatment at all intersection radii plus 50 feet or to conform. 6. Adjusting existing survey monument frames and covers to finished grade. 7. Performing earthwork (Miscellaneous Areas) to remove high shoulder areas. Environmental Setting: In these portions of the San Joaquin County, land usage is primarily rural. There are many large trees adjacent to the project area. Nesting and migratory birds, protected by the Migratory Bird Treaty Act, may nest within these trees. Furthermore, the Swainson’s Hawk, a raptor species of concern within the State of California and listed as threatened may nest adjacent to or within the project area. A pre-construction survey for nesting Swainson’s Hawks and other migratory birds is recommended if construction is scheduled to occur from February 15th to September 1st. Beneficiaries: The public will see increased safety and fewer hazards with this well-maintained road. Overall, there will be reduced maintenance concerns and more reliability within the project area.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
27-008 FY26 LMIG Resurfacing Project
Solicitation # 27-008
The City of Sandy Springs is seeking sealed bids for the milling and resurfacing of approximately 22.35 miles of city roadways, requiring a minimum milling depth of one and one-half inches, targeted patching using either 12.5 mm or 19 mm materials as needed, and final paving with 12.5 mm asphalt at a rate of 165 pounds per square yard, or as otherwise directed by the City’s Engineer or authorized representative. The specific roadway segments to be worked are detailed in the Contract Documents, and the City retains the authority to modify the scope by adding or removing segments during the contract term, with corresponding adjustments to traffic control and mobilization costs to reflect those changes. All work must meet the technical specifications outlined, and bid evaluations will prioritize responsiveness and responsibility, with award going solely to the lowest compliant bidder who satisfies all minimum requirements. The solicitation, titled 27-008 FY26 LMIG Resurfacing Project and identified by number PE-66098-NONST-2027-000000144, was posted on August 7, 2026, with responses due by September 9, 2026. The project falls under the jurisdiction of the City of Sandy Springs in Georgia, and all work must be performed within the city limits. Interested bidders must submit sealed proposals by the deadline, and inquiries should be directed to Daniel Ramos, the primary point of contact, via email at DRamos@SandySpringsGA.gov or by phone at 770-206-1477. The contract is open to all qualified respondents without set-aside designations, and detailed specifications are available through the official procurement portal linked in the solicitation.
City of Sandy Springs

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
International
Town of Hinton - Request for Proposal - Town of Hinton - Tamarack Drive Rehabilitation (2026)
Solicitation # AB-2026-05583
The Town of Hinton is soliciting proposals for the comprehensive rehabilitation of Tamarack Drive scheduled for 2026, under solicitation number AB-2026-05583. The project encompasses a full range of infrastructure improvements including grading, installation of granular base course, curb and gutter construction, and application of asphalt concrete pavement to restore the roadway to modern standards. Additional scope elements include the installation of traffic cameras for enhanced monitoring and safety, as well as new pedestrian crossings to improve accessibility and compliance with current transportation guidelines. All work is to be performed within the municipal boundaries of Hinton, Alberta, with the expectation that contractors will adhere to local regulations and engineering specifications. Proposals must be submitted by September 1, 2026, at 8:00 PM Mountain Time, following the release of the request for proposal on August 7, 2026. The primary point of contact for inquiries is Michael Steffler, Project Manager, who can be reached via email at michael.steffler@wsp.com or by phone at 780-728-7398. The procurement is managed directly by the Town of Hinton with no set-aside provisions specified, and all interested parties are directed to the official Alberta purchasing portal for detailed documentation and submission requirements. The project reflects a strategic investment in community infrastructure aimed at improving transportation efficiency, public safety, and long-term durability of the road network.
Town of Hinton

POSTED

about 18 hours ago

DEADLINE

in 24 days
View Details