Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Department Of Defense was posted on July 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Flooring Removal and Installation Services

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract calls for the complete removal of existing damaged flooring and the installation of new flooring in MARSOC Buildings RR531 and RR532 located at Camp Lejeune, North Carolina, with strict adherence to military standards. Scope includes all necessary surface preparation, subfloor repairs, and finishing work to ensure durability and compliance with operational requirements. The project demands precision in execution to meet the high-performance standards expected in military facilities, covering everything from debris removal to final surface treatments. This is a small business set-aside subcontract under NAICS code 238350, exclusively available to small businesses as defined by the SBA. The solicitation was posted on July 9, 2026, with a response deadline of August 10, 2026, and is managed by NAVFACSYSCOM Mid-Atlantic under the Department of Defense. Performance must occur at the specified location in Camp Lejeune, and the work is expected to be completed in coordination with military protocols and timelines.

General Info

Remove and install new flooring at Camp Lejeune’s RR531/RR532 per military standards, small business set-aside.

NAICS

238350 - Finish Carpentry Contractors

Place of Performance

Camp Lejeune, NC, 28547, USA

Set-Aside

SBA

Documents

This scope was carved out of N4008526R9045.

The full solicitation package (11 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

MARSOC Buildings RR531 and RR532 Flooring Repairs

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navfacsyscom Mid-Atlantic
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Complete removal of damaged flooring and installation of new flooring in MARSOC Buildings RR531 and RR532, including surface prep, subfloor repair, and finishing to military standards.

More opportunities from Department Of Defense → Navfacsyscom Mid-Atlantic

Same awarding agency

NAICS: 236220
New
Federal
NH100 Engine Control Unit Replacement
Solicitation # N4008527R9006
The NH100 Engine Control Unit Replacement project, managed by Navfacsyscom Mid-Atlantic under solicitation N4008527R9006, involves the replacement of three Engine Control Units (ECUs) on emergency generators at the NH100 Naval Hospital in Camp Lejeune, North Carolina. The scope of work includes providing all labor, materials, and expertise to install ECUs, onboard controllers, custom fabricated wiring harnesses, pulse-controlled fuel injectors, and voltage regulators. The primary objective is to restore the emergency electrical distribution system to compliance, requiring the contractor to integrate components into existing PLC controllers and employ a verified Commissioning Agent to perform system acceptance tests in accordance with NFPA 110. This project is a total Small Business Set-Aside, and only M&R MACC Contractors listed on the General Requirements cover page are eligible to submit proposals. The estimated contract value ranges between $500,000 and $1,000,000. Performance is divided into two phases: a Submittal and Procurement Phase requiring technical submittals within 15 calendar days of award, and a Physical Construction and Commissioning Phase to be completed within 60 calendar days of receiving all manufacturer materials. Administrative requirements include a 20% bid bond, the use of Wide Area WorkFlow (WAWF) for invoicing, and adherence to the Buy American statute. The contractor must comply with North Carolina Building Codes, OSHA Safety Codes, and specific UFC standards. A preconstruction meeting must be held within 35 calendar days after award to address cybersecurity and safety protocols.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 20 days
View Details
NAICS: 236220
New
Federal
MULTIPLE BARRACKS BUILDING 1245 and 1246 RENOVATIONS BEAUFORT SOUTH CAROLINA MARINE CORPS BASES
Solicitation # N4008527R0038
Solicitation N40085-27-R-0038 is a Design-Bid-Build project issued by the Naval Facilities Engineering Systems Command, Mid-Atlantic, for the renovation of Enlisted Bachelor Quarters Buildings 1245 and 1246 at MCAS Beaufort, South Carolina. The project involves two buildings of approximately 28,531 square feet each, with a scope of work that includes repairing barracks rooms and building exteriors, installing new standing seam metal roofs, replacing exterior balcony steel framing, and performing HVAC upgrades to make-up and exhaust air systems. Additional requirements include site drainage improvements, replacement of fire suppression sprinkler heads, and the installation of new lightning protection. The estimated project magnitude is between $25 million and $100 million, with a performance period of 734 calendar days and liquidated damages set at $4,225.66 per day. This is an Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) restricted to specific MACC contractors, with the award based on the lowest lump sum price. The contractor must adhere to Davis-Bacon Act Wage Determination SC20260008 and provide performance and payment bonds within ten calendar days of award. Technical execution is governed by strict quality standards, including specific steel welding inspections and accredited laboratory testing for construction materials. Administrative requirements mandate the use of the Wide Area Work Flow (WAWF) system for monthly invoicing and the Electronic Construction and Facility Support Contract Management System (eCMS) for technical submittals. Proposals must include a bid guarantee of at least 20 percent of the proposed price, capped at $3 million, and proof of SAM registration.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
Federal
SH50 and HP259 HVAC Repairs
Solicitation # N4008527R9004
Solicitation N40085-27-R-9004 is a small business set-aside for HVAC repairs and modernization at MCB Camp Lejeune, North Carolina, with an estimated value between 1 million and 5 million dollars. The project is restricted to Mechanical MACC Contractors and is awarded based on the lowest price. The scope of work is divided into two primary components: Building SH50, which requires a turnkey modernization including the replacement of nine water-to-air heat pumps, one water-to-water heat pump, one air handling unit, and two pumps, along with BAS integration and hydronic loop cleaning; and Building HP259, which involves the replacement of a 20-ton split system air handling unit and matching outdoor condensing unit, including all associated ductwork and electrical connections. The contract must be completed within 180 days of award. Performance is subject to strict scheduling constraints, including a requirement for two weeks' notice to tenants and the mandate that work at Building HP259 and all power outages occur outside normal operating hours. Contractors must adhere to NFPA standards, ADA requirements, and the Buy American Act. Invoicing is processed through Wide Area WorkFlow, and the government reserves the unilateral right to award the second line item within 120 days of the initial award. Proposals must be submitted for all line items to be considered responsive.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS