Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Flooring Demolition and Concrete Surface Preparation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Flooring Demolition and Concrete Surface Preparation involves providing specialized services for prime contractors on Georgia World Congress Center Authority facility projects. The scope of work includes the removal and disposal of existing sheet vinyl flooring, mechanical grinding of concrete substrates to eliminate surface irregularities, and the application of compatible concrete primers. The selected contractor will be responsible for utilizing industrial concrete grinders and debris removal equipment to deliver a clean, ground, and primed substrate. The project is categorized under NAICS code 238910 and was posted on November 3, 2026. Interested parties must submit their responses by the deadline of November 19, 2026, at 3:00 PM. This opportunity is managed through the state of Georgia's procurement system for work performed at Georgia World Congress Center Authority facilities.

General Info

Flooring demolition and concrete surface preparation for Georgia World Congress Center Authority facilities.

Place of Performance

GA, USA

Set-Aside

NONE

Documents

This scope was carved out of GWCC 11226 EC.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Thomas Murphy Ballroom BOH Flooring Replacement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia World Congress Center Authority
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs removal of existing flooring and mechanical preparation of concrete substrates for prime contractors on Georgia World Congress Center Authority facility projects. Removes and disposes of sheet vinyl flooring, performs concrete grinding, and applies compatible concrete primer to address surface irregularities. Utilizes industrial concrete grinders and debris removal equipment. Delivers a clean, ground, and primed concrete substrate.

Similar Contracts

Same NAICS industry code

More opportunities from Georgia World Congress Center Authority

Same awarding agency

NAICS: 238330
New
SLED
Thomas Murphy Ballroom BOH Flooring Replacement
Solicitation # GWCC 11226 EC
The Georgia World Congress Center Authority is soliciting proposals under RFP GWCC 11226 EC for the removal of existing sheet vinyl flooring and the installation of commercial-grade, non-slip safety flooring, specifically Altro Stronghold 30 or an approved equivalent, within the back-of-house corridors of the Thomas Murphy Ballroom in Atlanta, Georgia. The scope of work encompasses the entire process from demolition and concrete surface preparation to the installation of heat-welded seams, perimeter caulking, and integrated red directional floor signage. All work must adhere to applicable building codes, industry standards, and manufacturer specifications, with final acceptance contingent upon a GWCCA inspection of all finishes and signage. Proposals will be evaluated based on technical approach and materials (30%), cost proposal (30%), experience and qualifications (25%), and project schedule and coordination (15%). Interested firms must possess at least five consecutive years of experience in commercial safety flooring and are required to submit six sets of proposals, including a digital copy on a flash drive, by the specified deadline. Mandatory documentation includes a proposal certification form, a Georgia Security and Immigration Compliance Act affidavit, a non-discrimination certification, a reference sheet, and a qualification statement. A strict restriction of communication is in effect from the time of advertisement until the final award, and the successful awardee must provide a performance bond or irrevocable letter of credit equal to 100% of the total contract amount.
Flooring Contractors

POSTED

about 6 hours ago

DEADLINE

in 16 days
View Details
NAICS: 238220
SLED
Fire Protection
Solicitation # GWCC102626EC
The Georgia World Congress Center Authority is soliciting proposals under RFP GWCC102626EC for the complete removal and replacement of a 2,000 GPM diesel fire pump and associated controls and sensing components at Building C in Atlanta, Georgia. The scope of work includes furnishing and installing a new pump assembly, fire pump controller, jockey pump controller, and fuel tank with an overfill sensor, along with all necessary electrical work, permitting, testing, and commissioning. All installations must be code-compliant, specifically adhering to the applicable edition of NFPA 20 as adopted by Georgia. The successful contractor will be required to provide a performance bond or irrevocable letter of credit equal to 100 percent of the total contract amount and must adhere to a strict drug-free workplace policy. Proposals are due by November 11, 2026, and must be submitted in a sealed opaque envelope or box marked Sealed Proposal, including one original, five copies, and one electronic copy on a flash drive as a single PDF. Evaluation is based on technical approach and equipment (30 percent), cost proposal (30 percent), experience and qualifications (25 percent), and project schedule and coordination (15 percent). Pricing must be itemized, including a separate cost for fuel tank replacement and a deductive alternate for retaining the existing tank. A strict restriction of communication is in effect, prohibiting interested firms from contacting Authority staff or representatives regarding the solicitation outside of the designated procurement process.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

8 days ago

DEADLINE

in 8 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS